Billing Code 9111-23-P
DEPARTMENT OF HOMELAND SECURITY
Federal Emergency Management Agency
44 CFR Part 206
[Docket ID FEMA-2023-0005]
RIN 1660-AB09
Update of FEMA’s Public Assistance Regulations
AGENCY: Federal Emergency Management Agency, DHS.
ACTION: Notice of proposed rulemaking.
SUMMARY: The Federal Emergency Management Agency (FEMA, agency, or we)
proposes to revise its Public Assistance program regulations to reflect current statutory
authorities and implement program improvements. The proposed rule would incorporate
changes brought about by amendments to the Robert T. Stafford Disaster Relief and
Emergency Assistance Act (Stafford Act). FEMA is also proposing clarifications and
corrections to improve the efficiency and consistency of the Public Assistance program.
DATES: Comments must be submitted by [INSERT DATE 60 DAYS AFTER DATE
OF PUBLICATION IN THE FEDERAL REGISTER].
ADDRESSES: You may submit comments, identified by Docket ID FEMA-2023-0005,
via the Federal eRulemaking Portal: www.regulations.gov. Search for the Docket ID and
follow the instructions for submitting comments.
FOR FURTHER INFORMATION CONTACT: Robert Pesapane, Director, Public
Assistance Division. Phone: (202) 646-3834. Email: fema-recovery-papolicy@fema.dhs.gov.
SUPPLEMENTARY INFORMATION:
Table of Contents
I. Public Participation and Request for Comments
II. Executive Summary

A. Background and Purpose of the Regulatory Action
B. Summary of Major Provisions
III. Discussion of the Proposed Rule
A. 44 CFR part 206, subpart A—General
B. 44 CFR part 206, subpart C—Emergency Assistance
C. 44 CFR part 206, subpart G—Public Assistance Project Administration
D. 44 CFR part 206, subpart H—Public Assistance Eligibility
E. 44 CFR part 206, subpart K—Community Disaster Loans
IV. Regulatory Analysis
A. Executive Order 12866, as amended, Regulatory Planning and Review,
Executive Order 13563, Improving Regulation and Regulatory Review, and
Executive Order 14094 Modernizing Regulatory Analysis
B. Regulatory Flexibility Act
C. Unfunded Mandates Reform Act of 1995
D. National Environmental Policy Act
E. National Historic Preservation Act of 1966
F. Endangered Species Act
G. Paperwork Reduction Act of 1995
H. Privacy Act/E-Government Act
I. Executive Order 13175, Consultation and Coordination with Indian Tribal
Governments
J. Executive Order 13132, Federalism
K. Executive Order 11988, Floodplain Management
L. Executive Order 11990, Protection of Wetlands
M. Executive Orders 12898 and 14096, Environmental Justice
N. OMB Circular A-119, Voluntary Consensus Standards
O. Congressional Review of Agency Rulemaking
Table of Abbreviations
ADA
CDL
CFR
CPI-U
CRA
DFA
DHS
DRRA
EA
EMAC
FEMA
GAO
HOW
HUD
NAC
NEPA
NIST
OMB
PAPPG
PKEMRA
PNP
PV

Americans with Disabilities Act
Community Disaster Loan
Code of Federal Regulations
Consumer Price Index for All Urban Consumers
Congressional Review of Agency Rulemaking Act
Direct Federal Assistance
Department of Homeland Security
Disaster Recovery Reform Act
Environmental Assessment
Emergency Management Assistance Compact
Federal Emergency Management Agency
Government Accountability Office
Houses of Worship
Department of Housing and Urban Development
National Advisory Committee
National Environmental Policy Act
National Institute of Standards and Technology
Office of Management and Budget
Public Assistance Program and Policy Guide
Post-Katrina Emergency Management Reform Act of 2006
Private Nonprofit
Present Value

SBA
SORN
SRIA
Stafford Act

Small Business Administration
System of Records Notice
Sandy Recovery Improvement Act of 2013
Robert T. Stafford Disaster Relief and Emergency Assistance Act

I. Public Participation and Request for Comments
Interested persons are invited to participate in this rulemaking by submitting
comments and related materials. We will consider all comments and material received
during the comment period.
If you submit a comment, include the Docket ID FEMA-2023-0005, indicate the
specific section of this document to which each comment applies, and give the reason for
each comment. All submissions may be posted, without change, to the Federal
eRulemaking Portal at www.regulations.gov, and will include any personal information
you provide. Therefore, submitting this information makes it public. You may wish to
read the Privacy and Security Notice that is available via a link on the homepage of
www.regulations.gov.
For access to the docket to read background documents or comments received, go
to the Federal eRulemaking Portal at www.regulations.gov.
II. Executive Summary
A. Background and Purpose of the Regulatory Action
FEMA is responsible for administering and coordinating the Federal Government
response to Presidentially declared disasters pursuant to the Robert T. Stafford Disaster
Relief and Emergency Assistance Act, as amended (Stafford Act), Pub. L. 93-288, 42
U.S.C. 5121 et seq. When a catastrophe occurs in a State or affects the members of a
Tribal community, the State’s Governor or Tribal Chief Executive may request a
Presidential declaration of a major disaster pursuant to Section 401 of the Stafford Act.1
Such a request must be based on a finding that the disaster is of such severity and

42 U.S.C. 5170(a), (b); 44 CFR 206.36(a).

magnitude that an effective response is beyond the capabilities of the State or Tribal
government and the affected local governments, and that Federal assistance is necessary.2
The President’s declaration of a disaster will designate the areas within a State, or for an
Indian Tribal government, where Federal assistance may be made available (including
local governments such as counties, parishes, or Tribal lands, if appropriate) and identify
the types of assistance that are authorized under the declaration,3 although other types
may be authorized later.4 A major disaster declaration may authorize all, or only
particular types of, supplemental Federal assistance requested by the Governor or Tribal
Chief Executive.5
One of the programs that may be authorized by a declaration is the Public
Assistance program, which provides a broad range of assistance to State, Tribal,
Territorial and local governments.6 It provides assistance for emergency protective
measures, such as emergency evacuation, sheltering, and debris removal, as well as
financial assistance for the permanent restoration of facilities.7 In addition, the Stafford
Act authorizes Community Disaster Loans for any local or Tribal government that has
suffered a substantial loss of tax and other revenues as a result of a major disaster, and
that demonstrates a need for financial assistance to perform its governmental functions.8
FEMA proposes to amend its Public Assistance and Community Disaster Loan
program regulations to both improve program administration and incorporate statutory
changes relating to Public Assistance and Community Disaster Loans. These include the
Post-Katrina Emergency Management Reform Act of 2006 (PKEMRA), Pub. L. 109-295,
42 U.S.C. 5170.
44 CFR 206.40(a).
4 44 CFR 206.40(c).
5 44 CFR 206.40(a).
6 Generally, the State, Territorial, or Indian Tribal government for which the emergency or major disaster is
declared is the recipient. The applicant is a State, Tribal, or Territorial agency, local government, or
eligible private nonprofit organization submitting an application to the recipient for assistance under the
recipient’s grant. Upon award, the recipient notifies the applicant of the award, and the applicant becomes
a subrecipient.
7 42 U.S.C. 5170b, 5172, and 5173.
8 42 U.S.C. 5184.
2
120 Stat. 1394, the Security and Accountability for Every Port Act of 2006 (SAFE Port
Act), Pub. L. 109-347, 120 Stat. 1884, the Pets Evacuation and Transportation Standards
Act of 2006 (PETS Act), Pub. L. 109-308, 120 Stat. 1725, the Sandy Recovery
Improvement Act of 2013 (SRIA), Pub. L. 113-2, 127 Stat. 39, the Emergency
Information Improvement Act of 2015, Pub. L. 114-111, 129 Stat. 2240, the Bipartisan
Budget Act of 2018, Pub. L. 115-123, 132 Stat. 64, and the FAA Reauthorization Act of
2018, Division D, Disaster Recovery Reform Act of 2018 (DRRA), Pub. L. 115-254, 132
Stat. 3438.
B. Summary of Major Provisions
The proposed rule would amend the Public Assistance program regulations at
Title 44, part 206, of the Code of Federal Regulations (CFR) to reflect current statutory
authorities, clarify the requirements for program eligibility, and improve program
administration. Most notably, FEMA proposes to:
•

Incorporate PKEMRA:
o Amend section 206.11 to include “disability” and “English proficiency” in
the list of the grounds upon which discrimination in the provision of
assistance is prohibited.
o Amend section 206.221 to include performing arts facilities and
community arts facilities as eligible Private Nonprofit (PNP) facilities.
o Amend section 206.225 to cover essential assistance for the rescue, care,
shelter, and essential needs of household pets, service animals, and
assistance animals.
o Amend section 206.226(c)(1) (proposed section 206.226(i)(1)) to include
education in the list of critical services that qualify PNPs to apply for
Public Assistance without having first applied for an SBA loan.

•

Incorporate SRIA:

o Amend section 206.228 to incorporate Public Assistance Alternate
Procedures for Debris Removal (Stafford Act section 428) to make
straight-time labor costs eligible for budgeted employees conducting
eligible debris removal activities.
o Make revisions throughout 44 CFR part 206 to reflect that Indian Tribal
governments may act as recipients or subrecipients for the Public
Assistance program.
•

Incorporate the Bipartisan Budget Act of 2018:
o Amend the definition of “private nonprofit organization” in section
206.2(19) and section 206.221 to clarify requirements for houses of
worship (HOWs) that may be exempt from the requirements to apply for
tax exempt status under Internal Revenue Code 501(c)(3) or applicable
State laws.
o Amend definition of “private nonprofit facility” in section 206.221 to
include HOWs and change the term “essential governmental service
facilities” to “essential social services facilities.”

•

Incorporate DRRA:
o Amend section 206.12 to include long-term recovery groups, domestic
hunger relief organizations, and other relief organizations.
o Amend section 206.201 to add definitions of the terms “resilient” and
“resiliency.”
o Revise proposed sections 206.204(b)(4) and 206.226 to eliminate funding
reductions for alternate projects.
o Amend definition of “private nonprofit facility” in section 206.221 to
include “center-based childcare” facilities.

o Amend definition of “essential social service facility” in section 206.221
to include food banks.
o Amend section 206.226(d) (proposed section 206.226(c)) to incorporate
the requirement to use the latest codes and standards.
•

Remove the definition of “emergency work” in section 206.201 and refer to
“debris removal” and “emergency protective measures” separately in sections
206.204 (proposed section 206.205), 206.208 (proposed section 206.209), and
206.225, due to differing legal criteria between debris removal and emergency
protective measures.

•

Amend section 206.202(d)(2) (proposed section 206.202(d)(4)) to apply the
minimum threshold to each site within a Project Worksheet (PW) rather than to
the PW as a whole to prevent applicants from improperly grouping together de
minimis sites to reach the threshold.

•

Amend section 206.202(d) to provide deadlines for the submission of certain
work and cost documentation to avoid undue delay and administrative cost and to
help ensure timely recovery.

•

Amend section 206.202(e) to remove a non-statutory deadline previously imposed
on FEMA for obligation of funds to provide the necessary flexibilities to maintain
the smooth administration of the Public Assistance program.

•

Amend section 206.205 (proposed section 206.206) to add deadlines for the
submission of small project certifications and large project cost documentation to
help ensure timely closeout of projects.

•

Amend section 206.221 to reflect current Stafford Act definitions, which include
rehabilitational facilities and broadcasting facilities.

•

Amend section 206.225 to add paragraph addressing temporary relocation of
public and nonprofit facilities that provide an eligible essential community service
and define “essential community services.”

•

Amend subpart K, “Community Disaster Loans,” to reflect the current statutory
loan maximums.

•

Align terminology and definitions with 2 CFR part 200, tailoring to FEMA
authorities and requirements as needed.

III. Discussion of the Proposed Rule
This proposed rule would revise FEMA’s Public Assistance program and
FEMA’s Community Disaster Loan regulations to reflect current statutory authority and
agency practice. FEMA is also proposing amendments to improve the efficiency and
consistency of the Public Assistance program and improve Public Assistance applicants’
understanding of the program. This rule would affect 44 CFR 206.2, 206.11-12, 206.62,
206.200-210, 206.220-228, 206.361, and 206.363-364.
Throughout this rule, FEMA proposes a number of non-substantive, clarifying
edits as follows, which will not generally be discussed separately in the section-bysection analysis below. FEMA proposes to revise the word “shall” to “must” or “will”
and the word “which” to “that” as appropriate, consistent with current drafting best
practices. FEMA intends these edits to clarify, but not change, the regulations’ meaning.
Similarly, this rule proposes a number of non-substantive typographical corrections,
stylistic edits to improve clarity, and citation corrections. FEMA also proposes to update
references to various FEMA positions and offices to reflect their current titles, such as
replacing “Disaster Assistance Directorate” with “Recovery Directorate.” Similar
terminology changes include replacing “event” with “incident,” to improve clarity by
matching the defined term in 44 CFR 206.32(e), and replacing “grant” with “award,” to
improve clarity by matching the terminology used in 2 CFR part 200.

FEMA proposes to replace references in its regulations to “Project Worksheet”
with the generic term “Project Application”9 because FEMA is in the process of revising
information collection 1660-0017, Public Assistance Program, to, inter alia, refer to
“Project Application”, where it previously referred to “Project Worksheet.” These
proposed changes to FEMA’s regulations would not change how the form is used or
processed in the Public Assistance program. Instead, FEMA proposes this amendment to
ensure clarity and consistency in the regulations.
Additionally, FEMA proposes to redesignate various sections to reflect the
addition or removal of other sections and to update internal cross-references accordingly.
Further, the proposed rule includes revisions to FEMA’s regulations to reflect that Indian
Tribal governments (Tribal Governments or Tribes) may be recipients or subrecipients
for the purpose of Public Assistance, consistent with section 1110 of SRIA.10 Finally,
FEMA proposes to revise various sections throughout the rule to make clear that, where
appropriate, a Regional Administrator’s designee may take actions on his or her behalf,
such as reviewing proposals and approving extensions of time. This is not a substantive
change, but simply makes the use of a designee explicit to improve clarity.
In early preparation for this rulemaking, FEMA solicited input from the
Administrator’s National Advisory Council (NAC). The NAC recommended revisions to
the Public Assistance regulations to reflect FEMA's post-Katrina practices and postKatrina legislative amendments to the Stafford Act.11 The NAC’s recommendations
included improving State administrative plans, streamlining and improving project

When discussing other proposed changes in this rule, we use the term “Project Worksheets” to avoid
confusion.
10 Pub. L. 113-2, 127 Stat. 39, 47. Tribal declaration requests are currently handled under FEMA’s Tribal
Declarations Pilot Guidance, and this rule does not propose any changes to those procedures. For more
information, see Tribal Declarations Pilot Guidance, https://www.fema.gov/disaster/tribal-declarations (last
accessed June 12, 2024).
11 See NAC Memo, Recommendations on the Stafford Act and Related Federal Regulations: Public
Assistance and Individual Assistance Issues (Aug. 19, 2008), available at
https://www.fema.gov/pdf/about/nac/hp/stafford_act_rec_081908.pdf.
worksheets, and reimbursing State, Tribal, Territorial, and local governments for forceaccount labor for emergency protective measures and debris removal. Consistent with
those recommendations, FEMA is proposing updates to its regulations to reflect current
statutory authorities and agency practices. As is discussed in more detail below, this rule
proposes revisions to the project application process and State administrative plan
requirements and proposes adding a provision that reflects the eligibility of straight-time
force account labor for debris removal, which FEMA previously implemented via policy.
A. 44 CFR part 206, subpart A—General
i. Section 206.2 Definitions
Section 206.2 sets forth the defined terms that apply throughout 44 CFR part 206.
FEMA proposes to revise paragraph (a)(14) to clarify that the term “hazard
mitigation” means any cost-effective measure intended to reduce the potential for damage
from a “future” disaster event. Hazard mitigation does not address damage from disasters
that have already occurred. This is not a substantive change and is simply intended to
improve clarity.
Also, in paragraph (a)(14), FEMA proposes to change the word “event” to
“impacts.” While throughout the rest of this rule we are proposing to replace “event”
with “incident,” to improve clarity by matching the defined term in 44 CFR 206.32(e), in
paragraph (a)(14), it is more accurate to refer to the impacts of a disaster, since those
impacts are what mitigation measures seek to address. The use of this term is consistent
with FEMA’s guidance on the subject.12 This is not a substantive change and does not
change the meaning of “hazard mitigation.” Instead, we simply intend to improve clarity.

See Public Assistance Program and Policy Guide, ver. 4, FP 104-002-2, at 153 (June 1, 2020) (PAPPG),
available at https://www.fema.gov/sites/default/files/documents/fema_pappg-v4-updated-links_policy_6-12020.pdf. Version 5 of the Public Assistance Program and Policy Guide is currently under review by the
Office of Information and Regulatory Affairs. FEMA will update the Public Assistance Update final rule
to reflect relevant amendments from Version 5.
In paragraph (a)(19)(i), FEMA proposes to update the outdated reference to the
Internal Revenue Code of 1954. The current authority is the Internal Revenue Code of
1986, as amended.13
FEMA also proposes to add a new paragraph (a)(19)(iii) to discuss the
requirements for PNP organizations that are exempt from the requirements to apply for
Internal Revenue Code section 501(c)(3) status or applicable State or Tribe tax exempt
status. Instead of the requirement under paragraphs (a)(19)(i) and (ii) that such an
organization must have an effective ruling letter from the Internal Revenue Service or
appropriate documentation from the State, FEMA proposes that such an organization may
establish their status through: (1) articles of association, bylaws, or other organizing
documents indicating that it is an organized entity and (2) a certification that it is
compliant with section 501(c)(3) of the Internal Revenue Code and State or Tribal law
requirements. This proposed change is consistent with current FEMA guidance on this
issue.14
We also propose adding a reference to Tribes in paragraph (a)(19)(ii), to make
clear that PNP organizations organized under Tribal law do not need to provide
documentation from a State due to independent Tribal sovereignty.
Paragraph (a)(20) provides the general definition of “Public Assistance.” The
definition includes references to other sections in the regulations that contain further
information on Public Assistance. We propose to amend those references to add subpart
I, Public Assistance Insurance Requirements, subpart J, Coastal Barrier Resources Act,
and subpart M, Minimum Standards, which provide additional detail on the Public
Assistance program, especially restrictions or limitations on the amount of funding
allowed in subparts G and H, Public Assistance Project Administration and Public

13
Tax Reform Act of 1986, Pub. L. 99-514, sec. 2(a), 100 Stat. 2085, 2095.
See PAPPG at 43.

Assistance Eligibility, respectively. We also propose to replace the words “individuals
and families” with “individuals and households,” to match the language used in section
408 of the Stafford Act. FEMA intends this change to improve clarity and consistency
and is not a substantive change.
We propose adding new paragraphs (a)(26) and (a)(27) to include definitions of
the terms “Tribal Authorized Representative” and “Tribal Coordinating Officer.” These
new paragraphs mirror the definitions of “Governor’s Authorized Representative” and
“State Coordinating Officer” in (a)(13) and (a)(23). As with the other changes proposed
throughout this rule to add references to Indian Tribal governments, these proposed
definitions would create provisions for Tribal governments equivalent to those already
provided for State governments to ensure consistency with the Stafford Act.
ii. Section 206.11 Nondiscrimination in disaster assistance
Section 689a of PKEMRA amended section 308(a) of the Stafford Act to add
“disability” and “English proficiency” to the list of protected classes. Public Assistance
grant recipients are already prohibited from discrimination on these grounds under other
laws as codified in the DHS Standard Terms and Conditions15 and FEMA has already
expanded its civil rights compliance and enforcement activities to include these two
additional categories. FEMA now proposes to revise paragraph 206.11(b) to reflect this.
The revision would improve consistency and clarity by making the list of classes in
paragraph (b) match the list in section 308(a) of the Stafford Act.
In addition, although this proposed revision, and others discussed below, originate
from amendments to the Stafford Act, and do not involve the exercise of agency
discretion, they are consistent with the principles of equity that FEMA seeks to advance

See FY 2023 DHS Standard Terms and Conditions (Nov. 29, 2022),
https://www.dhs.gov/sites/default/files/202301/FY%202023%20DHS%20Terms%20and%20Conditions%20Version%202%20Dated%20November%2
029%202022.pdf.
in all its programs. We hope that these changes to the regulations would help highlight
these provisions, such as nondiscrimination in disaster assistance, and their importance in
every part of FEMA’s mission.
iii. Section 206.12 Use and coordination of relief organizations
Section 309(a) of the Stafford Act authorizes the President to utilize, with their
consent, the personnel and facilities of certain relief or disaster assistance organizations
in providing relief and assistance under the Act. Section 309(b) authorizes the President
to enter into agreements with these same organizations to coordinate their disaster relief
activities. This authority is codified in the regulations at 44 CFR 206.12.
Section 1227 of DRRA amended section 309 of the Stafford Act to add long-term
recovery groups and domestic hunger relief and other relief organizations to the lists of
organizations whose personnel and facilities may be used and with whom coordination
agreements may be entered into. Accordingly, FEMA proposes to revise paragraphs (a)
and (b) of section 206.12 to reflect this statutory change by replacing the existing
reference to “other voluntary organizations” with “long-term recovery groups, domestic
hunger relief organizations, and other relief or voluntary organizations.”
Also, in paragraph (b), FEMA proposes to revise “American Red Cross” to
“American National Red Cross” to match the name used in section 309(b) of the Stafford
Act.
B. 44 CFR part 206, subpart C—Emergency Assistance
In section 206.62, FEMA proposes non-substantive revisions related to Indian
Tribal governments. Specifically, current paragraphs (a) through (c) and (g) mention
assistance available to State and local governments under an emergency declaration.
Section 1110 of SRIA extended this assistance to Indian Tribal governments,16 but they

Pub. L. 113-2, 127 Stat. 39, 47.

are not mentioned in this section. FEMA proposes to add explicit references to Indian
Tribal governments to properly reflect this eligibility.
C. 44 CFR part 206, subpart G—Public Assistance Project Administration
i. Section 206.200 General
Section 206.200 provides a general overview to Subpart G, which governs the
administration of the Public Assistance Program. We propose numerous non-substantive
changes to this section to make the language more concise and move provisions to other
sections in the regulations where they are more logically connected. The proposed
amendments, however, would not remove any of the substantive provisions in § 206.200
from part 206 entirely.
We propose to remove the headings of paragraphs (a) and (b), since they are
unnecessary and to be consistent with proposed paragraphs (c) and (d), which would not
have headings. We further propose to revise paragraph (b) by simplifying its provisions.
The first sentence of current paragraph (b)(1) would be redesignated as paragraph (b); the
second sentence would be edited for clarity and designated as a new paragraph (c),
because it addresses recipient and subrecipient responsibilities, rather than FEMA’s
responsibilities. We specifically propose to remove the words “we expect” from
proposed paragraph (c), since adherence to the Stafford Act and FEMA’s regulations is a
clear legal requirement.
Current paragraph (b)(2) discusses the applicability of the “Uniform
Administrative Requirements, Cost Principles, and Audit Requirements for Federal
Awards,” published at 2 CFR parts 200 and 3002. Since the specific applicability of 2
CFR part 200 is addressed in other sections of subpart G,17 we propose to remove
See current 44 CFR 206.202(a) (stating that the recipient is “responsible for processing subgrants to
applicants under 2 CFR parts 200 and 3002, and 44 CFR part 206, and your own policies and procedures”);
current 44 CFR 206.205(b) (stating that the recipient shall certify that payments for a project were made in
accordance with 2 CFR 200.305); current 44 CFR 206.207(a) (stating that the “Uniform administrative
requirements which are set forth in 2 CFR parts 200 and 3002 apply to all disaster assistance grants and
subgrants”).
paragraph (b)(2). The proposed rule would replace it with a new paragraph (d) stating
generally that the regulations at 2 CFR part 200 apply to all Public Assistance grants and
to all recipients and subrecipients of Public Assistance grants except where those
provisions are inconsistent with the Stafford Act or FEMA’s regulations. This is a nonsubstantive change intended to improve clarity and readability.
Current paragraph (b)(2)(i) states that FEMA expects the recipient to inform
subrecipients about the status of their applications, including notification of FEMA’s
approvals of Project Worksheets and FEMA’s estimates of when FEMA will make
payments. These specific requirements more appropriately belong in section 206.202,
which addresses application procedures, rather than section 206.200, which addresses
general requirements. Therefore, we propose to remove section 206.200(b)(2)(i) and add
this provision to section 206.202 in proposed paragraphs (b)(4), on recipient
responsibilities, and (e)(2), on grant approval. Notifying subrecipients of FEMA’s
approvals is an important requirement and one that warrants repeating in both places in
section 206.202.
Section 206.200(b)(2)(ii) states that FEMA expects the recipient to pay the full
amounts due to the subrecipient as soon as practicable after FEMA approves payment,
including the State contribution required in the FEMA-State Agreement. We propose to
remove paragraph (b)(2)(ii) because this provision is already included in current section
206.205(a) (proposed 206.206(a)), regarding payment of claims for small projects. We
propose to add an equivalent provision regarding payment for large projects in proposed
section 206.206(b)(3), so that the requirement is still covered in both contexts.
Finally, current section 206.200(b)(2)(iii) states that FEMA expects the recipient
to “pay the State contribution consistent with State laws.” Consistent with the other
proposed changes to paragraph (b)(2) and for better organization, we propose to remove
paragraph (b)(2)(iii) and add this provision to proposed 206.206(b), which addresses

payment of claims for large projects. We further propose to add a similar provision for
small projects in proposed 206.206(a).
ii. Section 206.201 Definitions used in this subpart
FEMA proposes several changes to the definitions in section 206.201. We
propose to remove the paragraph designations throughout the section and reorder the
definitions alphabetically.
We propose to revise the definition of “applicant.” The existing definition
includes eligible private nonprofit organizations as identified in Subpart H of this
regulation. For clarity, we propose replacing this language with “private nonprofit
organization or institution that owns or operates a private nonprofit facility as defined in
§ 206.221,” which is consistent with the language used in section 206.222(b). Eligibility
for FEMA Public Assistance remains facility-based; this revision would not impact the
eligibility of facilities operated by private nonprofit organizations.
We propose to remove the definition of “emergency work” in this section to avoid
confusion. Under current practice, FEMA identifies two categories of emergency work:
debris removal and emergency protective measures. Due to differing legal criteria
between the two, we propose to refer to “debris removal” and “emergency protective
measures” separately in the sections where the term “emergency work” was used:
sections 206.204 (proposed 206.205), 206.208 (proposed 206.209), and 206.225. This
revision would improve clarity and would not be a substantive change to the eligibility of
emergency work.
In the definition of “facility,” we propose to remove the words “publicly or
privately owned” because they are unnecessary and do not affect the meaning of the term.
We also propose to replace the word “works” with “structure,” because the latter term is
more commonly used in FEMA’s regulations and guidance. Neither change is

substantive or alters the definition of facility; instead, we propose them to improve clarity
and consistency.
We propose replacing the defined term “grant” with “award,” consistent with
changes proposed throughout this rule to comport with the language used in 2 CFR part
200. We also propose specifying in the definition of the term that it means the financial
assistance “that the recipient receives from FEMA” to avoid ambiguity.
We propose removing the definition of “hazard mitigation” in section 206.201
because it is duplicative of the definition in section 206.2. The definition provided in
section 206.2 applies throughout 44 CFR part 206 and renders the definition in this
section redundant.
We propose to simplify the definition of “permanent work” by replacing the
current definition with “work performed pursuant to section 406 of the Robert T. Stafford
Disaster Relief and Emergency Assistance Act, 42 U.S.C. 5172.” Recent amendments to
section 406, such as DRRA section 1235(b), have rendered the definition of “permanent
work” in section 206.201 incomplete or inaccurate. The current definition in section
206.201 ties restorative work to “current applicable standards,” but the Stafford Act now
requires “conformity with the latest published editions of relevant consensus-based
codes, specifications, and standards that incorporate the latest hazard-resistant designs . . .
.”18 Rather than continuing to update the regulatory definition each time section 406 is
amended, we propose to simply refer generally to work performed pursuant to that
section. This proposed revision would bring the regulatory definition of the term
“permanent work” up to date with the current statutory provisions and avoid unnecessary
confusion and administrative burden in the future. This revision would not change
eligibility under section 406 or otherwise impact FEMA’s implementation of that section.

42 U.S.C. 5172(e)(1)(A)(ii).

We propose to remove from the definition of “project” the statement that “the
scope of work and cost estimate for a project are documented on a Project Worksheet
(FEMA Form 90-91).” The Project Worksheet is a significant part of the Public
Assistance process and merits its own definition. Therefore, we propose to add a standalone definition describing the items that are included on the form. However, FEMA is
in the process of revising information collection 1660-0017, Public Assistance Program,
and will be replacing the term “Project Worksheet” with “Project Application.”
Therefore, we propose defining the term “Project Application” instead of “Project
Worksheet.” We also propose to remove from the definition of “project” the statement
that FEMA “must approve a scope of eligible work and an itemized cost estimate before
funding a project.” We propose to capture these requirements in the definitions of
“project approval” and “Project Application.”
Also, in the definition of “project approval,” we propose revising the first
sentence to replace “the process in which the Regional Administrator, or designee,
reviews and signs an approval of work and costs” with “the process in which the
Regional Administrator, or designee, reviews a proposed project and approves the work
and costs.” FEMA believes the proposed language more clearly and accurately describes
the review and approval process. This would be a clarifying edit and would not
substantively affect the meaning of the term. Additionally, we propose removing the last
sentence of the definition, which states “Such approval is also an obligation of funds to
the recipient.” Certain circumstances, such as a lack of available funding, could prevent
FEMA from immediately obligating funds upon approval of a Project Worksheet.
Removing this language from the definition would avoid confusion in such situations.
We also propose replacing “Project Worksheet” with “Project Application, consistent
with the pending changes to information collection 1660-0017, Public Assistance
Program.

As mentioned above, we propose adding a new definition of “Project
Application” to read as follows: “Project Application is used to document the location,
scope of work, cost or cost estimate, terms and conditions, and information required for
approval. For permanent work, the form is also used to document damage description
and dimensions.” This term would be the updated term for “Project Worksheet,” which
is not currently defined but is used throughout this subpart. We do not intend for the
proposed definition to substantively change how Project Worksheets have been (and
Project Applications will be) used in the Public Assistance program. Instead, we simply
propose to provide clarity and ensure consistency in FEMA’s regulations.
In 2023, the Biden-Harris Administration issued the National Climate Resilience
Framework noting the intensifying impacts of climate change are costing lives, disrupting
livelihoods, and causing billions of dollars in damages.19 The Administration intends for
the Federal Government to serve as a partner with local communities by reforming and
modernizing Federal programs in ways that strengthen climate resilience. In 2018,
Section 1235(d) of the DRRA amended section 406(e) of the Stafford Act to require that
FEMA issue a final rule defining the terms “resilient” and “resiliency.” Consistent with
that requirement, we propose defining the term “resilient” as “able to prepare for threats
and hazards, adapt to changing conditions, and withstand and recover rapidly from
adverse conditions and disruptions” and the term “resiliency” as “the ability to prepare
for threats and hazards, adapt to changing conditions, and withstand and recover rapidly
from adverse conditions and disruptions.” If adopted, these definitions would help
promote consistent terminology across FEMA’s programs and would satisfy FEMA’s
obligations under DRRA section 1235(d) and Stafford Act section 406(e).

The White House, National Climate Resilience Framework (September 2023),
https://www.whitehouse.gov/wp-content/uploads/2023/09/National-Climate-Resilience-FrameworkFINAL.pdf.
These definitions mirror the definition of “resilience” used in FEMA’s National
Resilience Guidance,20 which is based on the definition in Presidential Policy Directive
(PPD) 21.21 These definitions also mirror the definition of “resilience” used in the
National Climate Resilience Framework.22 FEMA previously used a similar definition of
“resilience” in guidance on DRRA section 1325(b) and on the Building Resilient
Infrastructure and Communities program.23 FEMA considered a few other definitions,
including two based on PPD-824 and a National Institute of Standards and Technology
(NIST) definition,25 but proposes the ones given above as they provide the clearest
articulation of resilience principles for the purpose of the Public Assistance program, and
for consistency with the National Resilience Guidance.
Consistent with the requirement of DRRA section 1235(d), FEMA consulted with
the heads of relevant Federal departments and agencies in developing these proposed
definitions.26 As part of the National Resilience Guidance, FEMA consulted with a broad
range of stakeholders, including the Mitigation Framework Leadership Group (MitFLG)
and the Recovery Support Function Leadership Group (RSFLG). These groups comprise
a wide range of Federal departments and agencies with equities in national hazard

See FEMA, National Resilience Guidance: Background and Key Concepts (March 2023),
https://www.fema.gov/sites/default/files/documents/fema_national-resilience-guidance-projectbackground_2023.pdf. See also FEMA, National Resilience Guidance, https://www.fema.gov/emergencymanagers/national-preparedness/plan/resilience-guidance (last accessed June 12, 2024).
21 Presidential Policy Directive 21, Critical Infrastructure Security and Resilience (Feb. 12, 2013), available
at https://obamawhitehouse.archives.gov/the-press-office/2013/02/12/presidential-policy-directive-criticalinfrastructure-security-and-resil.
22 Presidential Policy Directive 21, Critical Infrastructure Security and Resilience (Feb. 12, 2013), available
at https://obamawhitehouse.archives.gov/the-press-office/2013/02/12/presidential-policy-directive-criticalinfrastructure-security-and-resil. The White House, National Climate Resilience Framework (September
2023), available at https://www.whitehouse.gov/wp-content/uploads/2023/09/National-Climate-ResilienceFramework-FINAL.pdf.
23 See Consensus-Based Codes, Specifications and Standards for Public Assistance, FEMA Recovery
Interim Policy FP-104-009-11 Ver. 2.1, at 2 n.2 (Dec. 20, 2019), available at
https://www.fema.gov/sites/default/files/2020-07/fema_DRRA-1235b-public-assistance-codes-standardsinterim-policy.pdf; 87 FR 10805, 10808 (Feb. 25, 2022).
24 See Presidential Policy Directive 8, National Preparedness (Mar. 30, 2011), available at
https://www.dhs.gov/presidential-policy-directive-8-national-preparedness (last accessed June 12, 2024).
25 See Community Resilience Planning Guide for Buildings and Infrastructure Systems, vol. 1, at 9 (May
2016), available at https://nvlpubs.nist.gov/nistpubs/SpecialPublications/NIST.SP.1190v1.pdf; NIST,
Community Resilience, https://www.nist.gov/community-resilience (last accessed June 12, 2024).
26 42 U.S.C. 5172(e)(5)(A).
mitigation and Federal recovery efforts, respectively.27 Consistent with discussion and
feedback received during the National Resilience Guidance engagement process, and to
promote a common understanding of resilience in alignment with that effort, FEMA
proposes to use that definition of “resilience” as the basis for the proposed definitions in
this rule.
Lastly, we propose adding a new definition for “site.” This term is used in several
places in the Public Assistance program regulations, including in the definition of
“project,” but does not currently have its own definition in section 206.201. Consistent
with current FEMA guidance,28 we propose defining “site” as “an individual building,
structure, location, or system section.” This definition would not change current practice
but would provide clarity for FEMA applicants and improve consistency in FEMA’s
regulations.
All other revisions proposed in this section are non-substantive edits to improve
clarity and do not affect the meaning of any defined term. This includes the removal of
the word “eligible” from the definition of “subaward.” The current reference to “eligible
subrecipients” is redundant, since, by definition, subrecipients are applicants who receive
a subaward. We propose removing “eligible” to avoid confusion and improve
consistency in the regulations. We also propose a minor non-substantive edit to the
definition of “subrecipient,” rewording the sentence to use active, instead of passive
voice.
iii. Section 206.202 Application procedures
In paragraph (a), we propose to remove the statement that “under this section the
State is the recipient” because an Indian Tribal government may also be a recipient. We

For more information, see FEMA’s website at https://www.fema.gov/emergency-managers/nationalpreparedness/frameworks/mitigation/mitflg and https://recovery.fema.gov/about (last accessed June 12,
2024).
28 PAPPG at 60.
propose to remove this provision rather than correct it because it is unnecessary. The
term “recipient,” as defined in section 206.201, includes Indian Tribal governments.
Also, in paragraph (a), we propose to remove the reference to 2 CFR part 3002, since that
part now only references 2 CFR part 200, and instead simply refer directly to the
applicable requirements of part 200. That part applies generally to Public Assistance
awards except where inconsistent with the Stafford Act or FEMA’s regulations. The
other revisions proposed in this section are all non-substantive clarifying and stylistic
edits to improve readability.
We propose to add a new paragraph (b)(4) stating that the recipient is responsible
for informing the subrecipient of the status of its application for Public Assistance
funding, including FEMA’s approval of the Project Application and the process for
disbursement of funds. This requirement currently appears in section 206.200(b)(2)(ii).
As explained above for section 206.200, this provision is more appropriately placed in
this section, which lists the recipient’s responsibilities, and we propose non-substantive
changes to the wording of the provision to better capture those responsibilities and the
pending change to information collection 1660-0017, Public Assistance Program. We
also propose to re-order existing paragraphs (b)(1), (3), and (4) and make other nonsubstantive clarifying edits to more accurately describe the recipient’s grant management
activities.
We propose to make a clarifying change to paragraph (c), which currently states
that the recipient must submit a request for assistance within 30 days after designation of
the area where the damage occurred. Consistent with current FEMA guidance,29 we
propose to reword the paragraph to clarify that the recipient must submit the request no
later than 30 calendar days after the area is designated in an emergency or major disaster
declaration. We also propose to remove the references to outdated FEMA Form numbers

PAPPG at 37 (“Unless otherwise noted, FEMA calculates all deadlines based on calendar days”).

in paragraph (c) and throughout this section. Neither of these proposed changes is
substantive.
We propose to reorganize and revise paragraph (d). First, we propose revising the
paragraph heading from “Project Worksheets” to “Project Applications,” consistent with
the pending revision to FEMA’s Public Assistance forms. In paragraph (d)(1), we
propose clarifying that an applicant’s authorized local representative is responsible for
ensuring the applicant has submitted all costs or cost estimates. This is not a substantive
change but would simply make explicit that submissions may include cost estimates as
well as actual costs. For clarity, we also propose removing the words “for funding” from
the end of paragraph (d)(1) because they are unnecessary.
We propose moving the first sentence of existing paragraph (d)(1)(i) to the end of
paragraph (d)(1) and clarifying that the applicant may be assisted by the recipient or by
FEMA in preparing a Project Application for each project. We propose removing the
existing second sentence of (d)(1)(i), since the requirement to identify eligible work
would be included in proposed new paragraphs (d)(2) and (3). We propose moving the
provision in existing paragraph (d)(1)(ii) into a new paragraph (d)(2), with certain
revisions. Existing paragraph (d)(2) would be redesignated as paragraph (d)(4). New
paragraph (d)(2) would provide that within 90 calendar days following FEMA’s approval
of the Request for Public Assistance, the applicant must identify, and report all impacts
the applicant proposes be included on the Project Applications. This would be a change
from the existing deadline, which is 60 days following the first substantive meeting with
FEMA. Basing the deadline on FEMA’s approval of the Request for Public Assistance
avoids potential confusion about what constitutes the first substantive meeting. We

propose increasing the time period from 60 days to 90 days, to ensure applicants do not
have less time to identify and report the impacts.30
We propose to add a new paragraph (d)(3), providing that for work not completed
prior to or during the project development period, the applicant must conduct any site
inspections necessary to validate incident impacts and obtain all information necessary to
complete a detailed description of the impacts. This requirement is currently imposed in
existing paragraph (d)(1)(ii), but the proposed change would improve clarity by better
describing what is required. New paragraph (d)(3) would also require that within 30
calendar days following a site inspection or 120 calendar days following FEMA’s
approval of the Request for Public Assistance, whichever is later, the applicant must also
provide the recipient and FEMA all other documentation necessary to determine eligible
work and costs. These deadlines would ensure that applicants timely submit all required
information and support the efficient administration of the program. Applicants would be
able to request an extension to the deadlines under section 206.202(f)(2), but if they fail
to submit the documentation within the required time, the project would be ineligible, and
the applicant would need to submit an appeal. When obligation and closeout of projects
extends beyond the completion of the work, it delays the recovery process and results in
undue burdens and increased costs for FEMA, recipients, and disaster-impacted
communities. FEMA believes codifying a specific timeframe for submitting information
is necessary to ensure timely completion of Project Worksheets, obligation of funds, and
closure of projects.
Existing paragraph (d)(2) (proposed (d)(4)) provides information on the minimum
threshold for small projects. When the estimated cost of a project is below this threshold,
FEMA will not approve funding for it. Paragraph (d)(2) currently provides that the

Based on an analysis of data from FEMA’s Grants Manager system, it typically takes applicants
approximately 78 days to complete this process. Accordingly, we do not expect this proposed deadline
would impose a new burden on applicants.
minimum threshold amount “shall be adjusted annually to reflect changes in the
Consumer Price Index for All Urban Consumers” (CPI-U). We propose updating the
listed minimum threshold amount from $3,000 to $3,900 which is the current published
amount.31 We also propose to revise this paragraph to provide that the minimum
threshold “will be reviewed annually and may be adjusted . . ..” This is not a substantive
revision, but simply clarifies that an adjustment to the minimum threshold is not strictly
required every year. Sometimes, the change in CPI-U in a single year is so small as to
only result in a de minimis change in the minimum threshold. FEMA interprets section
422 of the Stafford Act not to require the agency expend the time and resources necessary
to issue an adjustment when the impact of that adjustment would be de minimis.
We further propose to revise current paragraph (d)(2) to change the way the
minimum threshold is applied. Under the existing regulations, FEMA will not approve
project applications when the estimated cost of work on the project is under the minimum
threshold. FEMA requires applicants to restrict each project to a conceptual and logical
grouping of eligible work at one or more sites.32 Applicants have some discretion in how
they group sites across projects, however, and some currently try to group together sites
that are, by themselves, de minimis, in order to reach the minimum threshold. When
projects consisting solely of multiple de minimis sites that should not have met the
minimum threshold are processed, it takes up limited administrative resources and causes
delays throughout the program. To remedy this, FEMA proposes to replace “when the
estimated cost of work on a project” with “when the estimated cost of work at a site.”
This would ensure the minimum threshold is applied not to the project as a whole, but to
each site in the project individually, properly excluding project applications under the
threshold.

31
See 88 FR 72512 (Oct. 20, 2023).
See 44 CFR 206.201; PAPPG at 60-63.

We propose revising the heading of paragraph (e) from “grant approval” to
“award notification” to better describe its provisions. We propose to make a number of
clarifying revisions to paragraph (e)(1) to improve clarity and readability. Among them,
we propose to revise the second sentence to replace the phrase “will obligate funds” with
“may obligate funds.” This is not a substantive change, but merely a clarifying edit to
more accurately reflect that, while in most cases the Regional Administrator will obligate
funds after receiving the appropriate forms and approved Project Worksheets, there are
occasionally situations that require a delay. For example, funding may not be available to
obligate at the time the Project Worksheet is approved, FEMA may need to request
additional information from the applicant, or an environmental review may be ongoing
and need to conclude before funds can be obligated. In such situations, obligation is not
automatic upon approval, but FEMA will obligate funds as soon as the relevant issue is
resolved. We further propose to replace the term “Project Worksheet” with “Project
Application,” consistent with the pending revision to FEMA’s Public Assistance forms.
We propose to remove existing paragraph (e)(2), which provides for a 45-day
deadline for FEMA to obligate Federal funds, from the time the applicant submits the
Project Worksheets. In the same way that there may be a delay as discussed above
regarding paragraph (e)(1), circumstances may arise that require a delay before FEMA
may obligate funds; to ensure we have the necessary flexibilities to maintain the smooth
administration of the Public Assistance program, we propose to remove this deadline.
Under this proposed change, FEMA would still maintain regular contact with applicants
regarding the status of their projects and could explain any delays in obligation. We do
not believe that removing the deadline will result in any substantial increase in delays or
otherwise cause novel problems for applicants, but we request comment on the potential
impact of this proposed change.

We propose to add a new paragraph (e)(2) providing that the recipient will notify
the subrecipient of FEMA’s approval of a subaward. As discussed above, this provision
is currently included in section 206.200(b)(2)(i), and we propose moving it to this section
to improve organization and clarity in FEMA’s regulations.
In paragraph (f)(1)(i), we propose to clarify that a host State or Tribe that provides
evacuation and sheltering support is eligible for a grant under sections 403 or 502 of the
Stafford Act when an impacted State or Tribe requests direct Federal assistance for
sheltering. Adding this statutory reference to “State/Tribe” would provide clarity to the
reader and is a not a substantive change.
Overall, the proposed amendments to § 206.201 would streamline and improve
the Project Worksheet process, which is a reform supported by the NAC in its
recommendation.33
iv. Section 206.203 Federal grant assistance
We propose to revise the heading of this section to read “Federal funding for large
and small projects,” which adequately describes the contents of the section, as revised,
and renders paragraph (a) unnecessary, and to remove paragraph (a). We proposed to
redesignate paragraphs (b), (c)(1), (c)(2), and (c)(3) as paragraphs (a), (b), (c), and (d),
respectively. We propose to move the provisions in existing paragraph (d), which
address improved projects and alternate projects, to a new section 206.204, and
accordingly redesignate existing sections 206.204-209 as sections 206.205-210,
respectively.
In new paragraph (b), we propose to replace “State disaster assistance grants”
with “FEMA Public Assistance awards.” In new paragraph (c), we propose stating that
the minimum threshold amount will be “reviewed annually and may be adjusted” to

See NAC Memo, Recommendations on the Stafford Act and Related Federal Regulations: Public
Assistance and Individual Assistance Issues, at 2 (Aug. 19, 2008), available at
https://www.fema.gov/pdf/about/nac/hp/stafford_act_rec_081908.pdf.
reflect changes in CPI-U. This would more accurately reflect the fact that if the change
in CPI-U for a given year is so small as to result in only a de minimis change in the
minimum threshold, FEMA is not required to spend limited administrative resources
issuing an adjustment that year. These revisions are merely clarifications and would not
be a change in current agency practice.
In new paragraph (d), we propose minor edits to reflect the proposed
reorganization of this section, replacing the reference to paragraph (c) with one to
paragraphs (b) and (c), and to replace the term “Project Worksheet” with “Project
Application,” consistent with FEMA’s pending update of its Public Assistance forms.
v. Proposed Section 206.204 Funding options—improved projects and alternate
projects
Existing section 206.203(d) addresses two funding options for projects that are
outside the originally approved scope of work: (1) improved projects, which restore the
predisaster function of a damaged facility but include improvements beyond the
predisaster design, and (2) alternate projects, which are done when the public welfare
would not be best served by restoring a damaged public facility or its function. FEMA
proposes to create a new section 206.204 for these provisions, and to make revisions to
the current regulatory language in existing section 206.203(d).
FEMA proposes to address improved projects, currently in section 206.203(d)(1),
in new paragraph 206.204(a). We propose to add further information regarding project
eligibility, deadlines, and funding for improved projects in new paragraphs (a)(1) through
(4). We propose to replace the words “Federal funding” with the words “Public
Assistance funding” to more accurately reflect the source of the funds. Regarding project
eligibility, we propose to add a sentence indicating that FEMA may only grant improved
projects for permanent work.34 This is not a new requirement, but the revision would

See definition of Permanent Work, 42 CFR 206.201, and discussion supra on proposed revision. See
also PAPPG at 163.
help ensure clarity regarding eligibility for improved projects. Emergency work is meant
to eliminate immediate threats to public safety and improved property, whereas an
improved project is a project that restores the predisaster function of a facility and
incorporates improvements or changes to the predisaster design. For example, an
improved project would be a subrecipient contributing its own funding to add a new
library when rebuilding a school.
The regulations at existing section 206.203(d)(1) require the subrecipient to
obtain the recipient’s approval for improved projects. We propose to clarify in new
section 206.204(a)(2) that the subrecipient must obtain the recipient’s approval in writing
prior to the start of construction. Further, we propose to require that the recipient notify
FEMA in writing of the improved project approval, which is consistent with current
FEMA guidance on improved projects.35 Having recipients notify FEMA of project
approval helps ensure accountability and transparency by increasing communication
between FEMA and recipients and providing consistent documentation.
FEMA also proposes to clarify in new paragraph 206.204(a)(3) that the project
completion deadlines established under existing section 206.204(c) (proposed
206.205(c)) apply to the completion of improved projects and alternate projects. This is
not a new requirement. Current section 206.204(c) establishes deadlines that apply to all
projects approved under State disaster assistance grants. Including this requirement in
the regulatory provisions that specifically address improved projects and alternate
projects is intended to aid readers and FEMA in expediting project and program closure.
Regarding funding, FEMA proposes to clarify in new paragraph 206.204(a)(4)
that Public Assistance funding for improved projects is either the Federal share of the
actual costs of completing the improved project, or the Federal share of the approved
estimate of eligible costs, whichever is less. If, for example, a tornado destroys a school

See PAPPG at 167.

gym and the cost to replace that gym is approved for $2 million, the school could apply
that $2 million toward the construction of a larger gymnasium, rather than replace a
gymnasium of the same size. If it did, and the larger gymnasium cost $5 million to build,
FEMA would still calculate the Federal share from the $2 million approved scope of
work. If, however, the school rebuilt a smaller gym, and the actual cost was only $1
million, FEMA would calculate the Federal share from the school’s actual costs of $1
million. These proposed changes are consistent with current FEMA guidance and would
not substantively affect the amount of Federal share or the eligibility of costs for
improved projects.36
FEMA proposes to move the provisions in existing section 206.203(d)(2), relating
to alternate projects, to new section 206.204(b), and to clarify project eligibility, funding,
and other requirements. In proposed paragraph (b)(4)(i), we propose to use the phrase
“Public Assistance funding,” instead of the phrase “Federal funding” used in existing
206.203(d)(2)(ii), to more accurately reflect the source of the funds. Regarding project
eligibility, the current regulation states that the recipient may propose alternate projects in
any case where a subrecipient determines that restoring a damaged public facility or the
function of that facility would not best serve the public welfare. We propose to add PNP
facilities to this provision. This is not a substantive change. PNP facilities are currently
eligible for alternate project funding under existing section 206.203(d)(2)(iii), but they
were inadvertently left out of the introductory language of existing paragraph (d)(2).
FEMA also proposes to remove the language in existing section 206.203(d)(2)(i) stating
that the “alternate project option may be taken only on permanent restorative work,” and
to instead state in proposed paragraph (b)(1) that “an alternate project may only be
approved for permanent work.” Because the language “permanent restorative work” may
be misunderstood to limit the use of alternate projects funds to restoration work, FEMA

See PAPPG at 164, 166-67.

is proposing this revision to clarify existing eligibility requirements and avoid confusion
regarding the use of alternate project funds.
The current regulation, in section 206.203(d)(2)(v), requires the recipient to
submit a proposal for any alternate project to the Regional Administrator for approval
before the start of construction. In addition to this requirement, we propose to further
specify in new section 206.204(b)(2) that an applicant must receive approval from the
Regional Administrator prior to the start of construction on an alternate project. This
change would incorporate current policy37 into the regulations and is intended to save
applicants from beginning a project and committing their resources before learning that
the project is ineligible for Public Assistance.
The current regulation also states that the recipient shall include a description of
the proposed alternate project(s), a schedule of work, and the projected cost of the
project(s) in the alternate project proposal. FEMA proposes to add that the schedule of
work must include the starting date and targeted completion date because alternate
projects tend to take a much longer time to complete than original or improved projects.
Knowing the starting date and targeted completion date would enable FEMA to keep
track of the project more effectively and aid FEMA in planning for closeout.
Additionally, existing section 206.203(d)(2)(v) further states that the recipient
shall provide the necessary assurances to document compliance with special
requirements, including, but not limited to, floodplain management, necessary
environmental assessments, hazard mitigation, protection of wetlands, and insurance.
FEMA proposes to simplify the regulatory language but slightly expand the scope of the
provision by revising this list to read “any environmental or historic preservation issues,
and any other legal considerations.” We propose including this new language to require
the recipient to identify other legal considerations not currently listed, such as liens on

See PAPPG at 167.

property, ownership issues, and zoning. See proposed 44 CFR 206.204(b)(2). Legal
issues are more likely to arise in alternate projects than in original or improved projects,
so identifying these issues early in the project formulation phase can assist FEMA in
determining whether it should approve the project, or whether these issues will be
prohibitive, thereby saving applicants from beginning a project only to be halted before
completion.
In proposed section 206.204(b)(4), FEMA proposes to provide additional clarity
regarding funding for alternate projects. Under the existing regulations, at 206.203(d)(2),
Public Assistance funding for alternate projects is limited to a certain percentage of the
Federal share of FEMA’s estimate of the cost of repairing, restoring, reconstructing, or
replacing the original facility, and of management expenses. DRRA section 1207(a)
amended section 406(c) of the Stafford Act to remove these percentage limitations, so we
propose to update the regulations to reflect the current statutory provision. We also
propose to clarify that Public Assistance funding for alternate projects is limited to the
Federal share of the actual costs of completing the alternate project or the Federal share
of the approved estimate of the total eligible cost, whichever is less. This last change is
not a substantive change, but simply intended to improve clarity and avoid confusion.
Both changes are consistent with current FEMA guidance on alternate projects.38
Existing section 206.203(d)(2)(iv) states that funds contributed for alternate
projects may be used to repair or expand other selected public facilities, to construct new
facilities, or to fund hazard mitigation measures. We propose to add, in proposed
206.204(b)(4)(ii), both the purchase of equipment and, when required to accomplish the
project, the demolition of the original structure as eligible uses of alternate project funds.

See PAPPG at 164, 167-68.

This change is consistent with current FEMA guidance on this issue,39 and would
improve clarity and consistency in the regulations.
Finally, we propose to add provisions to new paragraphs (b)(4)(ii)(A) and (B)
regarding limitations on the use of funds for alternate projects. Funds awarded for
alternate projects may not be used to pay the non-federal share of any project and may
not be applied to operating expenses. These alternative project funds may not be applied
in a regulatory floodway or for any uninsured public facility or private nonprofit facility
located in a special flood hazard area. We also propose adding in new paragraphs
(b)(4)(ii)(A) and (B) examples of work that alternative project funds may be used for.
These examples are not an exhaustive list of permissible uses.
These limitations conform to the language of section 406(c)(1)(C) and (c)(2)(C)
of the Stafford Act and current FEMA guidance,40 and are proposed for clarity and to
emphasize for readers the importance of these restrictions.
vi. Section 206.204 Project performance (proposed 206.205)
FEMA proposes to redesignate section 206.204 as section 206.205 to reflect the
new section 206.204 discussed above.
In the chart in paragraph (c)(1), we propose replacing “debris clearance” with
“debris removal” and “emergency work” with “emergency protective measures,” to
improve clarity, consistent with the proposed removal of the definition of “emergency
work” in section 206.201, discussed above. We further propose consolidating these two
items onto a single line in the chart. Both have the same 6-month completion deadline,
so combining them simplifies the chart and improves readability. We propose a
conforming edit in paragraph (c)(2)(ii) to refer to “debris removal” and “emergency
protective measures.”

39
See PAPPG at 167.
See PAPPG at 167-68.

Paragraph (c)(2) provides exceptions to the project completion deadlines
established in paragraph (c)(1). Specifically, paragraph (c)(2)(i) states that the recipient
may impose lesser deadlines for the completion of work if considered appropriate.
Although deadlines shorter than those provided in paragraph (c)(1) are not often imposed,
they may be appropriate in some circumstances. Under current practice, FEMA and the
recipient will agree that a lesser timeline is appropriate in a particular case before any
deadline(s) are reduced, and the recipient will inform the subrecipient of the reduced
deadline, and then monitor and enforce the subrecipient’s compliance. FEMA proposes
revising the existing language in paragraph (c)(2)(i), “The recipient may impose . . .”, to
say “FEMA and the recipient may impose . . .” FEMA specifically requests comment on
this proposed change and whether mandating concurrence on reduced deadlines would
improve delivery of the Public Assistance program. Additionally, consistent with current
guidance,41 FEMA proposes clarifying in paragraph (c)(2)(ii) that all extensions of
deadlines for temporary relocation require prior FEMA approval.
Paragraph (d) requires the recipient to submit requests for time extensions beyond
the recipient’s authority to the Regional Administrator. FEMA proposes to clarify that
the recipient must submit the request prior to the expiration of the last approved time
extension, and that the recipient must provide the justification for the delay and projected
completion date in writing. These revisions are consistent with current FEMA guidance
and are not substantive policy changes.42 FEMA also proposes to require that the
recipient base the justification for an extension under this paragraph on extenuating
circumstances beyond the recipient’s and subrecipient’s control. This requirement is
similar to the provision in paragraph (c)(2)(ii) requiring that an extension be based on

41
See PAPPG at 133.
See PAPPG at 196-97.

extenuating circumstances or unusual project requirements beyond the control of the
subrecipient and would better align these closely related provisions.
Also, in paragraph (d)(2), FEMA proposes to clarify that while FEMA will not
provide Federal funding for a project if the work is not completed, FEMA may provide
Federal funding for the completed portion of that project if the completed work is distinct
from uncompleted work.
Existing paragraph (e)(2) describes how a subrecipient requests additional
funding for a cost overrun and FEMA’s procedures for cost overruns for small projects.
We propose to move the provisions relating to small projects to a new paragraph (e)(3) to
more clearly differentiate between the treatment of large and small projects.
We propose to rewrite portions of paragraph (e)(2) to improve readability and to
clarify that subrecipients may, but are not required to, submit requests for additional
funding. These are non-substantive edits and only meant to improve clarity. We also
propose to add a new sentence stating that subrecipients should make the request for
additional funding as soon as practicable to give FEMA and the recipient an opportunity
to inspect the uncompleted project to validate that the additional costs are eligible. The
addition emphasizes the importance of timeliness in alerting the recipient and FEMA of
potentially significant changes in eligible funding to allow time for the recipient or
FEMA to make interim inspections of the projects, if necessary. Submitting requests as
soon as practicable also protects the subrecipient by allowing for approval of
reimbursement for the cost overruns before project closeout. Significant overruns that
are not submitted until closeout of a project may be more difficult to justify, and the
subrecipient may be severely impacted if the overruns are not approved.
The remainder of paragraph (e)(2) addresses cost overruns of small projects. We
propose to include this language in new paragraph (e)(3) with one revision. We propose
to specify that the subrecipient may submit a request for additional funding within 90

calendar days following the completion of the last small project, instead of an appeal in
accordance with existing section 206.206 within 60 days. Consistent with section 423 of
the Stafford Act, 42 U.S.C. 5189a, appeals under existing section 206.206 are for
decisions regarding eligibility, whereas cost overruns for small projects are financial
reconciliation matters that should be handled following procedures related to payment of
claims. This proposed revision would provide a deadline for handling cost overruns for
small projects under these financial accounting procedures, separate from the formal
appeal process under existing section 206.206. Subrecipients would still be able to
submit an appeal if FEMA denies the request for additional funding, but proposed
paragraph (e)(3) would not specifically reference appeals.
FEMA proposes to revise paragraph (f) to remove the statement that progress
reports must describe the status of those projects on which a final payment of the Federal
share has not been made to the recipient and outline any problems or circumstances
expected to result in noncompliance with the approved grant conditions. Since there may
be projects that remain open after payment of the final Federal share has been made to the
recipient, we propose rewording this requirement for clarity. For example, if FEMA has
provided final payment to the recipient, but the recipient has not yet submitted payment
to the subrecipient, the recipient would still be required to provide a progress report.
FEMA proposes to revise paragraph (f) to instead state that progress reports must
describe the status of open large projects. These amendments would align with current
FEMA guidance on progress reports.43
vii. Section 206.205 Payment of claims (proposed 206.206)
Section 206.205(a) (proposed 206.206(a)) addresses small projects and currently
provides that “Final payment of the Federal share of these projects will be made to the

See PAPPG at 193 (“FEMA requires the Recipient to report on the status of all open Large Projects on a
quarterly basis.”).
recipient upon approval of the Project Worksheet.” We propose to replace “Project
Worksheet” with “Project Application,” consistent with the pending revision to FEMA’s
Public Assistance forms, and to remove the word “final” out of recognition that FEMA
may occasionally need to adjust funding after approval of the Project Application – for
example, to account for a net small project overrun or actual insurance proceeds.
Similarly, we propose specifying that recipients must make payment of the Federal share
of small projects to the subrecipient as soon as practicable after Federal approval of
funding “consistent with State or Tribal laws.” This is not a new requirement, and we
only propose including this statement in the regulations to improve clarity. We also
propose several non-substantive style edits to paragraph (a) to improve consistency and
readability.
Paragraph (a) addresses small projects and currently requires the recipient to
certify that all small projects were completed in accordance with FEMA approvals and
that the contribution to the non-Federal share has been made to each subrecipient, if
applicable. We propose revising paragraph (a) to add that the recipient must make this
certification within 90 calendar days of the last approved small project completion date of
record. This 90-day deadline is consistent with current Public Assistance program
guidance on small projects,44 and would provide recipients with a clear requirement for
maintaining an efficient and timely administrative process. Currently, closeout
sometimes extends significantly beyond the completion of the work, causing long
administrative delays. FEMA believes imposing this deadline would allow recipients
sufficient time to make the required certification, while also helping prevent undue delays
and reducing burden on FEMA, but we request comment on the potential impact of this
proposed change.

See PAPPG at 199-200.

Paragraph (b) addresses large projects. Paragraph (b)(1) currently requires the
recipient to submit an accounting to FEMA of each large project as soon as practicable
after the subrecipient has completed the approved work and requested payment. We
propose revising paragraph (b)(1) to require more specifically that the subrecipient
submit a cost documentation for each large project to the recipient for final payment
within 90 days of completion of the approved scope of work for that Project Application,
and that the recipient submit the accounting for each large project to the Regional
Administrator as soon as practicable, but not to exceed 90 calendar days after the
subrecipient has submitted documentation for final payment. We also propose adding a
new paragraph (b)(4) providing that the Regional Administrator could approve extensions
when requested in writing by the recipient. Consistent with other requests for extensions,
the recipient would be required to make these requests in advance of the initial deadline.
As with the deadline proposed in paragraph (a), FEMA believes these time constraints
would reasonably balance the practical need to allow recipients and subrecipients
sufficient time to submit the required documentation with FEMA’s interest in the
efficient administration of the Public Assistance program. These deadlines would avoid
lengthy delays by reducing the time it takes to close out projects. They would also
require the recipient to make an accounting before documentation is irretrievable, which
would improve accountability and transparency in program administration. The proposed
90-day timeframe is consistent with current Public Assistance program guidance.45 We
request comment on the potential impact of this proposed change.
The last sentence of paragraph (b)(2) currently states that if the Regional
Administrator determines that eligible costs exceed the initial approval, he/she will
obligate additional funds as necessary. We propose to revise this sentence to state that if
the Regional Administrator determines that eligible costs vary from the approved

See PAPPG at 200.

estimate, then he/she will adjust the funding (increase or decrease) to reflect the eligible
actual costs, as necessary. This revision clarifies that the Regional Administrator does
not just determine whether costs exceed the initial approval, which would require the
obligation of additional funds. Rather, the Regional Administrator looks for any
discrepancies between the approved and actual costs and will adjust funding as necessary,
based on whether costs are more or less than the initial approval.
As explained above in reference to section 206.200, we propose to move the
requirement in 206.200(b)(2)(ii), relating to the prompt payment of the Federal share to
the subrecipient, into proposed 206.206. Specifically, we propose adding a new
paragraph (b)(3) requiring that the recipient make payment of the Federal share to the
subrecipient as soon as practicable after the Federal obligation of funding, consistent with
State or Tribal laws. This is a non-substantive change that would simply reorganize and
clarify an existing requirement and is consistent with the changes proposed in 206.205(a)
(proposed 206.206(a)) discussed above.
viii. Section 206.206 Appeals (proposed 206.207)
FEMA proposes no substantive changes to this section. The proposed rule would
redesignate the section as 206.207, to account for proposed new section 206.204, and
would revise the cross references to the definitions in section 206.201 to reflect the
proposed removal of the paragraph designations there.
ix. Section 206.207 Administrative and audit requirements (proposed 206.208)
In section 206.207(a) (proposed 206.208(a)), we propose to remove the reference
to 2 CFR part 3002, since that part now only references 2 CFR part 200, and instead
simply refer directly to the applicable requirements of part 200. That part applies
generally to Public Assistance awards except where inconsistent with the Stafford Act or
FEMA’s regulations. We propose similar revisions in paragraphs (b)(1)(iii) (G) -(H) and

(c)(1)-(2) to remove references to part 3002 and provide more specific citations to the
audit requirements of part 200.
Section 324 of the Stafford Act authorizes FEMA to provide funding for
management costs incurred in the administration of the Hazard Mitigation Grant Program
and the Public Assistance program. Section 324 was implemented in FEMA’s
regulations at 44 CFR part 207. Existing section 206.207(b)(1)(iii)(K) references these
provisions, requiring State administrative plans to include procedures for determining the
reasonable percentage or amount of pass-through funds for management costs provided
under part 207. Section 1215 of DRRA amended section 324 of the Stafford Act to
require FEMA provide funding for management costs at specific percentage rates for
recipients and subrecipients. FEMA has implemented the DRRA section 1215
amendments via policy,46 but new regulations have yet to be issued. Since recipients are
no longer required to determine reasonable pass-through amounts, we propose removing
the existing provision in paragraph (b)(1)(iii)(K) as it is no longer relevant to
administrative plans.
We propose to revise paragraph (b)(1)(iii)(K) to require State/Tribal
administrative plans to include procedures for ensuring timely closeout of subawards,
subrecipients, and awards. Existing section 206.207 does not explicitly require
administrative plans to include procedures for timely closeout, but recipients are subject
to the closeout requirements outlined in 2 CFR 200.344 and should already have such
procedures in place. Timely closeout is consistently an issue when administering the
Public Assistance program, and this proposed revision is intended to assist FEMA in
expediting project and program closure.

See Hazard Mitigation Grant Program Management Costs (Interim), FP 104-11-1 (Nov. 14, 2018),
available at https://www.fema.gov/sites/default/files/2020-07/fema_DRRA-1215-hazard-mitigation-grantprogram-management-costs-interim-policy.pdf; Public Assistance Management Costs (Interim), FP 10411-2 (Nov. 14, 2018), available at https://www.fema.gov/sites/default/files/202007/pa_management_costs_interim_policy.pdf.
Paragraph (b)(3) addresses submission and amendment of administrative plans.
We propose to delete the first sentence of this paragraph, which refers to the 1989
deadline for submission of the first plan. Every State has submitted a first plan, so this
language is now obsolete. We also propose revising the rest of existing paragraph (b)(3)
to improve clarity, including to clarify that an administrative plan is required regardless
of whether there is an emergency declaration or a major disaster declaration. This is a
non-substantive change.
We propose one other change to paragraph (b)(3), relating to recipient staffing
plans. Paragraph (b)(1)(ii) already requires recipients to prepare a staffing plan for
administering the Public Assistance program as part of the State/Tribal administrative
plan. We now propose to add a requirement that when a recipient prepares amendments
to its State/Tribal administrative plan after a disaster, the amendments include a disasterspecific staffing plan. A staffing plan identifies all Public Assistance staffing functions,
sources of staff to fill these functions, and the management and oversight responsibilities
of each position. The staffing plan should identify the number of positions needed by
each function for various size disasters and include procedures for determining staffing
and budgeting requirements necessary for program management. Disaster-specific
staffing plans should address changes in staffing requirements during a particular
disaster, for example, when a joint field office is closed, and fewer staff are needed to
administer the program. Each recipient would, therefore, have an overarching plan in
place before disasters hit and would be able to refine any such plan to address the specific
needs of a disaster once it occurs and throughout the response and recovery effort.
Including a revised staffing plan when preparing amendments to the State/Tribal
administrative plan would provide the opportunity to discuss and resolve any
disagreements. This is particularly helpful if mutual aid for program management,
through the Emergency Management Assistance Compact, is a possibility. FEMA’s

administrative plan template already includes a comprehensive staffing plan, and that
information is expected to be amended for each Federally declared emergency or major
disaster declaration. These proposed changes are intended to improve administrative
plans, which was a goal supported by the NAC in its recommendation.47
x. Section 206.208 Direct Federal assistance (proposed 206.209)
Section 206.208 (proposed 206.209) lays out FEMA’s regulations relating to
direct Federal assistance (DFA), which may be requested when a State or Tribal
government lacks the capability to perform or to contract for eligible emergency
protective measures or debris removal.
We propose to revise the first sentence in paragraph (a) of this section to remove
the reference to local governments. Requests for DFA are made at the State or Tribal
government level, so we propose this change to avoid confusion. We also propose to
replace “emergency work and/or debris removal” with “emergency protective measures
or debris removal.” FEMA splits emergency work into two categories: debris removal
and emergency protective measures. Current paragraph (a) is potentially confusing, as it
refers to the both the broader term “emergency work” and the more specific term “debris
removal.” We propose this non-substantive revision to more accurately reflect the way
FEMA categorizes emergency work.
Additionally, we propose expanding the statutory references in paragraph (a) to
include Stafford Act sections 402, 418, 419, 502(a)(4) and (6), and 503. Section 402
covers general Federal assistance that FEMA may provide in a major disaster. Paragraph
(a) currently references 402(1) and (4), but the proposed revision would expand the
reference to section 402 as a whole. Sections 418 and 419 authorize the President to
establish temporary communications systems and temporary public transportation. DFA

See NAC Memo, Recommendations on the Stafford Act and Related Federal Regulations: Public
Assistance and Individual Assistance Issues, at 2 (Aug. 19, 2008), available at
https://www.fema.gov/pdf/about/nac/hp/stafford_act_rec_081908.pdf.
is the only way to provide funds under sections 418 and 419 of the Stafford Act, so
adding these two provisions clarifies the potential Federal role. Section 502 authorizes
the President to direct any Federal agency to provide emergency assistance. Current
paragraph (a) references 502(a)(1), (5), and (7), but the proposed revision would expand
that to include 502(a)(4) and (6), which concern emergency assistance through Federal
agencies and assistance under Stafford Act section 408. Section 503 addresses the
amount of assistance the President may provide for emergency assistance. These
additions are a non-substantive change that would improve clarity for the reader and do
not reflect a change in statutory authority.
We propose a few clarifying revisions to paragraph (b)(2). First, we propose
replacing the words “statement as to the reasons” with “certification and explanation
from” in order to more accurately reflect the form of a recipient’s submission that it
cannot perform or contract for performance of the requested work. Second, we propose
to specify that this certification and explanation must come from the State or Indian
Tribal government. Finally, we propose including Indian Tribal governments as one of
the entities that must not be able to perform or contract for performance of the requested
work. These are only revisions for clarity and would not represent substantive changes in
policy.
We propose revising paragraph (c)(1) to replace the first instance of “Regional
Administrator” with “FEMA.” This revision would clarify that some requests for DFA
may be approved by FEMA headquarters instead of by a Regional Administrator. We
also propose clarifying that when FEMA (whether a Regional Administrator or
headquarters) approves a request for DFA, FEMA may perform or contract for the work
itself or will, as appropriate, issue a mission assignment to another Federal agency. This
is not a substantive change in policy; because the current regulatory language does not
make explicit that FEMA may handle the DFA work itself, we are proposing such an

addition for clarity. Paragraph (c)(1) also incorrectly indicates that FEMA issues the
mission assignment via a letter to the Federal agency performing the mission assignment.
FEMA issues a mission assignment using various OMB-approved forms, not via a letter.
Therefore, we propose to remove the reference to a mission assignment “letter.”
Although an actual letter is not used, the substance of the mission assignment remains the
same. This is not a substantive change.
In paragraph (c)(2), we propose non-substantive edits to improve clarity,
including the addition of the words “more specific” before “statutory authority of another
Federal agency.” The relevant restriction derives from appropriations law that prohibits
augmentation of a Federal agency’s purpose, i.e., expanding into another Federal
agency’s jurisdiction or area of authority. FEMA characterizes this issue as “duplication
of programs.” The proposed edit here is to improve clarity and is non-substantive.
In paragraph (d), we propose to clarify that the time limit for completion of work
by a Federal agency under a mission assignment is 60 calendar days after the President’s
declaration. The time limit has always been calculated using calendar days, but we
propose making that explicit to improve clarity.
In paragraph (e), we propose only minor non-substantive edits.
xi. Section 206.209 Arbitration for Public Assistance determinations related to
Hurricanes Katrina and Rita Hurricanes Katrina and Rita (Major disaster
determinations DR-1603, DR-1604, DR-1605, DR-1606, and DR-1607) (proposed
206.210)
FEMA proposes no substantive changes to this section. The proposed rule would
redesignate the section as 206.210, update cross-references to other sections in part 206
consistent with the other changes proposed in this rule and replace the term “Project
Worksheet” with “Project Application,” consistent with FEMA’s pending update of its
Public Assistance forms.
D. 44 CFR part 206, subpart H—Public Assistance Eligibility

i. Section 206.220 General
FEMA proposes only non-substantive stylistic edits to this section to improve
clarity.
ii. Section 206.221 Definitions
In section 206.221, FEMA proposes to remove the top-level paragraph
designations in the section and reorder the definitions alphabetically.
FEMA proposes to add new definitions for the terms “assistance animal,”
“household pet,” and “service animal.” These proposed definitions are currently used in
FEMA’s Public Assistance guidance.48 Their addition to section 206.221 is not intended
to change their meaning, but simply to improve clarity and consistency in the regulations.
FEMA proposes to define “assistance animal” as an animal that works, provides
assistance, or performs tasks for the benefit of a person with a disability, or provides
emotional support that alleviates identified symptoms or effects of a person’s disability.
Although dogs are the most common type of assistance animal, other animals can also be
assistance animals. This definition is based on the definition found in U.S. Department
of Housing and Urban Development (HUD) guidance.49
FEMA proposes to define “household pet” as a domesticated animal that is
traditionally kept in the home for personal rather than for commercial purposes, can
travel in commercial carriers, and be housed in temporary facilities. Household pets do
not include reptiles (except turtles), amphibians, fish, insects/arachnids, farm animals
(including horses), and animals kept for racing purposes. This definition is based on
HUD’s definition of household pets found in 24 CFR 5.306 and is consistent with
FEMA’s current guidance.50

See PAPPG at 119.
See HUD, Office of Fair Housing and Equal Opportunity, Notice FHEO-2020-01 (Jan. 28, 2020),
available at https://www.hud.gov/sites/dfiles/PA/documents/HUDAsstAnimalNC1-28-2020.pdf.
50 See PAPPG at 119.
48
FEMA proposes to define “service animal” as any dog that is individually trained
to do work or perform tasks for the benefit of an individual with a disability, including a
physical, sensory, psychiatric, intellectual, or other mental disability. Other species of
animals, whether wild or domestic, trained or untrained, are not service animals for the
purposes of this definition. The work or tasks performed by a service animal must be
directly related to the individual’s disability. Our proposed definition of “service animal”
is based on the Americans with Disabilities Act (ADA), 42 U.S.C. 12101 et seq., and the
U.S. Department of Justice’s implementing regulations at 28 CFR 36.104.
FEMA proposes to update the definition of “educational institution” by adding
references to Title 20 of the U.S. Code. The references to the terms “elementary school,”
“secondary school,” and “institution of higher education” have not been updated since
FEMA promulgated 44 CFR 206.221 in 1990.51 FEMA proposes to update the
references to these terms to reflect where they are defined in current law. The
Elementary and Secondary Education Act of 1965, as amended by the Every Student
Succeeds Act, Pub. L. 114-95, defines the terms “elementary school” and “secondary
school.” The Higher Education Act of 1965, as amended, defines the term “institution of
higher education.” All three definitions are codified in Title 20 of the U.S. Code
(currently found at 20 U.S.C. 7801(19), 7801(45), and 1001(a), respectively).
We also propose to clarify several definitions in this section. First, we propose to
revise the definition of “immediate threat., which is currently defined as the threat of
additional damage or destruction from an event that can reasonably be expected to occur
within five years. The term “immediate threat” is used in the criteria that must be met for
debris removal and emergency protective measures to be eligible for assistance. Some
threats caused by a declared incident are threats in the context of some future incident,
such as erosion to a beach creating the threat of damage to improved property in the event

See 55 FR 2307 (Jan. 23, 1990).

of flooding from a 5-year storm.52 Other threats are more direct, such as broken tree
limbs or branches that are overhanging improved property or public-use areas and
creating the threat of injury or damage to improved property if they fall.53 We propose
revising this definition to better describe these two types of threats. We propose moving
the existing definition to a new paragraph and revising it to clarify that the five-year
period is from the date of the declared disaster and that, for flood incidents specifically,
an immediate threat is a threat from a five-year flood (a flood that has a 20 percent
chance of occurring in any given year). We also propose replacing the phrase “the threat
of additional damage or destruction” in the existing definition with the phrase “the threat
to lives or public health and safety, or of damage.” This change would clarify that the
definition encompasses the full range of risks not just to improved property, but also to
individuals and public health and safety that are at issue in debris removal and emergency
protective measures determinations. We propose removing the word “destruction”
because it is redundant with “damage,” and we propose removing the word “additional”
to reflect that immediate threats may exist prior to any initial damage or destruction
having occurred. In other words, reasonable expenses incurred in anticipation of and
immediately preceding a declared incident may also be eligible. We propose adding a
new paragraph covering the more direct type of immediate threats mentioned above.
This new paragraph would provide that immediate threat includes an imminent danger
requiring an urgent response to address serious risks to lives or public health and safety,
or to avoid damage from an incident. These proposed revisions are consistent with
FEMA’s guidance on this issue54 and are only intended to clarify the regulations. We do
not seek to make substantive changes to how we assess immediate threats for the
purposes of debris removal or emergency protective measures. We specifically request

See PAPPG at 104.
See PAPPG at 102.
54 See PAPPG at 97-139.
52
public comment on the proposed revisions to this definition and whether the new
definition would accurately capture how the term is used in the Public Assistance
program.
“Improved property” is currently defined as a structure, facility, or item of
equipment which was built, constructed, or manufactured. The term “facility” is
currently defined in section 206.201 as “any publicly or privately owned building, works,
system, or equipment, built or manufactured, or an improved and maintained natural
feature.” As discussed above, we propose to revise that definition by replacing the word
“works” with “structure,” because the latter term is more commonly used in FEMA’s
regulations and guidance. Accordingly, we propose to remove the word “structure” from
the definition of “improved property” in section 206.221 as it would be redundant.
Additionally, although the current definition of “improved property” encompasses
facilities, and “facility” is defined in section 206.201 as including improved and
maintained natural features, there has been confusion as to whether improved and
maintained natural features are improved property. To address this confusion and make
clear that improved property does include improved and maintained natural features,
FEMA proposes to revise the definition of “improved property” to explicitly include
improved and maintained natural features. The current definition also states that land
used for agricultural purposes is not improved property. For clarity, we propose to add
crops and livestock as examples of agricultural purposes.
In the definition of “private nonprofit facility” (existing paragraph (e)), the
introductory text lists the types of eligible private nonprofit (PNP) facilities, and the
succeeding paragraphs provide more detailed definitions for each type. We propose
revisions to update the introductory text to reflect current statutory language in section
102(11)(A) of the Stafford Act, which provides a definition of PNP facility. First, both
section 102(11)(A) and the paragraph defining “utility” (existing (e)(3)) include an item

for irrigation facilities, but they were inadvertently omitted from the list in the
introductory text to the regulatory definition. We propose to correct this oversight and
add irrigation facilities to this list. This is a technical, non-substantive change.
Second, we propose to add “rehabilitational” to the introductory text and add a
new paragraph defining “rehabilitational facility.” This term has been in section 102
since 1988,55 but was inadvertently omitted from the introductory text and paragraphs
here. We propose to define “rehabilitational facility” as a facility that provides alcohol
and drug treatment and other rehabilitational services. FEMA intends for this definition
to clarify the distinction between this term and the separate term “rehabilitation facility,”
which is used in the paragraph definitions of “medical facility” and “essential social
service facility.” While the latter term refers to more traditionally medical-focused
treatment of injury or disease, a “rehabilitational facility” as proposed to be defined offers
treatment of substance use disorders and related services. This proposed definition would
not represent a substantive policy change or alter FEMA’s implementation of section
102(11)(A) of the Stafford Act. FEMA is proposing it to ensure consistency between the
statute and regulations and improve clarity for the public.
Third, we propose to add “center-based childcare” to the proposed introductory
text and add a new paragraph defining “center-based childcare.” Section 1238(b) of
DRRA amended section 102(11)(A) of the Stafford Act to add “center-based childcare”
to the definition of “private nonprofit facility.” Our proposed additions in the definition
would implement this statutory change. In the proposed paragraph, we would define
“center-based childcare” as a private nonprofit facility that the State or Tribal Department
of Children and Family Services, Department of Human Services, or similar agency,
recognizes as a licensed childcare facility. This definition is consistent with FEMA’s

See Pub. L. 100-707, 102 Stat. 4689, 4690.

current guidance on childcare facilities,56 and does not represent a substantive policy
change.
Fourth, we propose to revise the introductory text to the definition to reflect
changes in the Bipartisan Budget Act of 2018. Section 20604(a) of the Bipartisan Budget
Act of 2018 amended section 102(11)(A) of the Stafford Act to provide that the definition
of PNP facilities includes educational facilities without regard to the religious character
of the facility and amended section 102(11)(B) to replace the term “essential services of a
governmental nature” with the term “essential social services.” To incorporate these
amendments in FEMA’s regulations, we propose revising the introductory text to the
definition to replace “educational” with “educational (without regard to the religious
character of the facility)” and to replace “essential governmental type services” with
“essential social services.” FEMA proposes the change from “essential governmental
type services” to “essential social services” to conform FEMA’s regulations with the
current statutory text. This change would not represent a substantive change in policy.57
The fifth revision we propose within the introductory text to the definition of
“private nonprofit facility” is to remove the term “aged and disabled” and replace it with
“older adults and persons living with disabilities.” Terminology has changed since the
original drafting of § 206.221 and FEMA proposes this change to align with more
updated terminology. This change would not represent a substantive change in policy.
The last revision we propose to the introductory text to the definition of “private
nonprofit facility” is to remove the words “and such facilities on Indian reservations” and
“Further definition is as follows” from the end. The reference to facilities on Indian
reservations has no practical impact on facility eligibility and causes confusion. Section
102(11)(A) of the Stafford Act, 42 U.S.C. 5122(11)(A), includes in the definition of

56
See PAPPG at 48.
42 U.S.C. 5122(11)(B).

“private nonprofit facility” a category for facilities on reservations, to be defined in
regulation. However, neither the existing nor proposed regulations include a definition
for facilities on reservations. As such, only the specific facility types named in the
definition (existing paragraph (e)) are eligible, and they are eligible regardless of whether
they are located on a reservation. We propose removing the reference to facilities on
Indian reservations to avoid confusion. This revision would not change which facilities
are eligible. Similarly, the mention of “further definition” in the last sentence is
unnecessary, and we propose to remove it to simplify the paragraph and improve clarity.
The paragraph defining “educational facilities” to the definition of “private
nonprofit facility” (existing (e)(1)), currently states that they are classrooms plus related
supplies, equipment, machinery, and utilities of an educational institution necessary or
appropriate for instructional, administrative, and support purposes. We propose to
explicitly limit this definition to PNP facilities, for the sake of clarity, and to explicitly
include in the definition “related buildings.” FEMA has found that many educational
facilities have buildings that may contain support functions in addition to classrooms, for
example, dormitories. These buildings may be essential to the provision of the school’s
educational services, but the current regulation is not clear as to their eligibility. We
propose to clarify that related buildings are indeed eligible, consistent with current
FEMA practice and guidance.58 This proposed revision is not substantive. Also, in this
paragraph, we propose to remove the word “machinery” as it is already encompassed by
the word “equipment,” which immediately precedes it. This is a non-substantive change
intended to simplify the provision and prevent confusion. Further, we propose to remove
from this paragraph the exclusion of buildings, structures, and related items used
primarily for religious purposes or instruction. Consistent with the proposed revisions to
the introductory text in the proposed definition, this proposed change would reflect the

See PAPPG at 45.

amendments to the Stafford Act in section 20604(a) of the Bipartisan Budget Act of
2018, which specifically provided that an educational facility could qualify as a PNP
facility regardless of its religious character.
In the proposed edits to the paragraph defining “utility” (existing (e)(2)), we
propose to explicitly limit the application of the definition to PNP facilities, for the sake
of clarity, and to further clarify that PNP irrigation facilities are not considered “utilities”
under this paragraph. This is to avoid any possible confusion that such facilities are also
considered utilities. Instead, a proposed paragraph (existing (e)(3)) would separately
define PNP irrigation facilities.
In the proposed paragraph defining “medical facility” (existing (e)(5)), we
propose to make a technical correction to the citation. The current citation, 42 U.S.C.
2910, should be 42 U.S.C. 291o.
In the proposed paragraph defining “essential social service facility” (existing
(e)(7)), we propose a number of revisions. First, we propose to revise the defined term
“other essential governmental service facility” to “essential social service facility.”
Section 20604(a) of the Bipartisan Budget Act of 2018 amended section 102(11)(B) of
the Stafford Act to redefine this term, and this revision would update FEMA’s regulations
to reflect that. Section 20604(a) also added “houses of worship” to the list of eligible
PNP facilities, and we accordingly propose to add “house of worship” to the list of
eligible PNP facilities in the proposed paragraph. Second, we propose adding the words
“a private nonprofit facility” to explicitly limit this definition to PNP facilities, for the
sake of clarity. Third, we propose adding performing arts facilities and community arts
centers as eligible PNP facilities. Section 688 of PKEMRA amended section 102 of the
Stafford Act to add performing arts facilities and community arts centers as eligible PNP
facilities, and this revision would update FEMA’s regulations to reflect that. Fourth, we
propose adding food banks as eligible PNP facilities. Section 1214 of the DRRA

amended section 102 of the Stafford Act to include food banks as eligible PNP facilities,
and this revision would update FEMA’s regulations to reflect that. Fifth, we propose
adding broadcasting facilities as eligible PNP facilities. Section 2(a) of the Emergency
Information Improvement Act of 2015 amended section 102 of the Stafford Act to
include broadcasting facilities as eligible PNP facilities and this revision would update
FEMA’s regulations to reflect that. The proposed revisions would reflect the current
statutory language, which provides that these categories of PNPs are eligible to receive
PA funding, and are consistent with current FEMA guidance.59 Under this proposed rule,
the paragraph would list the following facility types: museums, zoos, performing arts
facilities, community arts centers, community centers, libraries, homeless shelters, senior
citizen centers, rehabilitation facilities, shelter workshops, food banks, broadcasting
facilities, houses of worship, and facilities that provide health and safety services of a
governmental nature.60
We further propose revising the last sentence of the paragraph defining “essential
social service facility” to replace “All such facilities must be open to the general public”
with “such a facility must provide essential social services to the general public.” This
revision would better align FEMA’s regulations with the language of the Stafford Act, as
amended by section 20604(a) of the Bipartisan Budget Act of 2018 and improve clarity.
Section 102(11)(B) of the Stafford Act requires that facilities provide essential social
services to the general public in order to qualify as eligible PNP facilities under the
statute, and also provides that houses of worship may not be excluded from the definition
of PNP facility on the grounds that leadership or membership in the organization
operating the house of worship is limited to persons who share a religious faith or

See PAPPG at 43, 46.
“Shelter workshop” and “senior citizen centers” are the terms used in section 102 of the Stafford Act, 42
U.S.C. 5122(11)(B), but other facilities providing services for individuals with disabilities and/or older
adults may qualify for assistance if they meet the standards for one of the other facility types. See PAPPG
at 43-47.
59
practice. As currently written, one could interpret the last sentence to require that PNPs
allow members of the public open access to their facilities or not restrict leadership or
membership, instead of simply providing services to the public. The proposed revision to
this sentence would avoid that potential confusion and ensure that it is interpreted
consistently with the statutory requirements.
Next, FEMA proposes to revise the definition of “private nonprofit organization.”
In proposed paragraph (1) in the definition (existing (f)(1)), FEMA proposes to update
the outdated reference to the Internal Revenue Code of 1954. The current authority is the
Internal Revenue Code of 1986, as amended. This revision is also proposed in section
206.2 under the definition of “private nonprofit organization.” In proposed paragraph (2)
(existing (f)(2)), FEMA proposes to remove the words “nonrevenue producing” and add a
reference to Tribal law to make the definition consistent with section 206.2(a)(19)(ii).
The definitions should be uniform, and FEMA currently applies the definition as it
appears in section 206.2.61 Lastly, we propose to add new paragraph (3) to allow private
nonprofit organizations that are exempt from the requirements to apply for Internal
Revenue Code section 501(c)(3) status or applicable State or Tribal tax exempt status to
establish their status through (1) articles of association, bylaws, or other organizing
documents indicating that it is an organized entity and (2) a certification that it is
compliant with section 501(c)(3) of the Internal Revenue Code and State or Tribal law
requirements. Consistent with the addition proposed in section 206.2(a)(19)(iii),
discussed above, this proposed addition is meant to ease the burden for certain private
nonprofit organizations that are not able to establish their nonprofit status under proposed
paragraphs (1) or (2).

FEMA proposes maintaining this definition in both sections to improve readability. Section 206.221
includes several provisions regarding PNPs and including the definition there would help avoid confusion
and the need to cross-reference section 206.2.
Finally, eligibility for Public Assistance is dependent on the existence of an
eligible facility, but the agency recognizes that care for vulnerable populations such as
those for older adults and persons with disabilities, has evolved since the original drafting
of FEMA’s regulations. FEMA seeks comment on whether its definition of “private
nonprofit facility” is sufficiently broad to encompass all private nonprofit organizations
providing service to older adults and persons with disabilities that are eligible to receive
public assistance under the Stafford Act. Stakeholders should identify gaps that might be
addressed if FEMA offered further amendment to the definition of “private nonprofit
facility” in the final rule.

iii. Section 206.222 Applicant eligibility
Section 206.222 lists the entities that are eligible to apply for Public Assistance
through the recipient. We propose to revise paragraph (c) to replace “Indian tribes” with
“Indian Tribal governments,” for consistency with the definition at 44 CFR 206.201 and
the Stafford Act. Neither this nor the other changes proposed in this section are
substantive.
iv. Section 206.223 General work eligibility
Section 206.223 describes general work eligibility. Paragraph (a) lists general
eligibility requirements for an item of work. We propose to revise paragraph (a)(2) to
clarify that emergency operation center activities are eligible even if they are located
outside of the designated area. It is FEMA’s practice to allow for emergency operations
center activity62 under paragraph (a)(2), and the change would simply update the
regulatory text for clarity and consistency.
Paragraph (b) specifically addresses PNP facilities. For work on PNP facilities to
be eligible for financial assistance, an organization meeting the definition of a “private
See PAPPG at 52.

nonprofit organization” in section 206.221 must own or operate the PNP facility. FEMA
proposes to rewrite paragraph (b) to improve clarity for the reader. Additionally, these
edits would correct the language that says facilities must be owned “and” operated to read
owned “or” operated, in conformance with 44 CFR 206.222(b) and FEMA’s application
of the requirement.
FEMA proposes to consolidate paragraphs (c) and (d) into a revised paragraph (c)
titled “Rural community, unincorporated town or village, or other public entity
facilities.” Section 102(8)(C) of the Stafford Act provides that the term “local
government” includes “a rural community, unincorporated town or village, or other
public entity, for which an application for assistance is made by a State or political
subdivision of a State.” Section 206.223(c) properly reflects that facilities owned or
operated by public entities are eligible for financial assistance, but paragraph (d) only
discusses facilities serving a rural community or unincorporated town or village that are
owned by a PNP. While it is correct that work performed on PNP facilities may be
eligible, this is already addressed by paragraph (b) and confuses what are separate issues.
Facilities serving a rural community or unincorporated town or village are also eligible if
they are the legal responsibility of the rural community or unincorporated town or village
itself. To improve clarity, we propose revising paragraph (c) to cover rural communities,
unincorporated towns or villages, and other public entities together, consistent with the
statutory language.
Per the above changes, existing paragraph (e) would be redesignated paragraph
(d), and FEMA further proposes to add a new paragraph (e) addressing duplication of
benefits. This new paragraph would describe the recipient’s and subrecipient’s
obligations to notify FEMA of available benefits and to pursue recovery of available
benefits, and would reiterate that FEMA will disallow or recoup duplicate benefits. We
propose adding this new paragraph (e) to improve usability for readers and emphasize

these requirements in the relevant section of the regulations. Nothing in proposed
paragraph (e) is a new requirement. The provision is based on section 312(c) of the
Stafford Act, which requires FEMA to recover other assistance that is available. For
example, if a recipient or subrecipient did not receive insurance proceeds because they
did not present the claims or assert the legal rights, FEMA would deduct the value of
those unasserted rights to insurance proceeds from the Public Assistance grant amount.
v. Section 206.224 Debris removal
In paragraphs (a) and (b), we propose to make non-substantive stylistic edits to
make the provisions easier to understand. The proposed edits would not change the
meaning of these paragraphs.
We also propose to revise paragraph (a)(4) to provide that the Regional
Administrator must approve extensions of the two-year deadline to complete debris
removal under the terms of that paragraph, instead of the Assistant Administrator for the
Disaster Assistance Directorate (now the Recovery Directorate). FEMA believes the
Regional Administrator is best positioned to determine whether an extension is
appropriate, and that approval at the Assistant Administrator level is not necessary in this
situation. The delay and administrative burden of a lengthier review process, which is
required for approval by the Assistant Director, outweigh any marginal benefit it may
have.
vi. Section 206.225 Emergency work
FEMA proposes to revise the heading of this section from “Emergency work” to
“Emergency protective measures.” FEMA splits emergency work into two categories:
debris removal and emergency protective measures. Currently, the heading of sections
206.224 and 206.225 are confusing as both concern emergency work, but only section
206.225 is entitled “emergency work.” We propose to revise the heading of this section
to more accurately reflect the way FEMA categorizes emergency work. Similarly, in

paragraph (a)(2), we propose to replace “emergency work” with “emergency protective
measures.” These are non-substantive changes intended to improve clarity.
Also, in paragraph (a)(2), we propose replacing “cope with” with “eliminate,
lessen, or avert,” and in paragraph (a)(3) we propose adding “avert” to “eliminate” and
“lessen.” “Avert” is used in the current definition of “emergency work” in 206.201, as
well as in section 502 of the Stafford Act. These proposed changes in paragraph (a) are
non-substantive and would simply ensure clear, consistent language throughout part 206.
In paragraph (a)(3)(ii), we propose to remove the word “additional.” Emergency
protective measures authorized under section 403 or 502 of the Stafford Act include work
that eliminates, lessens, or averts immediate threats of significant damage to improved
public or private facilities. The Stafford Act does not limit emergency protective
measures to “additional” damage to improved facilities. That is, FEMA does not
currently limit emergency work to “additional” damage, and FEMA reimburses
emergency protective measures that protect a facility prior to damage. For example,
emergency protective measures such as sandbagging, bracing/shoring structures, and
construction of temporary levees are eligible for reimbursement. Removal of the word
“additional” is a non-substantive change.
FEMA proposes to revise paragraphs (c) and (d) to clarify that pursuant to these
provisions FEMA provides emergency communications and emergency public
transportation in the form of direct Federal assistance. In paragraph (c), this new
language would replace the existing statement about establishing and making emergency
communications available to State and local government officials. Although this current
language is a reasonably accurate description of the DFA process, FEMA believes it
could be better worded to improve clarity. FEMA therefore proposes to explicitly
describe this assistance as DFA. The proposed revision would not change how FEMA
provides emergency communications or other types of DFA. Likewise, under section

206.225(a), emergency communications and emergency public transportation are only
eligible to save lives, to protect public health and safety, and to protect improved
property. Once those needs have been met, funding is discontinued. As there is no need
to restate this requirement in paragraphs (c) and (d), FEMA proposes to remove the
relevant sentence from each paragraph for clarity.
Additionally, FEMA proposes to add specific mention of appropriate auxiliary
aids and services where necessary for effective communication and paratransit services
for individuals with disabilities to paragraphs (c) and (d). FEMA currently provides DFA
for these services,63 and this proposed revision would not change that, but simply
improve clarity and highlight to the reader the availability of this assistance, consistent
with FEMA’s obligation to provide accessible disaster assistance.64
FEMA proposes to add a new paragraph (e) to address the rescue, care, shelter,
and essential needs of household pets, service animals, and assistance animals. Section
689(b) of PKEMRA and section 4 of the PETS Act amended section 403(a) of the
Stafford Act to include as essential assistance the rescue, care, shelter, and essential needs
of individuals with household pets and service animals and of such pets and animals.
With the change to FEMA’s statutory authority, the costs recipients and subrecipients
expend to rescue, shelter, care for, and provide essential needs for household pets and
service animals are reimbursable, and we therefore propose updating section 206.225
accordingly. Consistent with FEMA guidance on this issue,65 proposed paragraph (e)
includes “assistance animals,” since animals meeting the definition of that term proposed
in section 206.221 would fall within the scope of section 403(a) of the Stafford Act.66

See PAPPG at 114.
See 42 U.S.C. 5151, 29 U.S.C. 794.
65 See PAPPG at 119.
66 42 U.S.C. 5170b(a)(3)(J)(ii) refers to “such pets and animals,” indicating that household pets and service
and assistance animals are contemplated within our statutory authority.
63
FEMA proposes to add a new paragraph (f) to address the provision of temporary
relocation facilities for essential community services, which is authorized by section
403(a)(3)(D) of the Stafford Act. As a result of a disaster, essential community services
provided at public and PNP facilities may be disrupted to the extent that they cannot
continue unless they are relocated to another facility. An applicant may request
reimbursement for the reasonable costs for temporary facilities so that it can continue to
provide its essential community services. Consistent with current FEMA guidance,
paragraph (f) would define “essential community services” as those services performed
by governmental entities or private nonprofit organizations that are necessary to save
lives, protect and preserve property or public health and safety, or preserve the proper
function and health of the community at large.67 Proposed paragraph (f) would also
include a non-exhaustive illustrative list of specific essential community services as
previously provided in guidance. The temporary relocation provision in section
403(a)(3)(D) of the Stafford Act is not new and FEMA’s administration of temporary
relocation assistance is not changing; the proposed addition of paragraph (f) would
simply provide additional information in the regulations to improve clarity and usability.
vii. Section 206.226 Restoration of damaged facilities
FEMA proposes to revise the introductory text in this section by adding a
parenthetical after “restore” that reads “(repair, reconstruct, or replace),” which more
clearly reflects the scope of projects that are eligible for Public Assistance funding under
section 406 of the Stafford Act. We also propose revising this sentence to clarify that the
restoration of facilities must be on the basis of their “predisaster design,” consistent with
the term used in the definition in section 206.201. This is not a substantive change.
To improve clarity and readability, we propose to reorganize the paragraphs in
this section to be in alphabetical order.

See PAPPG at 130.

We propose to remove existing paragraphs (a)(2) and (3), which allow public
elementary and secondary school facilities to receive assistance under the Stafford Act
even though they may be otherwise eligible for assistance from the U.S. Department of
Education. The exception was added on October 25, 1993, to provide an exception to
FEMA’s general practice of deferring to the authority of another Federal agency when
both FEMA and the other agency have authority to grant assistance in response to a
declared major disaster.68 The change eliminated the overlap of FEMA and the U.S.
Department of Education programs and any confusion resulting from that overlap. Due
to changes made by the No Child Left Behind Act of 2001, 20 U.S.C. 6301, the U.S.
Department of Education no longer has the authority to assist elementary and secondary
schools in response to a disaster. Therefore, the exception is no longer necessary, and
these paragraphs are no longer applicable. Removing these paragraphs is not a
substantive change. FEMA will continue to provide assistance to public and eligible PNP
elementary and secondary school facilities as otherwise authorized by 44 CFR part 206.
In proposed paragraph (c) (existing (d)), we propose revising the heading to read
“Codes and standards,” consistent with the other edits to this paragraph, discussed below.
We also propose conforming edits elsewhere in the paragraph to change “standards” to
“codes and standards.” We also propose designating the introductory text as paragraph
(c)(2), adding a new paragraph (c)(1), and redesignating the remaining paragraphs
accordingly.
Section 1235(b) of DRRA amended section 406(e) of the Stafford Act to require
FEMA to fund repair, restoration, reconstruction, or replacement in conformity with “the
latest published editions of relevant consensus-based codes, specifications, and standards
that incorporate the latest hazard-resistant design and establish minimum acceptable

Disaster Assistance; Public Elementary and Secondary School Facilities Final Rule, 58 FR 55021 (Oct.
25, 1993).
criteria for the design, construction, and maintenance of residential structures and
facilities . . ..” We propose to codify this requirement in our regulations in proposed
paragraph (c)(1). Per the proposed revision to the definition of “facility” in section
206.201, the proposed language in proposed section 206.226(c)(1) does not include the
word “structure.” FEMA has issued interim guidance on DRRA section 1235(b), which
defines the framework for consistent and appropriate implementation of this consensusbased codes, specifications, and standards requirement,69 and this proposed addition to
the regulations would not displace that guidance. The framework and details provided
there would continue to apply; this proposed rule would simply incorporate the basic
statutory requirement into the regulations. We also propose revising new paragraph
(c)(2) (existing (d)) to provide that the costs of restoration under other Federal, State,
Tribal, and local codes and standards are still eligible, provided that they (1) are at least
as stringent as the applicable code or standard established in new paragraph (c)(1), and
(2) meet the existing requirements being retained in proposed paragraphs (c)(2)(i)-(v).
This proposed revision would ensure that the new DRRA-mandated consensus-based
codes and standards apply, but also allow for the funding of projects under other codes
and standards that meet or exceed that minimum. This proposed revision is consistent
with FEMA’s guidance on DRRA section 1235(b).70
In proposed paragraph (c)(2)(i) (existing (d)(1)), we propose removing “repair,”
since it is redundant with “restoration.” This is consistent with the proposed revision to
the introductory text of section 206.226, discussed above. We also propose removing the
undesignated parenthetical between paragraphs (c)(2)(i) and (ii) (existing (d)(1) and (2)),
which explains that standards may be different for new construction than for repair work.

Consensus-Based Codes, Specifications and Standards for Public Assistance, FEMA Recovery Interim
Policy FP-104-009-11 Ver. 2.1 (Dec. 20, 2019), available at https://www.fema.gov/sites/default/files/202007/fema_DRRA-1235b-public-assistance-codes-standards-interim-policy.pdf.
70 See Id. at 4.
Removing this language would not be a substantive change, but simply improve the
readability and clarity of the regulations; paragraph (c)(2)(i) would already make clear
that different types of restoration may have different applicable codes and standards, so
the parenthetical is redundant, and its location in the paragraph may cause confusion. In
addition, we propose to remove existing paragraph (d)(3)(ii), which addresses standards
for State governments until January 1, 2000, and local governments until January 1,
1999. This paragraph is no longer necessary because these dates have passed.
We propose to add a new paragraph (d) to address disaster damage. The
requirement that, to be eligible for restoration under section 206.226, damage must be the
result of a major disaster is a fundamental requirement of section 406 of the Stafford Act.
Deterioration, loss of useful life, or aging of a facility are not damage caused by a
disaster, and therefore do not qualify for Public Assistance funding. This proposed
addition would emphasize the disaster damage requirement and improve clarity in the
regulations.
Proposed paragraph (f) (existing (e)) addresses hazard mitigation and states that,
in approving grant assistance for restoration of facilities, the Regional Administrator may
require cost-effective hazard mitigation measures not required by applicable standards.
Although it has been FEMA’s policy to consider hazard mitigation measures when
evaluating projects for Public Assistance grants,71 FEMA proposes to add language
clarifying that recipients and subrecipients may request cost-effective hazard mitigation
measures when seeking grant assistance for the restoration of facilities to underscore the
importance of hazard mitigation in the recovery from a disaster. In recognition that there
are some projects in which hazard mitigation is not appropriate, or that some measures
may not be cost-effective, the Regional Administrator must consider, but is not required
to approve, all proposals for hazard mitigation.

See PAPPG at 153.

Proposed paragraph (i) (existing (c)) lists the critical services that eligible PNP
facilities must provide in order to be eligible for Public Assistance funding for permanent
work without applying for a loan from the U.S. Small Business Administration. Section
689h of PKEMRA amended section 406(a)(3)(B) of the Stafford Act to include education
as a critical service. To implement this new statutory authority, FEMA proposes to add
“education” to this list of critical services. Similarly, the Emergency Information
Improvement Act of 2015, Public Law 114-111, amended the list of critical services in
section 406(a)(3)(B) of the Stafford Act to replace “communications” with
“communications (including broadcast and telecommunications)”. FEMA proposes to
make this same change to the list of critical services in this paragraph. FEMA also
proposes to revise paragraphs (i)(1) and (2) (existing (c)(1) and (2)) to remove
unnecessary cross-references and improve clarity and readability; these changes would
not alter the current PNP eligibility requirements.
Proposed paragraph (j) (existing (g)) addresses approval of funding for relocation.
Existing paragraph (g)(1) currently states that the Regional Administrator may approve
funding for and require restoration of a destroyed facility at a new location when the
facility is and will be subject to repetitive heavy damage, the approval is not barred by
other provisions in 44 CFR, and the overall project, including all costs, is cost-effective.
FEMA proposes three clarifying, non-substantive edits to proposed paragraph (j)(1).
First, we propose replacing the phrase “a destroyed facility” with “a damaged
facility that is not repairable, per paragraph (k)(1) of this section.” Under proposed
paragraph (k)(1) (existing (f)(1)), if the cost to repair a damaged facility exceeds 50
percent of the cost to replace the facility, it is considered not repairable. Damaged
facilities that are not destroyed but that are not repairable are treated the same as
destroyed facilities with respect to relocation assistance. The proposed change would
make clear that the Regional Administrator may approve funding for and require

relocation of these damaged, not repairable facilities. The proposed change would not
affect the eligibility of destroyed facilities. Destroyed facilities are considered not
repairable and would continue to be eligible for relocation assistance if the other
requirements of proposed paragraph (j) are met.
Second, FEMA proposes to revise proposed paragraph (j)(1)(ii) to clarify that
FEMA regulation or applicable statutory requirements must not bar relocation approval.
Adherence to applicable statutory requirements is necessary even if those requirements
are not explicitly invoked in FEMA regulations in Title 44 CFR.
Third, we propose to remove the words “including all costs” from proposed
paragraph (j)(1)(iii). In determining the cost-effectiveness of relocation, it is not
necessary to include every cost and it is unlikely that all costs will be known at the time
the cost-effectiveness determination is made. FEMA considers the larger context of the
requested relocation when determining cost-effectiveness, such as whether the applicant
provides an essential community service that should be relocated. The regulatory text
should not suggest the burden for establishing cost-effectiveness is higher than it is. This
proposed revision is consistent with FEMA’s current guidance on relocation.72
In proposed paragraph (j)(2), we propose to clarify that when relocation is
required by the Regional Administrator, it is “the construction of” ancillary facilities such
as roads and utilities that is eligible.
Existing paragraph (g)(3) states that, when relocation is required by the Regional
Administrator, no future funding for repair or replacement of a facility at the original site
will be approved. We propose to clarify that the funding referred to is FEMA funding.
We also propose to replace the reference to 44 CFR part 9 with a reference to 44 CFR

See PAPPG at 160 (“If the cost to relocate the facility is less than the eligible cost to replace the facility
at its original location . . . then the project is cost effective. In instances where the cost of relocation
exceeds the cost to replace the facility at its original location FEMA may . . . determine cost
effectiveness.”).
part 80. Part 80, added to the CFR in 2007,73 consolidated FEMA’s procedures and
requirements for the acquisition of property for open space and expanded the scope of the
prior regulations to address the use of all types of mitigation funds.
In proposed paragraph (j)(4), we propose to remove the 90 percent limit on
eligible costs for alternate projects to reflect section 1207(a) of DRRA, which amended
section 406(c) of the Stafford Act to remove the 90 percent Federal cost share limit for
alternate projects. This proposed revision would incorporate the statutory change without
alteration. Also, in proposed paragraph (j)(4), we propose clarifying that if the actual
project costs for an alternate project are less than the estimated costs, only the actual costs
will be eligible for funding. This is not a substantive policy change; we would simply be
making this limitation explicit.74
Lastly, in proposed paragraph (j)(5), we propose to remove an outdated reference
to 44 CFR part 10, which was removed in 2016.75 When considering the environmental
planning and historic preservation impacts of providing funding for projects under the
Public Assistance program, FEMA now uses DHS Instruction Manual 023-01-001-1,
Revision 01, and Directive 023-01, Implementation of the National Environmental Policy
Act, and FEMA Directive 108-1 and Instruction 108-1-1, Environmental Planning and
Historic Preservation Responsibilities and Program Requirements, instead of 44 CFR part
10.
Proposed paragraph (k) (existing (f)) addresses when a facility should be repaired
versus replaced. Existing paragraph (f)(1) states in part that "[a] facility is considered
repairable when disaster damages do not exceed 50 percent of the cost of replacing a
facility to its predisaster condition.” We propose to replace the words “disaster damages

See Flood Mitigation Grants and Hazard Mitigation Planning, 72 FR 61720 (Oct. 31, 2007) (interim final
rule); see also Flood Mitigation Grants and Hazard Mitigation Planning, 74 FR 47471 (Sept. 16, 2009)
(final rule).
74 See PAPPG at 164.
75 See Removal of Environmental Considerations Regulations, 81 FR 56514 (Aug. 22, 2016).
do” with “the estimated repair cost for disaster damage does.” This is a more accurate
statement since it is the costs of repair rather than the damage incurred that is considered
when determining whether a facility is repairable. This change would not substantively
alter the requirements of this paragraph. Instead, it is simply intended to improve clarity.
Similarly, we propose replacing the words “predisaster condition” with “predisaster
design and function.” This latter term is used more often in FEMA’s guidance on repair
and replacement,76 and would improve clarity and consistency; it would not be a
substantive change. We also propose replacing the second occurrence of the words “a
facility” with “the facility” to avoid confusion. This would not be a substantive change.
Finally, in proposed paragraph (l)(1) (existing (k)(1)), we propose to change the
subheading from “Alternative use facilities” to “Converted facilities” in order to avoid
confusion with “alternate projects,” which are addressed in another section of this
subpart. We also propose to reword the text to clarify the limitations of eligibility for
converted facilities. When a facility is being used for an alternate use at the time of the
disaster, it is eligible for restoration either to the alternate use or to the original use,
whichever is less. For example, a school being used as a hospital at the time of the
disaster would be reimbursed for eligible costs to restore the facility to a school, or a
hospital, whichever is less. This is detailed in FEMA’s current guidance,77 but the
regulatory language in existing paragraph (k)(1) does not make this clear, so we propose
to revise the text to improve clarity and consistency.
As clarified in the preceding paragraph, FEMA currently considers eligible the
lesser of the cost to restore a converted facility to its immediate pre-disaster use or its
original use. FEMA requests comment on whether to amend its regulations to allow
reimbursement in some or all cases for the cost of restoring the facility to its original

76
See PAPPG at 157, 217.
PAPPG at 140.

design or to the design for the purpose the facility was being used prior to the disaster,
regardless of the lesser cost. FEMA seeks feedback on how best to balance supporting
community-driven recovery and responsible stewardship of taxpayer funds and whether
there are specific criteria FEMA should consider when evaluating converted facilities
projects.
We also propose non-substantive grammatical edits to proposed paragraph (l)(2)
(existing (k)(2)) to refer to “facility” in the singular instead of the plural, to match the
usage in proposed paragraph (l)(1) (existing (k)(1)).
viii. Section 206.227 Snow assistance
We propose to revise section 206.227 by replacing the word “snowstorms” with
“snowfall” to clarify that FEMA’s assessment of record or near-record conditions for the
purposes of snow assistance is based on the amount of snow that falls. This change is
non-substantive, but would improve clarity and make the language in section 206.227
consistent with the language used in FEMA’s guidance on snow assistance.78
ix. Section 206.228 Allowable costs
We propose to revise the introductory text in section 206.228 to clarify the
applicability of different authorities to the Public Assistance program. While 2 CFR part
200 provides basic requirements for allowable costs for all Federal awards, the Public
Assistance program is limited to the assistance authorized and other requirements
imposed by the Stafford Act.79 Part 200 therefore applies only to the extent that it does
not conflict with the more specific statutory provisions, or with FEMA’s implementation
of those provisions in regulation and guidance. The revised language does not represent
a substantive policy change with respect to allowable costs but is simply intended to more
accurately describe the interplay between these different authorities.

See PAPPG at 238.
See also 2 CFR 200.420 (“In case of a discrepancy between the provisions of a specific Federal award
and the provisions below, the Federal award governs”).
78
We propose to replace paragraph (a) with paragraph (a)(1) and to redesignate the
remaining paragraphs accordingly. The heading of new paragraph (a) would be revised
to read “Eligible Force Account Equipment Costs,” to more accurately describe its
contents.
We also propose to remove paragraph (a)(2)(ii) to remove the provision on debris
removal work for major disasters and emergencies declared in response to Hurricane
Sandy. This provision is out of date and no longer needed.
We propose to add a new paragraph 206.228(b)(2) incorporating the Public
Assistance alternative procedures pilot program for debris removal. The Sandy Recovery
Improvement Act of 2013 amended the Stafford Act to add section 428, which, inter alia,
authorized alternative procedures for debris removal under the Public Assistance
program.80 It also authorized FEMA to implement the alternative procedures through a
pilot program. FEMA established a pilot program that applied to debris removal in all
major disasters and emergencies declared on or after June 28, 2013, and has repeatedly
revised the pilot program since then.81 Under normal procedures for emergency work,
only overtime labor is eligible for budgeted employees, while straight and overtime labor
are eligible for unbudgeted employees.82 Under the alternative procedures, as currently
implemented in FEMA guidance, applicants can opt to participate in the straight-time
procedure for debris removal, where straight-time labor costs are eligible for budgeted
employees conducting Category A debris removal activities.83 Proposed new paragraph
206.228(b)(2) would incorporate this policy into FEMA’s regulations.

See Pub. L. 113-2, § 1102, 127 Stat. 39, 39-42.
See FEMA, Archives: Public Assistance Alternative Procedures (PAAP),
https://www.fema.gov/assistance/public/policy-guidance-fact-sheets/public-assistance-alternativeprocedures-paap-archives (last accessed June 12, 2024).
82 42 U.S.C. 5170b(d)(1)(B); 44 CFR 206.228(a)(2)(iii) (proposed 206.228(b)(3)).
83 See PAPPG at 101. When FEMA first issued guidance on the alternative procedures, it provided for a
variety of alternatives, including, for example, recycling revenues and an increased Federal cost share for
accelerated removal. See PAAP Alternative Procedures Pilot Program Guide for Debris Removal, ver. 1
(June 28, 2013), available at https://www.fema.gov/sites/default/files/2020-07/fema_PAAP-debris80
The Sandy Recovery Improvement Act of 2013 also amended section 403 of the
Stafford Act to provide for the eligibility of straight-time for force account labor for state
and local employees conducting emergency protective measures, where the work is not
typically performed by the employees and it is the type of work that might otherwise be
carried out by contract.84 We request comment on whether FEMA should incorporate
that change in its regulations. In addition, we request comment on a provision to make
straight-time labor costs eligible for permanently employed health care personnel
reassigned or redeployed to perform eligible healthcare work for any major disaster or
emergency declared by the President on or after March 13, 2020, in response to the
COVID-19 pandemic. In light of the widespread impact of the pandemic and its
continued impact on State and local governments, we seek feedback from the public on
whether such a provision would promote efficient and timely recovery.
Existing paragraph (a)(3) provides that administrative and management costs for
major disasters and emergencies will be paid in accordance with 44 CFR part 207. We
propose removing paragraph (a)(3) to avoid confusion. Part 207 was first published in
200785 and implemented section 324 of the Stafford Act, which authorizes FEMA to
provide funding for management costs incurred in the administration of the Hazard
Mitigation Grant Program and the Public Assistance program. Section 1215 of DRRA
amended section 324 of the Stafford Act to require FEMA provide funding for
management costs at specific percentage rates. As a result of this amendment, the
existing part 207 regulations are no longer current. FEMA has implemented the DRRA

removal-guide-V1_2013.pdf. Over the years, as FEMA revised the guidance, various provisions were
removed for being ineffective or underutilized, and by 2019, when FEMA issued version 7 of the guidance,
it only included the straight time force account labor provision. See PAAP Alternative Procedures Pilot
Program Guide for Debris Removal, ver. 7 (June 28, 2019), available at
https://www.fema.gov/sites/default/files/2020-07/fema_PAAP-debris-removal-guide-V7_6-28-2019.pdf.
In 2020, this guidance was incorporated into FEMA’s comprehensive Public Assistance program guidance,
the PAPPG, retaining only this straight time force account labor provision. See PAPPG at 101.
84 See Pub. L. 113-2, § 1108, 127 Stat. 39, 47.
85 See Management Costs, 72 FR 57875 (Oct. 11, 2007).

section 1215 amendments via policy,86 but FEMA has not yet issued new regulations. As
such, the reference to part 207 in paragraph (a)(3) may cause confusion, and we propose
to remove it. This removal would not change the current calculation or funding of
management costs and future revisions to part 207 would still apply even without the
specific cross-reference here. This proposed change would help simply to improve
clarity.
E. 44 CFR part 206, subpart K—Community Disaster Loans
The Disaster Relief Act of 1974 (Pub. L. 93-288) authorized FEMA’s Community
Disaster Loan (CDL) program, which is currently codified in Section 417 of the Stafford
Act, 42 U.S.C. 5184. The CDL program provides funding for local governments to
operate their essential community services after substantial revenue loss caused by a
disaster.87
i. Section 206.361 Loan program
Section 608 of the Security and Accountability for Every Port Act of 2006 (SAFE
Port Act), Pub. L. 109-347, 120 Stat. 1884, amended section 417(b) of the Stafford Act
by increasing the amount that communities may receive in a CDL. It now allows
communities to receive up to 50 percent of their annual operating budgets (not to exceed
$5 million) if they suffered a loss of tax or other revenue equal to or greater than 75
percent of their annual operating budgets for the fiscal year in which the disaster
occurred. We propose to revise paragraph (b) accordingly.
ii. Section 206.363 Eligibility criteria

See Hazard Mitigation Grant Program Management Costs (Interim), FP 104-11-1 (Nov. 14, 2018),
available at https://www.fema.gov/sites/default/files/2020-07/fema_DRRA-1215-hazard-mitigation-grantprogram-management-costs-interim-policy.pdf; Public Assistance Management Costs (Interim), FP 10411-2 (Nov. 14, 2018), available at https://www.fema.gov/sites/default/files/202007/pa_management_costs_interim_policy.pdf.
FEMA’s website provides more information on CDLs at
https://www.fema.gov/assistance/public/nonstate-nonprofit/community-disaster-loan (last accessed June
12, 2024).
We propose to remove the words “or emergency” from paragraph (b)(1). Section
417(a) of the Stafford Act authorizes CDLs only under major disaster declarations, and
FEMA only makes CDLs in such cases; however, paragraph (b)(1) erroneously refers to
major disasters and emergencies. This revision would make clear that CDLs are not
authorized for emergency declarations, consistent with the Stafford Act.
iii. Section 206.364 Loan application
Consistent with the proposed edit to section 206.361, we propose to revise
paragraph 206.364(d)(1)(ii) to reflect that, per section 608 of the SAFE Port Act,
communities may now receive CDLs of up to 50 percent of their annual operating
budgets (not to exceed $5 million) if they suffered a loss of tax or other revenue equal to
or greater than 75 percent of their annual operating budgets for the fiscal year in which
the disaster occurred. Additionally, we propose a non-substantive revision to paragraph
(c)(2) to clarify that the deadline to submit a revised loan application is sixty “calendar
days” from the date of the initial disapproval.
IV. Regulatory Analysis
A. Executive Order 12866, as amended, Regulatory Planning and Review and
Executive Order 13563, Improving Regulation and Regulatory Review, Executive
Order 14094 Modernizing Regulatory Analysis
Executive Orders 12866 (Regulatory Planning and Review), as amended by
Executive Order 14094 (Modernizing Regulatory Review), and 13563 (Improving
Regulation and Regulatory Review) direct agencies to assess the costs and benefits of
available regulatory alternatives and, if regulation is necessary, to select regulatory
approaches that maximize net benefits (including potential economic, environmental,
public health and safety effects, distributive impacts, and equity). Executive Order 13563
emphasizes the importance of quantifying both costs and benefits, of reducing costs, of
harmonizing rules, and of promoting flexibility.

The Office of Management and Budget (OMB) has designated this proposed rule
a “significant regulatory action” under section 3(f) of Executive Order 12866, as
amended by Executive Order 14094, but it is not significant under section 3(f)(1).
Accordingly, the rule has been reviewed by OMB.
This analysis provides a summary of the potential costs, benefits, and transfer
payments for the Public Assistance program update Notice of Proposed Rulemaking
(NPRM) under the criteria of Executive Orders 12866, 13563, and 14094. The full
Regulatory Impact Analysis (RIA) for this proposed rule is included in the docket for this
NPRM.
FEMA proposes to revise its PA and CDL programs regulation to reflect current
statutory authorities, agency practice, and implement program improvements. The
proposed rule would incorporate changes brought about by amendments to the Stafford
Act. FEMA is also proposing clarifications and corrections to the Public Assistance
program. FEMA previously implemented many of the changes limiting the practical
effects of this rule. The primary purpose of this rule would be to codify these changes to
improve efficiency and consistency of information for the Programs. The following
Table 1 summarizes the proposed changes of this rule and their impacts as measured
against a no-action baseline (i.e., what the world would look like absent the rule) and
Table 2 summarizes the changes and their impacts as measured against a pre-statutory
baseline (i.e., what the world would look like without the statutory changes or FEMA’s
implementing guidance).
Table 1. Summary of the Impacts for the Proposed Changes, No-Action Baseline, 20202029 (2019$)
Category

Changes

Summary
Codify availability of assistance for the rescue, care, shelter and essential
needs of household pets and service animals.
Codify expansion of PA eligibility for certain types of private nonprofits
(PNPs): rehabilitational facilities, community and performing arts
facilities, broadcasting facilities, food banks, houses of worship, and
center-based childcare facilities.

Codify expanding CDL percentage to 50 percent under certain conditions
while maintaining $5 million maximum loan cap.
Codify alternative procedures for debris removal.
Codify the alternate project funding Federal cost share caps.
Codify consensus-based codes and standards requirement for PA funded
projects.
Proposed requirement for applicants to identify any legal considerations
for alternate projects.
Proposed requirement that State and Tribal Administrative Plans include
an outline for timely closeout of project and disaster specific staffing
plans.
Proposed setting of submission dates for certain work documentation
required for PA projects.
Non-substantive changes and clarifications to improve the efficiency and
consistency of the PA program.
Affected Population

Applicants eligible to request a Federal major disaster declaration
authorizing PA, including 56 State and Territorial governments, 574
Federally recognized Indian Tribal governments, local governments, and
certain private nonprofit organizations.

Transfer Payments from
FEMA to Applicants

Under a no-action baseline, there are no transfer payments to report.

Costs (quantitative)

For the no-action baseline, the total 10-year costs to Applicants and FEMA
discounted at 3 percent and 7 percent, respectively, is $251,270 and
$216,272. The annualized cost is $29,457 and $30,792 at the 3 and 7
percent discount rates.

Benefits (quantitative)

FEMA is unable to estimate quantitative benefits.

Benefits (qualitative)

Codifying already implemented changes would improve clarity and align
FEMA regulations with statutory changes and current practices and
procedures.
Identifying legal considerations early in the applications process would
allow for more complete project application review for alternate projects.
Adding submission deadlines for work documentation would increase
clarity and add more time early in the application process for work
documentation.
Keeping administrative plans up-to-date and providing additional staffing
information about prior disasters would help recipients be in a better
position to respond to and recover from emergencies and disasters.

Table 2. Summary of the Impacts for Changes, Pre-Statutory Baseline, 2000-2029
(2019$)
Category

Summary

Changes

Amends availability of assistance for the rescue, care, shelter and essential
needs of household pets and service animals.
Amends PA eligibility for certain types of private nonprofits (PNPs):
rehabilitational facilities, community and performing arts facilities,
broadcasting facilities, food banks, houses of worship, and center-based
childcare facilities.
Amends CDL percentage to 50 percent under certain conditions while
maintaining $5 million maximum loan cap.
Amends alternative procedures for debris removal.
Amends the alternate project funding Federal cost share caps.
Amends consensus-based codes and standards requirement for PA funded
projects.
Proposed requirement for applicants to identify any legal considerations
for alternate projects.

Proposed requirement that State and Tribal Administrative Plans include
an outline for timely closeout of project and disaster specific staffing
plans.
Proposed setting of submission dates for certain work documentation
required for PA projects.
Non-substantive changes and clarifications to improve the efficiency and
consistency of the PA program.
Affected Population

Transfer Payments from
FEMA to Applicants

Costs (quantitative)
Benefits (quantitative)

Applicants eligible to request a Federal major disaster declaration
authorizing PA, including 56 State and Territorial governments, 574
Federally recognized Indian Tribal governments, local governments, and
certain private nonprofit organizations.
Under a pre-statutory baseline, the net increase in 10-year total transfer
payments discounted at 3 and 7 percent, respectively, is $50,762,154 and
$41,796,443. The net increase in annualized transfer payment is
$5,950,873 at the 3 and 7 percent discount rates.
Under the pre-statutory baseline, the total 10-year costs to Applicants and
FEMA discounted at 3 percent and 7 percent, respectively, is $70,957,558
and $58,434,274. The annualized cost is $8,318,390 and $8,319,726 at the
3 and 7 percent discount rates.
FEMA is unable to estimate quantitative benefits.
Expands PA eligibility for certain PNPs allowing FEMA to consistently
provide additional assistance to such PNPs to allow them to recover more
quickly from disaster-damage.
Improving clarity and aligning FEMA regulations with statutory changes
and current practices and procedures.
Increasing recipient flexibility when determining whether the community
would benefit more from facility restoration or an alternate project.

Benefits (qualitative)

Promotes resiliency and reduces future damage risk of repaired facilities
with consensus-based codes and standards requirement for PA funded
projects.
Increasing flexibility for debris removal projects by allowing FEMA to
reimburse base and overtime wages for the employees of State, Tribal, or
local governments.
Identifying legal considerations early in the applications process would
allow for more complete project application review for alternate projects.
Increases clarity and adds more time early in the application process for
work documentation.
Keeping administrative plans up-to-date and providing additional staffing
information about prior disasters would help recipients be in a better
position to respond to and recover from emergencies and disasters.

Need for Regulation
FEMA proposes to revise its PA and CDL program regulations to reflect current
statutory authorities and implement program improvements. The proposed rule would
incorporate changes brought about by amendments to the Stafford Act88 to the PA and

Several Federal statutes have amended sections of the Stafford Act relating to Public Assistance and
Community Disaster Loans. These include the Post-Katrina Emergency Management Reform Act of 2006
(PKEMRA), 6 U.S.C. 701 et seq., the Security and Accountability for Every Port Act of 2006 (SAFE Port
CDL programs. FEMA proposes to amend its PA and CDL program regulations to
incorporate these statutory changes and to improve program administration. FEMA is
also proposing clarifications and corrections to improve the efficiency and consistency of
the PA program. FEMA previously implemented many of the changes through guidance,
limiting the practical effects of this rule. The primary purpose of this rule would be to
codify these changes to improve efficiency and consistency of information for the
program.
FEMA addresses the substantive changes in this analysis and presents how they
affect costs, benefits, and transfer payments. The remaining changes would be nonsubstantive, meaning they are technical and include definitional updates and other
changes that modernize and standardize regulations, reduce redundancy, or increase
readability. The non-substantive changes do not have an economic impact. FEMA
included a detailed marginal analysis table in Appendix A of the separate Regulatory
Impact Analysis that summarizes changes listed in the NPRM and the related impacts.
Affected Population
The proposed rule would affect all potential applicants for Federal assistance
under the PA and CDL programs. Eligible applicants for PA include 56 State and
Territorial governments, 574 Federally recognized Tribal governments, local
governments, and certain PNPs.89 Based on data from 2010 to 2019, the PA program as a
whole obligated an average amount of $5.6 billion (in 2019 dollars) across 28,721
projects per year. For PNP entities specifically, the PA program obligated an average

Act), Pub. L. 109-347, 120 Stat. 1884, the Pets Evacuation and Transportation Standards Act of 2006
(PETS Act), Pub. L. 109-308, 120 Stat. 1725, the Sandy Recovery Improvement Act of 2013 (SRIA), Pub.
L. 113-2, 127 Stat. 39, the Emergency Information Improvement Act of 2015, Pub. L. 114-111, 129 Stat.
2240, the Bipartisan Budget Act of 2018, Pub. L. 115-123, 132 Stat. 64, and the FAA Reauthorization Act
of 2018, Division D, Disaster Recovery Reform Act of 2018 (DRRA), Pub. L. 115-254, 132 Stat. 3438.
89 A list of the 574 Tribal entities can be found at: Indian Entities Recognized by and Eligible To Receive
Services From the United States Bureau of Indian Affairs, 88 FR 2112 (Jan. 12, 2023).

amount of $454.7 million (in 2019 dollars) per year across 2,070 projects from 2010 to
2019.
Under the PA program, FEMA awards grants to help communities quickly
respond to and recover from Presidentially-declared emergencies and major disasters.
Generally, the State, Territory, or the District of Columbia for which the emergency or
major disaster is declared is the recipient. Federally recognized Indian Tribal
governments may apply for Public Assistance directly and be classified as a recipient.90
The applicant is a State, Tribal, or Territorial agency, local government, or eligible
private nonprofit organization submitting an application to the recipient for assistance
under the recipient’s grant. Upon award, the recipient notifies the applicant of the award,
and the applicant becomes a subrecipient.
Baseline
Following guidance in OMB Circular A-4, FEMA assessed each impact of this
rule against a pre-statutory and no-action baseline. The pre-statutory baseline is what the
world would be like if the relevant statute(s) had not been adopted and implemented
through guidance. Accordingly, measuring the proposed rule against a pre-statutory
baseline shows the effects of the proposed rule as compared to FEMA practice prior to
the enactment of the enabling statute or guidance (i.e., as if FEMA had not already
implemented the statutory or policy changes.) A no-action baseline is an assessment of
the way the world would look absent the proposed action. Accordingly, measuring the
proposed rule against a no-action baseline shows the effects of the proposed rule as
compared to current FEMA practice (i.e., compared to FEMA guidance, which reflects
FEMA’s current practice).

FEMA Tribal Policy (Rev. 2). FEMA. https://www.fema.gov/sites/default/files/documents/fema_tribalpolicy.pdf. Dec. 18, 2020.
The proposed rule under a no-action baseline would have monetary costs and
qualitative benefits. Under a pre-statutory baseline, the proposed rule would have
distributional transfer payments, monetary costs, opportunity costs, and qualitative
benefits. Table 3 shows the undiscounted annual effects of this proposed rule under a noaction baseline. Table 4 shows the undiscounted annual effects of this proposed rule
under a pre-statutory baseline.

Table 3. Average Annual Effects of Proposed Rule, Future 10-Year Period, NoAction Baseline (2019$)

Change
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
Change
Rehabilitational
Facilities
Pets and Service
Animals
Community and
Performing Arts
CDL Program
Debris Removal Pilot
Broadcasting
Facilities
Food Banks
Houses of Worship
Alternate Project
Funding
Center-Based
Childcare Facilities
Codes and Standards
Alt Projects Legal
Considerations
State and Tribal
Admin Plans*
Work Documentation
Familiarization*

Year
Implemente
d
1988
2006
2007
2012
2013
2015
2017
$0

Transfers
from
FEMA to
Recipients
$0

$0

$0

$0

$0

$0
$0
$0

$0
$0
$0

Costs

Benefits

Qualitative

$0
$0
$0

$0
$0
$0

$0

$0

$0

New

$1,434

$0
$0

New

$22,138

New

$0
$4,926

2017
$0
$0
$0

Annual Increase
$28,498
$0
Annual Decrease
$0
$0
Total
$28,498
Qualitative
$0
* For consistency in the table, this cost is displayed as an annual average over ten years.
Familiarization cost would be a one-time cost in the first year of $49,264. Change 13 has a cost of
$40,250 in the first year and $20,125 in subsequent years.

Table 4. Average Annual Effects of Proposed Rule, Future 10-Year Period, Pre-Statutory
Baseline (2019$)
Change
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
Change

Year
Implemented

Rehabilitational Facilities
Pets and Service Animals
Community and Performing Arts
CDL Program
Debris Removal Pilot
Broadcasting Facilities
Food Banks
Houses of Worship
Alternate Project Funding
Center-Based Childcare Facilities
Codes and Standards
Alt Project Legal Considerations
State and Tribal Admin Plans*
Work Documentation
Familiarization*

1988
2006
2007
2012
2013
2015
2017
2017
2017
2018
2019
New
New
New

Costs
$10,890
$3,496
$1,485
$0
$0
$1,485
$0
$76,725
$0
$0
$8,194,853
$1,434
$22,138
$0
$4,926

Benefits

Qualitative

Transfers
from
FEMA to
Recipients
$1,126,114
$590,464
$224,514
$0
-$7,373,048
$344,235
$0
$2,121,795
$2,524,814
$0
$6,391,985
$0
$0
$0
$0

Annual Increase
$8,317,432
$13,323,921
Annual Decrease
$0
-$7,373,048
Total (Net)
$8,317,432 Qualitative
$5,950,873
* For consistency in the table, these costs are displayed as an annual average over ten years. Familiarization
would be a one-time cost in the first year of $49,216. Change 13 has a cost of $40,250 in the first year and
$20,125 in subsequent years.

Costs
No-Action Baseline
FEMA estimates the total average undiscounted cost for this proposed rule, as
measured against a no-action baseline, to be $28,498 per year over a future ten-year
period. Changes 1 through 11 would not result in any additional costs, as measured
against the no-action baseline, because FEMA has already implemented them through
guidance and proposes to codify these changes through this rule. The proposed rule
under a no-action baseline would result in additional costs due to Change 12: Alternate
Project Legal Considerations (recipient costs of $1,434) and Change 13: State and Tribal
Admin Plans (recipient costs of $40,250 in the first year and $20,125 in the subsequent
years). Changes 12 and 13, and their estimated impacts, are described in more detail in
the Pre-Statutory Baseline section below.

The proposed regulation would also result in familiarization costs. FEMA
assumed a State Government Chief Executive, a senior level government official, or an
individual in an equivalent occupation would read the proposed regulations to understand
the changes. FEMA obtained the wage rate of $52.83 for a State Government Chief
Executive from BLS OES data.91 To account for employee benefits, FEMA multiplied
the base hourly wage rate by a load factor of 1.6 to find a loaded hourly wage rate of
$84.53 ($52.83 hourly mean wage for Chief Executives x 1.6 wage rate multiplier).92
FEMA used 93 respondents (56 States territories + 37 Tribes acting as recipients)93 in the
estimate as this is the level from which a PA disaster declaration request is made. FEMA
assumed there would be 112 Chief Executives that review the proposed changes, two
from each State. FEMA also assumed there would be 74 Chief Executives that review
the proposed changes, two from each Tribe. This means that there are a total of 186 (112
+ 74) Chief Executives. FEMA assumed the States regularly update their emergency
response networks and local emergency management divisions on changes in the field
and the States would disseminate the regulatory changes through each State’s respective
process. As of the time of this analysis, there are approximately 47,000 words in the
NPRM document for this rule. Although FEMA could not identify formal studies on the
subject, some reports suggest that, on average, a person reads about 250 words per
minute, though there can be variation according to individual attributes and type of

BLS OES, May 2019, NAICS code 999200, State Government, Standard Occupational Code 11-1011 for
Chief Executives, mean wage. https://www.bls.gov/oes/2019/may/naics4_999200.htm.
92 Fully loaded wage rates include other benefits, we are using a factor of 1.6 to calculate fully loaded wage
rates. The unloaded wage rate does not account for costs to the employer for benefits, such as paid leave,
health insurance, retirement, and other benefits. Bureau of Labor Statistics. Employer Costs for Employee
Compensation, Table 1. “Employer costs For Employee Compensation by ownership, March 2019.”
http://www.bls.gov/news.release/archives/ecec_06182019.pdf. June 18, 2019.
The wage multiplier is calculated by dividing total compensation for State and local government workers of
$50.89 by Wages and salaries for State and local government workers of $31.75 per hour yielding a
benefits multiplier of approximately 1.6 ($50.89 ÷ $31.75).
93 56 States includes 50 states and 6 territories: the District of Columbia, and territories including American
Samoa, Guam, Northern Mariana Islands, Puerto Rico, and U.S. Virgin Islands. FEMA’s annual estimate
of 37 Tribes was based on the number of Tribes acting as recipients historically.
material being read.94 Based on the word count at the time of this analysis, it would thus
take about 3.1333 (47,000 words ÷ 250 words per minute ÷ 60 minutes per hour) hours to
read the rule. At the burdened wage for Chief Executives, this would be about $264.86
($84.53 × 3.1333 hours) per review. The total familiarization cost would be about
$49,264 (186 respondents × $264.86), which would potentially be incurred during the
first year the rule is effective.
Under a no-action baseline, FEMA estimates the total annual cost undiscounted
would be $90,948 ($1,434 + $40,250 + $49,264) for only the first year. The first year
includes the calculations for familiarization costs discussed in the previous paragraph as
well as costs due to Change 12: Alternate Project Legal Considerations and Change 13:
State and Tribal Admin Plans. Then the total annual cost undiscounted would be $21,559
($1,434 + $20,125) for each year after that. The discounted total net 10-year cost at 3
percent and 7 percent, respectively, would be $251,270 and $216,272. The annualized
cost would be $29,457 and $30,792 at the 3 and 7 percent discount rates (Table 5).
Table 5. Summary of No-Action Baseline Costs, Future 10-Year Period (2019$)

The benchmark of 250 words per minute applies to most adults, according to several reports. See, e.g.,
HealthGuidance.org, What Is the Average Reading Speed and the Best Rate of Reading?,
https://www.healthguidance.org/entry/13263/1/what-is-the-average-reading-speed-and-the-best-rate-ofreading.html, (last accessed June 12, 2024); ExecuRead, Speed Reading Facts,
https://secure.execuread.com/facts/, (last accessed June 12, 2024). It is noted that the reading of technical
material can be slower than other types of documents. Because this document is technical in some ways,
the actual review time might be higher, thus resulting in higher familiarization costs than reported herein.
Recipient
Costs

Total Costs
Undiscounted

Annual
Costs
Discounted
at 3%

Annual
Costs
Discounted
at 7%

Year

FEMA Costs

2020
2021
2022
2023
2024
2025
2026
2027
2028
$0

$90,948

$90,948

$88,299

$84,998

$0

$21,559

$21,559

$20,321

$18,830

$0

$21,559

$21,559

$19,730

$17,599

$0

$21,559

$21,559

$19,155

$16,447

$0

$21,559

$21,559

$18,597

$15,371

$0

$21,559

$21,559

$18,055

$14,366

$0

$21,559

$21,559

$17,529

$13,426

$0

$21,559

$21,559

$17,019

$12,548

$0

$21,559

$21,559

$16,523

$11,727

$0

$21,559

$21,559

$16,042

$10,960

$0

$284,979

$284,979

$251,270

$216,272

$29,457

$30,792

Total
Annualized

Pre-Statutory Baseline
The proposed rule, under a pre-statutory baseline, would result in additional costs
for Change 1: Rehabilitational Facilities; Change 2: Pets and Service Animals; Change 3:
Community and Performing Arts; Change 6: Broadcasting Facilities; Change 8: Houses
of Worship (HOW); Change 11: Codes and Standards; Change 12: Alternate Project
Legal Considerations; and Change 13: State and Tribal Admin Plans. The proposed rule
would also result in familiarization costs. FEMA estimates the total undiscounted cost of
this proposed rule, as assessed against a pre-statutory baseline, would be $8,317,432 per
year over a future ten-year period.
Change 2: PKEMRA and the PETS Act authorized FEMA to provide assistance
for the rescue, care, shelter, and essential needs of household pets and service animals.
FEMA implemented this change via PA guidance and proposes to codify it through this
rule. FEMA used data from Enterprise Data Warehouse (EDW) database between 2006
and 2019 to estimate costs of assistance for the rescue, care, shelter, and essential needs
of household pets and service animals. FEMA estimated an increase in costs for

recipients for completing additional assistance request forms and FEMA for reviewing
these additional forms totaling $3,496 ($3,392 recipients + $104 FEMA) per year.
Changes 1, 3, 6, and 8: The definition of PNPs was expanded by multiple
statutory amendments occurring between 1988-2018 to include the following:
rehabilitational facilities in 1988, community and performing arts facilities in 2007,
broadcasting facilities in 2015, and houses of worship in 2017. FEMA implemented all
these changes via PA guidance and proposes to codify them through this rule. FEMA
used PNP project data from the EDW database for 2000-2019 to estimates costs for these
changes but impacts in many cases were estimated with fewer than 10 years of data due
to different dates of implementation. FEMA estimated an increase in costs for PNP
recipients for completing assistance request forms and FEMA for reviewing these forms
totaling $90,585 (rehabilitational facilities $10,890 ($ 10,516 recipients + $374 FEMA) +
community and performing arts $1,485 ($1,434 recipients + $51 FEMA) + broadcasting
$1,485 ($1,434 recipients + $51 FEMA) + house of worships $76,725 ($74,090 recipients
+ $2,635 FEMA)) per year.
Change 11: DRRA section 1235(b) defines the framework for consistent and
appropriate implementation of consensus-based codes, specifications, and standards
requirement for disaster-related repair, restoration, reconstruction, or replacement of
buildings, roads and bridges, electric power, potable water, and wastewater projects.
FEMA implemented this statutory change in 2019. Because this change was recently
made and these types of projects can take years to complete, FEMA does not have 10
years of data with the change in effect. Therefore, FEMA estimated the impact of this
change against a pre-statutory baseline by using data pulled from EDW from 2010
through 2018. During this time period, FEMA provided assistance for an average of
2,386 projects (PA categories: C – roads/bridges, E – buildings/equipment, F – utilities)
per year.

FEMA used the Building Codes Adoption Tracking (BCAT) Regional reports95 to
identify projects in States with moderate to low hazard-resistant building code adoption
rates. FEMA expects the consensus-based codes and standards requirement would
impact projects in moderate to low hazard-resistant building code areas by applying more
stringent requirements than the local codes and standards. Based on the BCAT reports,
FEMA estimates the number of impacted projects from 2010 to 2018 was 1,313 projects
per year and the average annual amount for these projects was $819,485,316
($179,372,869 non-Federal share + $640,112,447 Federal share) per year. FEMA
developed a project cost increase range of 1 percent to 10 percent based on input from
subject matter experts and is in line with additional costs estimates of hazard-resistant
building codes referenced in the 2020 Building Codes Saves: A Nationwide Study and
2019 Natural Hazard Mitigation Saves Report.96 This range of additional costs reflects
the unknown variations between local codes and/or standards used and the consensusbased codes and standard, and FEMA expects Change 11 would have limited impacts on
projects costs due to FEMA’s policy referencing multiple industry consensus-based codes
and standards that may be selected from to meet the requirement.97 Accordingly, for the
impacted 1,313 projects, FEMA estimated between an additional $8,194,853
($819,485,316 × 1 percent) and $81,948,532 ($819,485,316 × 10 percent) per year in PA
total project costs for the consensus-based codes and standards requirement. Due to the
policy implementation in November 2019, little post-implementation data were available.

FEMA Building Code Adoption Tracking: Regions 1-10 Reports, 2023. A State or Territory is classified
as moderate or lower resistance when less than 75 percent of jurisdictions have adopted hazard-resistant
building codes. Available at https://www.fema.gov/emergency-managers/risk-management/buildingscience/bcat/fact-sheets. Accessed May 2, 2023
96Building Codes Saves: A National Study, page 1-6, https://www.fema.gov/sites/default/files/202011/fema_building-codes-save_study.pdf. Accessed August 9, 2023. Additional reference, Natural Hazard
Mitigation Saves: 2019 Report, page 70, 126, 143, Additional construction cost estimates for flooding 1.7
percent, hurricane 1 percent, and safe room wind 5 to 7 percent, respectively.
https://www.nibs.org/files/pdfs/NIBS_MMC_MitigationSaves_2019.pdf. Accessed August 9, 2023.
97 Appendix A: Consensus-Based Codes, Specifications and Standards, page 9-16. December 20, 2019.
https://www.fema.gov/sites/default/files/202005/DRRA1235b_Consensus_BasedCodes_Specifications_and_Standards_for_Public_Assistance122019.pd
f.
For the primary estimate of this change under a pre-statutory baseline, FEMA selected
the lower estimate of $8,194,853 per year, due to the change aligning with commonly
used industry building standards. Not all of these additional costs are borne by recipients
as PA projects have a cost share structure; the increased total project costs for more
stringent codes and standards are partially offset by FEMA in form of increased grants
(transfer payments; addressed below) resulting in a higher the Federal cost share amount
provided to recipients.
Change 12: Alternate Project Legal Considerations is the proposal to add a
requirement for alternate projects that the recipient must identify any other legal
considerations that might impact the project, such as liens on property, ownership issues,
or zoning concerns, beyond those currently required. FEMA has not yet implemented
this change and proposes to do so through this rule. FEMA anticipates that the burden to
identify any legal considerations would be comparable to that of identifying issues
required under the current regulations, such as floodplain management and insurance
considerations, as they are similar in nature. FEMA estimates the burden associated with
identifying floodplain management and insurance considerations to be 0.5 hours.98 Based
on data from 2010-2019, on average, FEMA funded 53 alternate projects per year. Using
the 0.5 hour burden estimate as the estimated time required to complete the legal
considerations form and the State government loaded mean wage rate of $54.10 ($33.81
hourly mean wage for Emergency Management Directors x 1.6 wage rate multiplier)
yields an annual average cost of $1,434 (53 projects x 0.5 hours x $54.10 fully-loaded

See Information Collection Request 202208-1660-001, Special Considerations Questions Form 009-0120, https://www.reginfo.gov/public/do/PRAViewICR?ref_nbr=202208-1660-001. Until recently,
information about floodplain management and insurance considerations was captured on Special
Considerations Questions Form 009-0-120, with an estimated hour burden of 0.5 hours per response. This
collection has been revised and now captures floodplain management and insurance considerations
information on different forms that also ask for other information. See Information Collection Request
202212-1660-015, https://www.reginfo.gov/public/do/PRAViewICR?ref_nbr=202212-1660-015.
wage rates for Emergency Management Directors).99 Because FEMA has not
implemented this change and proposes to do so through this rule, the estimated annual
cost of Change 12 is the same whether measured against the no-action or pre-statutory
baseline.
Change 13: State and Tribal Admin Plans is FEMA’s proposal to add certain
requirements to State and Tribal administrative plans. As currently required, all
recipients file administrative plans with FEMA.100 This requirement includes Indian
Tribal governments when they choose to act as a recipient. The proposed rule would add
that recipient administrative plans must include an outline for timely closeout of project
and disaster-specific staffing plans. FEMA subject-matter experts estimate that 93
respondents (56 States/Territories and 37 Tribes acting as recipients101) would provide
one Administrative Plan per year and that the additional activities identified above would
add an average of 8 hours of effort to the current burden estimate in the first year, and
then 4 hours in each successive year to account for any updates needed. Using the State
Emergency Management Directors, the fully-loaded wage rate is $54.10 ($33.81 hourly
mean wage for Management Directors x 1.6 wage rate multiplier), which yields a total
burden of $40,250 (93 respondents x 1 annual plan x 8 hours x $54.10 fully-loaded wage
rate for Management Directors) in year one and $20,125 (93 respondents x 1 annual plan
x 4 hours x $54.10 fully-loaded wage rate for Management Directors) each year after
that.102 Because FEMA has not implemented this change and proposes to do so through

Bureau of Labor Statistics, Occupational Employment Survey May 2019, SOC 11-9161 Emergency
Management Directors: mean hourly wage $33.81.
https://www.bls.gov/oes/2019/may/naics4_999200.htm#11-0000. Fully loaded wage rates include other
benefits. We are using a factor of 1.6 to calculate fully loaded wage rates. The unloaded wage rate does not
account for cost of benefits, such as health insurance, to the employer. Accessed July 29, 2020.
100 44 CFR 206.207.
101 56 States includes 50 states and 6 territories: the District of Columbia, and territories including
American Samoa, Guam, Northern Mariana Islands, Puerto Rico, and U.S. Virgin Islands. FEMA’s annual
estimate of 37 Tribes was based on the number of Tribes acting as recipients historically.
102 Bureau of Labor Statistics, Occupational Employment Survey May 2019, SOC 11-9161 Emergency
Management Directors: mean hourly wage $33.81.
https://www.bls.gov/oes/2019/may/naics4_999200.htm#11-0000 (accessed July 29, 2020). Fully loaded
this rule, the estimated annual cost of Change 13 is the same whether measured against
the no-action or pre-statutory baseline.
Change 14: Work Documentation relates to two PA documentation requirement
changes. First, FEMA proposes to adjust the time-period during which an applicant must
identify and report all disaster impacts included on project applications from a 60-day
time-period to within 90 calendar days following FEMA’s approval of the Request for
PA to ensure applicants have adequate time to identify and report the impacts. This
would be a change from the existing deadline, which is 60 days following the Recovery
Scoping Meeting with FEMA. FEMA expects this additional time for documentation
would not impose additional cost burden on applicants or FEMA.
Second, FEMA proposes to require applicants to submit all eligible work and
costs documentation within 30 calendar days following a site inspection or 120 calendar
days following FEMA’s approval of the Request for PA, whichever is later. There is no
current submission date for eligible work and costs documentation. FEMA used PA
project data from 2016 through 2019 to estimate the percentage of projects that met the
120 day proposed submission dates due to PA grants process and system changes prior to
2016. This period from 2016 through 2019 reflects the new grants delivery model103 and
new software applications, “PA Grants Manager” and “Grants Portal”104, used for all
stakeholders involved in the PA grant process since 2016. FEMA estimates that more
than 45 percent of completed work documentation are complete within 120 days of
FEMA’s approval of the Request for PA. FEMA expects the new requirement to submit

wage rates include other benefits, we are using a factor of 1.6 to calculate fully loaded wage rates. The
unloaded wage rate does not account for cost of benefits, such as health insurance, to the employer. FEMA
assumes the equivalent of a managerial position in State or local government would prepare Administrative
Plans, PWs, and other FEMA forms.
103 PA Delivery Model Fact Sheet, available at: https://www.fema.gov/sites/default/files/202007/fema_pa_delivery-model_factsheet.pdf (last accessed June 12, 2024).
104 PA Grant Manager and Grants Portal Fact Sheet, available at:
https://www.fema.gov/sites/default/files/2020-07/fema_pa_grants-manager-grants-protal-tool_factsheet.pdf
(last accessed June 12, 2024).

documentation within a certain timeframe would not impose an additional cost burden on
applicants because FEMA currently requires the documentation prior to obligating PA
funds and close to half of applicants meet the requirement voluntarily. FEMA expects all
applicants to meet the new documentation requirement as FEMA believes the lack of a
formal deadline is the reason for delays in submitting these documents. Additionally,
applicants may request documentation time extensions for extenuating circumstances as
needed consistent with the current practice for requesting extensions for project work
completion deadlines105. Accordingly, FEMA estimates the proposed changes to
documentation deadlines would not impose additional future cost burdens. Because
FEMA has not implemented this change and proposes to do so through this rule, this
estimated impact is the same whether measured against the no-action or pre-statutory
baseline.
Changes 4, 5, 7, 9, and 10 did not result in any additional costs post
implementation and FEMA does not expect additional costs in the future, as measured
against the pre-statutory baseline.
Change 4: CDL Program, The SAFE Port Act amended the Stafford Act by
increasing the amount that communities may receive in a community disaster loan from
no greater than 25 percent to no greater than 50 percent of their annual operating budgets
when revenue losses suffered are equal to greater than 75 percent of their operating
budget. FEMA implemented updated guidance in 2012 reflecting this CDL change.
FEMA estimated a pre-statutory baseline for total costs at no costs as CDLs above 25
percent were not possible prior to the change. From 2012-2019, FEMA did not have any
CDLs at the higher percent and FEMA estimated this change did not create additional
cost burdens. Additionally, documentation requirements are consistent for all CDLs

Federal Emergency Management Agency (June 1, 2020). Public Assistance Program and Policy Guide,
version 4, FEMA Policy 104-009-2, Work Completion Deadlines page 196,
https://www.fema.gov/sites/default/files/documents/fema_pappg-v4-updated-links_policy_6-1-2020.pdf.
meaning the change allows for higher loan amounts and does not impact recipient
documentation. The CDL program does not adjust the maximum loan amount of
$5,000,000 for inflation and as inflation increases prices and local government budgets
each year the probability of a CDL issued above 25 percent declines with each year.
Change 5: Debris Removal Pilot allowed straight-time labor costs to be eligible
for budgeted employees conducting debris removal activities. FEMA estimated the
Debris Pilot change did not create additional costs. The increase in eligibility for
budgeted employees conducting debris removal activities did not change reporting
requirements for debris removal projects, and therefore did not impact costs.
Changes 7 and 10: The definition of PNP was expanded to include Food Banks
(change 7) in 2017 and Center-Based Childcare Facilities (change 10) in 2018. FEMA
implemented these changes via PA guidance and proposes to codify them through this
rule. FEMA estimated that the additional cost for expanding eligibility to facilities that
collect, store, and distribute food to food banks and Center-Based Childcare facilities
were zero dollars because there were zero PA awards for these PNPs since they became
eligible. FEMA acknowledges that there may be PNPs that receive PA funding in the
future. However, due to the limited sample size, FEMA was unable to estimate the
number of these PNP projects impacted by these changes over the next 10-year period. If
such PNPs were to receive an award in the future, FEMA estimated potential future costs
of $495 ($478 recipient + $17 FEMA) per additional award.
Change 9: Alternate Project Funding, FEMA estimated the change to funding
limitations for alternate projects had no impact on total costs because it increases FEMA
portion of funding per project. FEMA has not received an increase in alternate projects
applications post implementation and FEMA does not expect this change to impact the
number of alternate projects in the future.

The proposed regulation would also result in familiarization costs (as detailed in
the above No-Action Baseline Section). FEMA estimates it would cost $49,264 for
applicants to familiarize themselves with the proposed rule under a no-action and prestatutory baseline. This would be a one-time cost for the applicants in the first year.
Under a pre-statutory baseline, FEMA estimates the total annual cost
undiscounted would be $8,379,882 for only the first year. The first year includes
calculations for familiarization costs. Then the total annual undiscounted cost would be
$8,310,493 for each year after that. The discounted total 10-year cost at 3 percent and 7
percent, respectively, would be $70,957,558 and $58,434,274. The annualized cost
would be $8,318,390 and $8,319,726 at the 3 and 7 percent discount rates (Table 6).
Table 6. Summary of Pre-Statutory Baseline Costs, Future 10-Year Period (2019$)
Year
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
Total
Annualized

FEMA Costs
$3,215
$3,215
$3,215
$3,215
$3,215
$3,215
$3,215
$3,215
$3,215
$3,215
$32,150

Recipient
Costs
$8,376,667
$8,307,278
$8,307,278
$8,307,278
$8,307,278
$8,307,278
$8,307,278
$8,307,278
$8,307,278
$8,307,278
$83,142,169

Total Costs
$8,379,882
$8,310,493
$8,310,493
$8,310,493
$8,310,493
$8,310,493
$8,310,493
$8,310,493
$8,310,493
$8,310,493
$83,174,319

Annual
Annual
Costs
Costs
Discounted Discounted
at 3%
at 7%
$8,135,808
$7,833,437
$7,605,278
$7,383,765
$7,168,704
$6,959,907
$6,757,191
$6,560,380
$6,369,301
$6,183,787
$70,957,558
$8,318,390

$7,831,665
$7,258,706
$6,783,838
$6,340,035
$5,925,267
$5,537,632
$5,175,357
$4,836,783
$4,520,358
$4,224,633
$58,434,274
$8,319,726

Benefits
All benefits associated with the proposed rule would be qualitative. The proposed
rule would improve clarity and align FEMA regulations with statutory changes and
current practices under a no-action and pre-statutory baseline. Although not quantified,
these changes would result in users better understanding the PA program. Such increased
clarity and understanding would improve the efficiency and consistency of
implementation of FEMA’s PA program.

The clearer FEMA regulations are, the faster and better applicants can understand
and correctly apply them, which in turn can speed disaster assistance to communities and
help them support survivors. This would be especially helpful when applicants bring on
new staff to States or localities that experience disasters infrequently need to familiarize
themselves with the program and its requirements. This increased efficiency allows both
applicants and FEMA to direct their energy and resources towards responding to and
recovering from the disaster or emergency. FEMA is unable to quantify this impact, but
it would be an important intended result of this proposed rule.
No-Action Baseline
Changes 1-11 have already been implemented. As discussed above, codifying
these changes would improve clarity by aligning FEMA regulations with statutory
changes and current practices. Benefits from newly proposed changes would include: (1)
Change 12: Reduced project delays related to legal consideration; (2) Change 13:
Keeping administrative plans up-to-date would provide additional staffing information
about prior disasters, helping recipients to be in a better position to respond to and
recover from emergencies and disasters; (3) Change 14: Increasing the impact
documentation date by 30 days earlier in the process would provide benefits by helping to
ensure applicants have adequate time to identify and report the impacts prior to the start
of the project benefitting both the applicant’s recovery and FEMA’s ability to assist with
their recovery, and FEMA expects the submission deadlines for eligible work and costs
documentation would set expectations early in the process and help timely closeout of
projects benefiting FEMA, recipients, and disaster-impacted communities.
Pre-Statutory Baseline
In this section, FEMA examines the benefits against a pre-statutory baseline.
FEMA has already implemented Changes 1-11; they provide the following benefits: (1)
Change 2: Expanded PA eligibility for the rescue, care, shelter, and essential needs of

household pets and service animals provides additional assistance to recipients allowing
them to more quickly address pet related needs during and after a damage; (2) Changes 1,
3, 6, 7, 8, and 10: The expanded definition of PNP to include rehabilitational facilities,
community and performing arts facilities, broadcasting facilities, food banks, houses of
worship, and center-based childcare facilities allows FEMA to consistently provide
additional assistance to such PNPs, which enables them to recover more quickly from a
disaster; (3) Change 4: CDL Program allows local governments to receive higher loans
amounts if they suffered extreme losses due to a disaster, which assists local governments
in recovering more quicky from extreme disaster losses; (4) Change 5: Debris Removal
Pilot allows straight-time labor costs to be eligible for budgeted employees conducting
debris removal activities, which increases the eligible supply of debris removal staff for
PA projects and increases recipient flexibility for debris removal; (5) Change 9: Alternate
Project Funding provides additional assistance consistent with standard project funding,
which allows communities greater flexibility when deciding which project type benefits
the communities more; and (6) Change 11: Codes and Standards requires the use of
consensus-based codes that incorporate hazard-resistant design for repairs, which
promotes resiliency and reduces risk of future repair and replacement of disaster damaged
facilities funded by PA. Facilities restored to a code that includes hazard-resistant
designs and criteria would experience fewer interruptions and less damage in the future
enabling those facilities to continue to function during and after a disaster. The benefits
from newly proposed Changes 12-14 would be reduced project delays related to legal
consideration, keeping administrative plans up-to-date and providing additional staffing
information, and increased clarity and adding more time early in the application process
for impact documentation.

Transfer Payments
Transfer payments are monetary payments from one group to another that do not
affect the total resources available to society.106 The grants FEMA provides to recipients
through PA are considered transfer payments because these are monetary payments from
FEMA to recipients do not affect the total resources available to society. In this analysis,
FEMA has analyzed the impact of this proposed rule on transfer payments.
No-Action Baseline
This rule will not result in any impacts to transfer payments under a no-action
baseline.
Pre-Statutory Baseline
In this section, FEMA examines the effects of the proposed changes on transfer
payments, as measured against a pre-statutory baseline. FEMA has already implemented
changes 1-11 and discusses their impacts on transfer payments: Change 2 authorized
assistance for the rescue, care, shelter, and essential needs of household pets and service
animals; Changes 1, 3, 6, 7, 8, and 10 expanded PNP eligibility; Change 4: CDL
Program; Change 5: Debris Removal Pilot; Change 9: Alternate Project Funding; and
Change 11: Codes and Standards.
Change 2: In 2006, FEMA was authorized to provide assistance for the rescue,
care, shelter, and essential needs of household pets and service animals. FEMA proposes
to codify this change in regulation. Before this change, such assistance was not eligible
under PA, and FEMA estimates the pre-statutory baseline at zero dollars. FEMA used
data from EDW database from 2006 through 2019 to estimate the assistance FEMA
provided for rescue, care, shelter, and essential needs of household pets and service
animal related assistance during this time period. FEMA estimates an average of 8

Office of Management and Budget, Circular A-4, Regulatory Analysis, September 17, 2003. Available
at https://www.reginfo.gov/public/jsp/Utilities/a-4.pdf.
awards per year for animal related essential assistance and an average award amount of
$73,808. In total, rescue, shelter, care, and essential needs of household pets and service
animal related assistance increased from zero to an average of $590,464 (8 projects ×
$73,808) per year in PA funding from FEMA to recipients.
Changes 1, 3, 6, 7, 8, and 10: FEMA was authorized to expand PA grant funding
eligibility for the following types of PNPs: rehabilitational facilities (in 1988),
community and performing arts facilities (in 2007), broadcasting facilities (in 2015), food
banks (in 2017), houses of worship (in 2017), and center-based childcare facilities (in
2017). FEMA proposes to codify these changes in regulation. To estimate the impacts of
these changes measured against a pre-statutory baseline, FEMA used PNP project data
from the EDW database for 2000-2019; however, impacts in many cases were estimated
with fewer than 10-years of data due to different dates of implementation. FEMA
estimates an average increase in transfer payments through PA funding from FEMA to
PNP recipients of $3,816,658 (rehabilitational facilities $1,126,114 + community and
performing arts $224,514 + broadcasting $344,235 + house of worships $2,121,795) per
year.
Change 9: In August 2017, the Disaster Recovery Reform Act (DRRA) amended
the Stafford Act to remove the 90 percent (75 percent for PNPs) alternate project funding
limit of the original project eligible Federal cost share amount. FEMA proposes to codify
these changes in regulation. Because this change was recently made and FEMA does not
have adequate data with the change in effect, FEMA estimated the impact of this change
against a pre-statutory baseline by using data pulled from EDW for PA alternate projects
from 2010 to 2019 and recalculating obligations for alternate projects at the full eligible
Federal cost share consistent with standard projects. FEMA does not believe this change
impacted the number of projects but rather just the funding source for those projects.
Accordingly, FEMA estimates the average annual number of affected projects over this

time period is 53. FEMA estimates that if this change had been in effect for the entire
2010 to 2019 period, the average annual obligation would have increased from $349,196
to $396,834 per project, and the average total obligation would have increased from
$18,507,388 ($349,196 x 53 projects) to $21,032,202 ($396,834 x 53 projects) per year.
FEMA estimates an increase of PA assistance from FEMA to PA recipients of
$2,524,814 ($21,032,202 - $18,507,388) per year for the removal of the alternate project
funding limit.
Change 5: Debris Pilot relates to the implementation of alternative debris removal
procedures through a pilot program starting on June 28, 2013. Before this pilot, FEMA
would only reimburse for debris removal costs for overtime labor of recipient budgeted
employees or debris removal costs for third-party contractors. The Debris Pilot allows
FEMA to reimburse recipients for straight-time labor costs for budgeted employees to
perform all or part of debris removal operations. FEMA used data from the EDW
database for Debris Pilot projects and those choosing to opt out of the Pilot (non-Pilot
projects) from 2013 through 2019 to estimate the baseline and impact of the pilot
program. The Pilot project data includes straight-time labor cost projects and other
contract projects to allow for comparison to the non-Pilot projects.107 This proposed
codification for the eligibility of recipient’s budgeted employee straight-time labor costs
is directly related to the Debris Pilot for straight-time labor and would not impact the
other contracts portion (such as overtime labor) of the Debris Pilot. During this period,
the average number of Debris Pilot projects was 501 per year, and the average Federal
obligation amount was $445,721 per project equaling an annual Federal obligation
amount of $223,306,221 ($445,721 x 501 Debris Pilot projects) per year.

Straight-time labor cost is the wage rate for budgeted employees during the standard workday or work
week.
For non-Pilot projects during this period, the average number of projects per year
was 514, and the average obligation amount was $473,328. Based on this information,
FEMA estimates that if the debris pilot had not been in place (the pre-statutory baseline)
total assistance for the 501 debris projects that did participate in the pilot would have
been $237,137,328 ($473,328 x 501 Debris Pilot projects) per year over this time period.
By using the non-Alternative Debris Removal project average obligation amount, FEMA
converted the Debris Pilot Removal projects into non-Pilot project estimates.
Next FEMA isolated the Debris Pilot straight-time labor portion from the Debris
Pilot other contract costs because this debris removal change would be specific to the
straight-time labor portion of the Debris Pilot. FEMA used the average straight-time
labor costs project obligation from 2013-2019 of $119,969,697 per year and the Pilot
project total obligations of $223,306,221 per year to estimate that 53.7 percent
($119,969,697 ÷ $223,306,221) of Debris Pilot obligations were for straight-time labor
cost projects. Because the other 46.3 percent of debris pilot obligations were for
overtime or contract costs, which were unaffected by this change, FEMA compares nonpilot to pilot costs for only the 53.7 percent of obligations affected by the rule. FEMA
applied this percentage to non-pilot obligations to calculate the amount in obligations
replaced by straight-time cost labor: $127,342,745 ($237,137,328 x 53.7 percent) per
year. FEMA considers this the baseline cost without the pilot. FEMA then took the
difference between the average straight-time labor costs for pilot obligations of
$119,969,697 per year and the baseline estimate $127,342,745 per year. FEMA
estimated a transfer payment decrease of $7,373,048 ($119,969,697 - $127,342,745) per
year due to implementation of the Debris Pilot.
Change 11: DRRA section 1235(b) defines the framework for consistent and
appropriate implementation of consensus-based codes, specifications, and standards
requirement for disaster-related repair, restoration, reconstruction, or replacement of

buildings, roads and bridges, electric power, potable water, and wastewater projects.
FEMA implemented this statutory change in 2019. Because this change was recently
made and these types of projects can take years to complete, FEMA does not have 10
years of data with the change in effect. Therefore, FEMA estimated the impact of this
change against a pre-statutory baseline by using data pulled from EDW from 2010
through 2018. During this time period, FEMA provided assistance for an average of
2,386 projects (PA categories: C – roads/bridges, E – buildings/equipment, F – utilities)
per year.
FEMA used Building Codes Adoption Tracking (BCAT) Regional reports108 to
identify projects in States with moderate to low hazard-resistant building code adoption
rates. FEMA expects the consensus-based codes and standards requirement would
impact projects in moderate to low hazard-resistant building code areas by applying more
stringent requirements than the local codes and standards. Based on the BCAT reports,
FEMA estimates the number of impacted projects from 2010 to 2018 was 1,313 projects
per year and the average annual amount for these projects was $819,485,316
($179,372,869 non-Federal share + $640,112,447 Federal share) per year. FEMA
estimated the average Federal cost share for PA project was 78 percent ($640,112,447
Federal share ÷ $819,485,316 total project amount). FEMA developed a project cost
increase range of 1 percent to 10 percent based on input from subject matter experts and
is in line with additional costs estimates of hazard-resistant building codes referenced in
the 2020 Building Codes Saves: A Nationwide Study and 2019 Natural Hazard
Mitigation Saves Report.109 This range of additional costs reflects the unknown

FEMA Building Code Adoption Tracking: Regions 1-10 Reports, 2023. A State or Territory is
classified as moderate or lower resistance when less than 75 percent of jurisdictions have not adopted
hazard-resistant building codes. Available at https://www.fema.gov/emergency-managers/riskmanagement/building-science/bcat/fact-sheets. Accessed May 2, 2023
109Building Codes Saves: A National Study, page 1-6, https://www.fema.gov/sites/default/files/202011/fema_building-codes-save_study.pdf. Accessed August 9, 2023. Additional reference, Natural Hazard
Mitigation Saves: 2019 Report, page 70, 126, 143, Additional construction cost estimates for flooding 1.7
variations between local codes and/or standards used and the consensus-based codes and
standard, and FEMA expects Change 11 would have limited impacts on projects costs
due to FEMA’s policy referencing multiple industry consensus-based codes and
standards that may be selected from to meet the requirement.110 Accordingly, for the
impacted 1,313 projects, FEMA estimated an increase in FEMA’s portion of the cost
share (transfer payments) of between an additional $6,391,985 ($819,485,316 × 1 percent
× 78 percent Federal share) and $63,919,855 ($819,485,316 × 10 percent × 78 percent
Federal share) per year in PA project costs for the consensus-based codes and standards
requirement. Due to the interim policy implementation in November 2019, little postimplementation data were available. For the primary estimate of this change under a prestatutory baseline, FEMA selected the lower estimate of $6,391,985 per year, due to the
change aligning with commonly used industry building standards.
Change 4: In 2012, FEMA released guidance that implemented changes by the
SAFE Port Act which increased the amount that communities may receive in a CDL by
allowing communities to receive up to 50% of their annual operating budgets if they
suffered a loss of tax or other revenue equal to or greater than 75% of their annual
operating budget in the fiscal year in which the disaster occurred, up to $5,000,000.111
FEMA proposes to codify this change in regulation. Prior to the 2012 guidance, loans
administered through the CDL program were not to exceed 25 percent of the operating
budget of the local government for the fiscal year in which the disaster occurred, not to
exceed $5,000,000.112 FEMA used CDL program data to analyze the effects of this

percent, hurricane 1 percent, and safe room wind 5 to 7 percent, respectively.
https://www.nibs.org/files/pdfs/NIBS_MMC_MitigationSaves_2019.pdf. Accessed August 9, 2023.
110 Appendix A: Consensus-Based Codes, Specifications and Standards, page 9-16. December 20, 2019.
https://www.fema.gov/sites/default/files/202005/DRRA1235b_Consensus_BasedCodes_Specifications_and_Standards_for_Public_Assistance122019.pd
f.
111 For more information, see Congressional Research Service, FEMA’s Community Disaster Loan (CDL)
Program: A Primer. July 13, 2020. https://crsreports.congress.gov/product/pdf/IF/IF11600.
112 FEMA places the approved amount of funds into account for use by the local government, which can be
drawn upon the loan at any point during the five-year loan period.

change against the pre-statutory baseline. CDL data was available from 2012 through
2019.113 During this period, zero loans were issued above 25 percent of the local
government’s operating budget. It is rare for a community to lose revenues up to 75
percent of an operating budget following a disaster, and therefore, local governments
would not often qualify for the higher loan amount. Additionally, the CDL program does
not adjust the maximum loan amount of $5,000,000 for inflation and as inflation
increases prices and local government budgets each year the probability of a CDL issued
above 25 percent declines with each year. Therefore, FEMA does not expect to issue a
CDL loan above 25 percent of the local government’s operating budget in the next 10
years.
Changes 7, 10, and 14 did not result in any additional transfer payments post
implementation and FEMA does not expect additional transfer payments in the future, as
measured against the pre-statutory baseline.
Change 7: Food Banks and Change 10: Center-Based Childcare Facilities, FEMA
estimated that expanding eligibility to facilities that collect, store, and distribute food to
food banks and Center-Based Childcare facilities did not result in any additional transfer
payments post implementation and FEMA does not expect additional transfer payments
in the future because there were zero PA awards for these PNPs. FEMA acknowledges
that there may be PNPs that receive PA funding in the future. However, due to the
limited sample size, FEMA was unable to estimate the number of these PNPs impacted
by these changes over the next 10-year period.
Change 14: Work Documentation, FEMA does not expect these documentation
changes to impact transfer payments. These changes alter when FEMA requires
documents from applicants. However, these changes do not change whether an applicant

There were zero CDLs issued in 2014.

is eligible to receive assistance. Additionally, FEMA expects all applicants to meet these
new documentation submission requirements.
For the pre-statutory baseline, FEMA estimates the net 10-year undiscounted
transfer payments from FEMA to applicants would be $59,508,730. The total 10-year
discounted transfer payments would be $50,762,154at a 3 percent discount rate and
$41,796,443at a 7 percent discount rate, with annualized transfer payments of $5,950,873
at both 3 and 7 percent discount rates (Table 7).
Table 7. Summary of Transfer Payments, Pre-Statutory Baseline, Future 10-Year Period
(2019$)
Year

Transfers from
FEMA to Recipients

Total
Transfers
Undiscounted

Annual
Transfers
Discounted at
3%

$5,950,873

$5,950,873

$5,777,547

$5,561,564

$5,950,873

$5,950,873

$5,609,269

$5,197,723

$5,950,873

$5,950,873

$5,445,892

$4,857,685

$5,950,873

$5,950,873

$5,287,274

$4,539,893

$5,950,873

$5,950,873

$5,133,275

$4,242,890

$5,950,873

$5,950,873

$4,983,762

$3,965,318

$5,950,873

$5,950,873

$4,838,604

$3,705,905

$5,950,873

$5,950,873

$4,697,674

$3,463,462

$5,950,873

$5,950,873

$4,560,849

$3,236,881

$5,950,873

$5,950,873

$4,428,008

$3,025,122

$59,508,730

$59,508,730

$50,762,154

$41,796,443

$5,950,873

$5,950,873

Total
Annualized

Annual
Transfers
Discounted at
7%

Table 8. Circular A-4 Accounting Statement, No-Action Baseline (2019$), 2020-2029
Category

3 Percent Discount Rate

7 Percent Discount Rate

Annualized Monetized

N/A

N/A

Annualized quantified, but
unmonetized benefits

N/A

N/A

Source Citation

BENEFITS

•
•
Qualitative (unquantified)
benefits

•
•

Improving clarity and aligning FEMA regulations with statutory changes and current
practices and procedures.
Identifying legal considerations early in the application process would allow for more
complete alternate project review.
Increasing clarity and adding more time early in the application process for work
documentation.
Keeping administrative plans up-to-date and providing additional staffing information about
prior disasters helping recipients be in a better position to respond to and recover from
emergencies and disasters.

RIA Section 9

COSTS
Annualized Monetized
Annualized quantified, but
unmonetized, costs
Qualitative (unquantified)
costs
TRANSFERS
Annualized Monetized

Effects on small businesses

$30,792

N/A

N/A

RIA Section 8

N/A
$0

From/To
Category
Effects on State, local,
and/or Tribal governments

$29,457

$0

RIA Section 11

Effects

Source Citation

•

Establishing additional requirements for Administrative Plans, alternate project legal
consideration identification, and application work documentation.

RIA

•

Codifying the Expansion of Federal assistance to specific types of facilities does not impact
the number of small entities to receive aid from FEMA. In an average year, FEMA approves
28,721 PA projects and of those, FEMA estimated small entities to account for 19,818
projects.

Regulatory
Flexibility Act

Effects on wages

None

N/A

Effects on growth

None

N/A

Table 9. Circular A-4 Accounting Statement, Pre-Statutory Baseline (2019$), 2000-2029

Category
BENEFITS
Annualized Monetized
Annualized quantified,
but unmonetized benefits
•
•
•
•
Qualitative
(unquantified) benefits

•
•
•
•

3 Percent Discount Rate

7 Percent Discount Rate

N/A

N/A

N/A

N/A

Expanding PA eligibility for certain types of PNPs and allowing FEMA to consistently
provide additional assistance to such PNPs to allow them to recover more quickly from
disaster-damage.
Increasing recipient flexibility when determining whether the community would benefit more
from facility restoration or an alternate project.
Increasing flexibility for debris removal projects by allowing FEMA to reimburse base and
overtime wages for the employees of State, Tribal, or local governments.
Improving clarity and aligning FEMA regulations with statutory changes and current
practices and procedures.
Promoting resiliency and reducing future damage risk of repaired facilities with consensusbased codes and standards requirement for PA funded projects.
Identifying legal considerations early in the application process would allow for more
complete alternate project review.
Increasing clarity and adding more time early in the application process for work
documentation.
Keeping administrative plans up-to-date and providing additional staffing information about
prior disasters would help recipients be in a better position to respond to and recover from
emergencies and disasters.

Source Citation

RIA Section 10

COSTS
Annualized Monetized
Annualized quantified,
but unmonetized, costs
Qualitative
(unquantified) costs
TRANSFERS
Annualized Monetized
From/To
Category

$1,233,307

N/A

N/A

RIA Section 9

N/A

•
•

Effects on State, local,
and/or Tribal governments

$2,021,806

•

$739,294
-$139,749
Increasing transfers from FEMA to PA recipients.
Effects
Increasing PA eligibility of private non-profit organizations, more flexibility with alternate
projects and debris removal projects, and additional requirements for Administrative Plan
should better position communities for emergencies and disasters.
Establishing additional requirements for Administrative Plans, alternate project legal
consideration identification, and application work documentation.

RIA Section 11
Source Citation

RIA

•
Effects on small
businesses
Effects on wages
Effects on growth

Expanding Federal assistance through increasing the types of facilities eligible for PA
increases the opportunity for small entities to receive aid from FEMA. In an average year,
FEMA approves 28,721 PA projects and of those, FEMA estimated small entities to account
for 19,818 projects.
None
None

Regulatory
Flexibility Act
N/A
N/A

B. Regulatory Flexibility Act
The Regulatory Flexibility Act of 1980 (5 U.S.C. 601 et seq.), as amended,
requires agency review of proposed and final rules to assess their impact on small
entities. When an agency promulgates a notice of proposed rulemaking under 5 U.S.C.
553, the agency must prepare an initial regulatory flexibility analysis (IRFA) unless it
determines and certifies pursuant to 5 U.S.C. 605(b) that the rule, if promulgated, would
not have a significant impact on a substantial number of small entities. As set forth
below, this proposed rule would not have a significant impact on a substantial number of
small entities. However, FEMA is publishing this IRFA to aid the public in commenting
on the potential impacts of the proposed requirements in this NPRM on small entities.
FEMA invites all interested parties to submit data and information regarding the potential
economic impact on small entities that would result from the adoption of this NPRM.
FEMA will consider all comments received in the public comment process when making
a final determination.
FEMA prepared this IRFA to examine the impacts of the proposed rule on small
entities. A small entity is: a small business (a business that is independently owned and
operated and is not dominant in its field); a small not-for-profit organization (any not-forprofit enterprise that is independently owned and operated and is not dominant in its
field); or a small governmental jurisdiction (locality with fewer than 50,000 people). See
5 U.S.C. 601(3)-(6); see also 15 U.S.C. 632.
1. A Description of the Reasons why Action by the Agency is being Considered
FEMA initiated this rulemaking to codify legislative requirements included in
several Federal statutes that have amended sections of the Stafford Act, but not yet been
incorporated by FEMA into its regulations. The rule also proposes revisions to improve
program administration.

The Stafford Act authorizes the President to provide Federal assistance when the
severity and magnitude of an incident or threatened incident exceeds the affected State,
Territorial, Indian Tribal, or local government’s capabilities to effectively respond or
recover. If an emergency or major disaster is declared, FEMA may award Public
Assistance grants to assist State, Territorial, Indian Tribal, and local governments and
certain PNP organizations so communities can quickly respond to and recover from the
emergency or major disaster.
The Public Assistance program provides a range of assistance, including direct
services and financial assistance for emergency protective measures, such as emergency
evacuation, sheltering, and debris removal, as well as financial assistance for the
permanent restoration of facilities. In addition, the Stafford Act authorizes CDLs for any
local government that has suffered a substantial loss of tax and other revenues as a result
of a major disaster, and that demonstrates a need for financial assistance to perform its
governmental functions.
2. A Succinct Statement of the Objectives of, and Legal Basis for, the Proposed
Rule
FEMA proposes to amend its Public Assistance and CDL program regulations to
incorporate various amendments to the Stafford Act and to improve program
administration. Section 701 of the Stafford Act, 42 U.S.C. 5201, provides for rulemaking
authority to implement the provisions of the Act, and the Secretary delegated this
authority to FEMA in Department of Homeland Security Delegation 9001.1. The Federal
statutes that have amended the Stafford Act but that FEMA has yet to fully incorporate
into FEMA’s regulations include the Post-Katrina Emergency Management Reform Act
of 2006 (PKEMRA), the Security and Accountability for Every Port Act of 2006 (SAFE
Port Act), the Pets Evacuation and Transportation Standards Act of 2006 (PETS Act), the
Sandy Recovery Improvement Act of 2013 (SRIA), the Emergency Information

Improvement Act of 2015, the Bipartisan Budget Act of 2018, and the Disaster Recovery
Reform Act (DRRA).
3. A Description—and, Where Feasible, an Estimate of the Number—of Small
Entities to which the Proposed Rule will Apply
The proposed rule would directly affect all eligible Public Assistance recipients.
Amendments to the Stafford Act affect recipients that are small governmental
jurisdictions with a population of less than 50,000, as defined at 5 U.S.C. 601(5), and
PNPs that meet the small entity size standards set by the SBA.114 To estimate the effects
of this proposed rule on small entities, FEMA identified the affected population and
analyzed how the changes would affect those recipients and subrecipients based on a
random sample. Using those results, FEMA then evaluated which recipients and
subrecipients qualified as “small entities.” Eligible Public Assistance recipients may
include States, U.S. Territories, and Indian Tribal governments; subrecipients may
include cities, counties, towns, townships, villages, school districts, special districts, or
PNPs. FEMA removed from this analysis any recipients that are States and U.S.
Territories because they have populations greater than 50,000. FEMA also removed any
Indian Tribal governments because they are not included in the definition of a small
entity. The remaining recipients were either PNPs, local governments, or governmental
organizations.
Alternate Project Legal Considerations
FEMA proposes to add a requirement for alternate projects that the recipient must
identify any “other legal considerations,” such as liens on property, ownership issues, or
zoning concerns. FEMA assumes the recipient’s burden to identify other legal
considerations would be comparable to that of identifying the issues required under the
Information on population sizes was obtained using the U.S. Census Bureau’s City and Town
Population Totals: 2010-2019. Available at https://www.census.gov/data/tables/timeseries/demo/popest/2010s-total-cities-and-towns.html. Small Business Administration, “Table of Size
Standards” (.xlxs). Available at https://www.sba.gov/document/support--table-size-standards. Revenue
and employment information for individual PNP’s was obtained from PNP websites.
current regulations,115 such as floodplain management and insurance considerations, as
they are similar in nature. FEMA estimates the burden associated with identifying
floodplain management and insurance considerations to be 0.5 hours,116 with an hourly
wage rate of $54.10.117 Each year, FEMA funds an average of 53 alternate projects. For
comparison, in an average year FEMA approves 28,721 projects in total.118
To determine the number of small entities that would be affected by this proposed
change, FEMA selected a random sample of 85 projects out of the 527 alternate projects
from 2010 through 2019.119 FEMA identified 51 recipients (60 percent) that met the
definition of a small entity based on the population size of local governments (less than
50,000 population), or PNPs based on size standards set by the SBA.120 Each of those
small entities, if they are not already identifying legal considerations for alternate
projects, would see an increased burden of $27.05.121 In an average year, FEMA
approves 53 alternate projects, and 32 (60 percent of 53) projects are estimated to be for
small entities.122

See 44 CFR 203(d)(2)(v).
See Information Collection Request 202208-1660-001, Special Considerations Questions Form 009-0120, https://www.reginfo.gov/public/do/PRAViewICR?ref_nbr=202208-1660-001. Until recently,
information about floodplain management and insurance considerations was captured on Special
Considerations Questions Form 009-0-120, with an estimated hour burden of 0.5 hours per response. Now,
FEMA has consolidated the collection of floodplain management and insurance considerations information
on different forms that also ask for other information. See Information Collection Request 202212-1660015, https://www.reginfo.gov/public/do/PRAViewICR?ref_nbr=202212-1660-015.
117 Bureau of Labor Statistics. Occupational Employment Survey May 2019, SOC 11-9161 Emergency
Management Directors: mean hourly wage $33.81. Retrieved from:
https://www.bls.gov/oes/2019/may/naics4_999200.htm#11-0000. Accessed December 2020.
Fully loaded wage rates include other benefits, using a factor of 1.6 to calculate fully loaded wage rates.
The unloaded wage rate does not account for cost of benefits, such as health insurance, to the employer.
FEMA assumes the equivalent of a managerial position in State or local government would prepare
Administrative Plans, PWs, and other FEMA forms. Fully loaded Emergency Management Directors
salary paid is $33.81 x 1.6 = $54.10
118 A more fulsome discussion of the assumptions used here may be found in the RIA accompanying this
proposed rule.
119 FEMA used Slovin’s formula and a 90 percent confidence interval to determine the sample size.
Slovin’s formula is n = N/(1+N*e^2). Therefore, 527 / (1 + 527 x 0.1^2) = 85 (rounded).
120 Small Business Administration. “Table of Size Standards.” Available at
https://www.sba.gov/document/support--table-size-standards. Revenue and employment information for
individual PNPs was researched using publicly available data sources, such the PNP website.
121 $27.05 = 0.5 x $54.10
122 12,063 = 28,721 x 42%
115
FEMA meets with the recipient and applicants for a kickoff meeting. The kickoff
meeting is to address the specific needs of each eligible applicant. Currently, the
recipient and FEMA discuss a variety of topics including documentation requirements,
and the applicants may ask questions relating to project formulation, insurance
requirements, eligibility criteria for work and costs, and required documentation. This is
an opportunity for the applicants to receive guidance from FEMA and the recipient. This
is particularly important for those small entities who may not have an in-house expert.
Although requiring applicants to identify legal requirements relevant to alternate
projects would impose a new burden on small entities, identifying legal issues early in the
project formulation phase is critical to FEMA in determining whether the project should
be approved, or whether the legal issues will be prohibitive. Accordingly, this change
could save applicants from beginning a project only to be halted before completion.
FEMA estimates that This change would impose a burden of $27.05 on 32 small entities
annually.
State and Tribal Administrative Plans
Currently, all recipients are required to file an administrative plan with FEMA.123
This requirement includes States, as well as Indian Tribal governments when they choose
to act as a recipient. Accordingly, this burden would affect States and Indian Tribal
governments, which are not small entities as defined by the Regulatory Flexibility Act.
Therefore, this proposed change would not impact any small entities.
Clarifications & Other Minor Changes
Many of the changes proposed in this rule are clarifications or codifications of
current policies, practices, and regulations. This means their only impact would be to
increase the applicants’ understanding of current processes. There would be no new
transfers or costs associated with these changes. Clearer FEMA regulations can speed

See 44 CFR 206.207.

disaster assistance to communities and help them support survivors. This would be
especially helpful to applicants that have brought on new staff or to localities that
experience disasters infrequently who need to re-familiarize themselves with the program
and its requirements. This increased efficiency would allow both applicants and FEMA
to direct their energy and resources towards responding to and recovering from the
disaster or emergency. Small entities may find these clarifications particularly useful, as
they are less likely to have in-house experts.
These changes would not have a significant economic impact even though the
number of small entities impacted could be substantial. To determine the number of
small entities affected by these proposed changes, FEMA selected a random sample of
100 projects from 287,214 unique Public Assistance projects from 2010 through 2019.124
FEMA gathered information about each sampled entity using publicly available
information from the U.S. Census Bureau and online small business directories (e.g.,
Dunn and Bradstreet, Manta.com). FEMA determined that 69 out of the 100 recipients
(69 percent) met the definition of a small entity based on the population size of local
governments (less than 50,000 population), or PNPs based on size standards set by the
SBA.125 FEMA identified 61 small entity recipients as local governments and identified
8 small entity recipients as PNPs. In an average year, FEMA approves 28,721 Public
Assistance projects and of those, FEMA accordingly estimated small entities to account
for 19,818 projects.
4. A Description of the Projected Reporting, Record Keeping, and other
Compliance Requirements of the Proposed Rule, including an Estimate of the
Classes of Small Entities that will be Subject to the Requirements and the Types
of Professional Skills Necessary for Preparation of the Report or Record

FEMA used Slovin’s formula and a 90 percent confidence interval to determine the sample size.
Slovin’s formula: n = N/(1+N*e^2). Therefore, 287,214 / (1 + 287,214 x 0.1^2) = 100 (rounded).
125 See 13 CFR 121.201.
FEMA proposes to revise its Public Assistance program regulations to reflect
current statutory authorities and implement program improvements. The proposed
programmatic revisions to the collection of information include reporting alternate
project legal consideration; adding deadlines for submitting certain supporting
documentation and closeout certifications for project worksheets; and in the list of
procedures that must be included in a State/Tribal Administrative Plan, adding
requirements that recipients include timely closeout procedures and address staffing plans
when updating their Administrative Plans. FEMA believes the professional skills typical
of a person in an Emergency Management Director position are best suited for the
preparation of the reports, forms, and other documentation.
5. An identification, to the Extent Practicable, of all Relevant Federal Rules that
may Duplicate, Overlap, or Conflict with the Proposed Rule
There are no relevant Federal rules that may duplicate, overlap, or conflict with
this proposed rule.
6. A Description of Significant Alternatives to the Rule which Accomplish the
Stated Objectives of Applicable Statutes and which Minimize any Significant
Economic Impact of the Proposed Rule on Small Entities
FEMA proposes to revise its Public Assistance program regulations to reflect
current statutory authorities and implement program improvements. As such, FEMA was
unable to consider alternatives to the proposed rule that would minimize economic
impact on small entities. However, FEMA is interested in the potential impacts of the
proposed rule on small entities and requests public comment on these potential impacts.
If you think that this rule would have a significant economic impact on you, your
business, or your organization, please submit a comment to the docket as directed under
the ADDRESSES caption, above. In your comment, explain why, how, and to what
degree you think this rule would have an economic impact on you. FEMA will consider
all comments received in the public comment process.

C. Unfunded Mandates Reform Act of 1995
Pursuant to section 201 of the Unfunded Mandates Reform Act of 1995 (Pub. L.
104-4, 2 U.S.C. 1531), each Federal agency “shall, unless otherwise prohibited by law,
assess the effects of Federal regulatory actions on State, local, and tribal governments,
and the private sector (other than to the extent that such regulations incorporate
requirements specifically set forth in law).” Section 202 of the Act (2 U.S.C. 1532)
further requires that the agency shall prepare a written statement detailing the effect on
State, local, and tribal governments and the private sector before promulgating, inter alia,
any proposed rule that is likely to result in the promulgation of any rule that includes any
Federal mandate that may result in expenditure by State, local, and tribal governments, in
the aggregate, or by the private sector, of $100 million or more (adjusted annually for
inflation) in any one year. FEMA has determined, however, that it does not need to
prepare an assessment for this proposed rule because it meets the criteria set forth in 2
U.S.C. 1503(4), which states, “This chapter shall not apply to . . . any provision in a
proposed or final Federal regulation that . . . provides for emergency assistance or relief
at the request of any State, local, or tribal government or any official of a State, local, or
tribal government.” Additionally, FEMA estimates this rule would not have an economic
impact of $100 million or more in any one year. Therefore, no actions are deemed
necessary under the provisions of the Unfunded Mandates Reform Act of 1995.
D. National Environmental Policy Act
The National Environmental Policy Act of 1969 (NEPA), 83 Stat. 852 (Jan. 1,
1970, as amended June 3, 2023, by the Fiscal Responsibility Act) (42 U.S.C. 4321 et
seq.) requires Federal agencies to consider the effects of their major proposed actions on
the quality of the human environment. The Council on Environmental Quality’s
procedures for implementing NEPA, 40 CFR parts 1500 through 1508, require Federal
agencies to prepare Environmental Impact Statements (EISs) for major Federal actions

significantly affecting the quality of the human environment. Each agency can develop
and use categorical exclusions (CATEXs) to cover major Federal actions that have been
demonstrated to not typically trigger significant effects to the human environment. If an
action does not qualify for a CATEX and has the potential to significantly affect the
environment, Federal agencies develop environmental assessments (EAs) to evaluate
those actions. At the end of the EA process, the agency will determine whether to make a
Finding of No Significant Impact (FONSI) or whether to initiate the EIS process.
A major Federal action may be categorically excluded under a Federal agency’s
NEPA procedures if it fits one of the approved exclusion categories and there are no
extraordinary circumstances.126 40 CFR 1501.4, 1507.3. This proposed rule falls within
the scope of the U.S. Department of Homeland Security List of CATEXs, A3(b), (c), and
(d).127 In the instant rulemaking, proposed changes would (a) implement, without
substantive change, statutory or regulatory requirements; (b) implement, without
substantive change, procedures, manuals, and other guidance documents; or (c) interpret
or amend an existing regulation without changing its environmental effect. The proposed
changes are intended to clarify current policy and improve the administration of the
Public Assistance program. The regulatory revisions in this proposed rule would have no
significant effect on the human environment, are categorically excluded consistent with
DHS procedure and NEPA regulations, and FEMA has not identified any extraordinary
circumstances. Therefore, this rule does not require the preparation of either an EA or an
EIS as defined by NEPA.128

A determination of whether an action that is normally excluded requires additional evaluation because
of extraordinary circumstances, focuses on the action’s potential effects and considers the environmental
significance of those effects in terms of both context and intensity. See Department of Homeland Security
Instruction Manual 023–01–001–01, Revision 01, Implementation of the National Environmental Policy
Act, at V-5 to V-6 (Nov. 6, 2014),
https://www.dhs.gov/sites/default/files/publications/DHS_Instruction%20Manual%20023-01-00101%20Rev%2001_508%20Admin%20Rev.pdf.
127 Id. at A-1 to A-2.
128 See Id. at V-4 to V-6.
E. National Historic Preservation Act of 1966
The National Historic Preservation Act (NHPA) (54 U.S.C. 300101, formerly 16
U.S.C. 470) was enacted in 1966, with various amendments throughout the years.
Section 106 of the NHPA (54 U.S.C. 306108) requires Federal agencies to consider the
effects of their actions, referred to as an “undertaking,” on any historic property listed, or
eligible for listing, on the National Register of Historic Places. Section 106 requires
Federal agencies to consult with any other Federal agencies, State, local, and Tribal
governments, and members of the public who have an interest in the effects of the
undertaking. Section 106 mandates the consultation process in the early stages of project
planning and that Federal agencies complete it prior to the approval of expenditure of any
Federal funds for the undertaking. Subpart B of 36 CFR part 800 lays out a 4-step
section 106 process to fulfill this obligation: (1) initiate the process (800.3); (2) identify
historic properties (800.4); (3) assess adverse effects (800.5); and (4) resolve adverse
effects (800.6).
The proposed rule would revise the Public Assistance regulations to reflect
current statutory authority and make improvements to the administration of the Public
Assistance program. Pursuant to section 106 of the National Historic Preservation Act
and its implementing regulations at 36 CFR part 800, FEMA has determined that this
rulemaking does not have the potential to cause effects to historic properties. In
accordance with 36 CFR part 800.3(a)(1), FEMA has no further obligations under section
106.
When FEMA undertakes specific actions that may affect historic properties,
FEMA follows the procedures set forth in 36 CFR part 800 to ensure compliance with
this law. These procedures include a specific, four-step process for determining effects to
historic properties. With few exceptions (such as emergencies) and as set forth in
applicable statutes or regulations, FEMA must complete reviews for compliance before

FEMA approves funding and starts work. The proposed rule would not change this
process.
F. Endangered Species Act
The Endangered Species Act (ESA), 16 U.S.C. 1531 et seq., mandates that
Federal agencies determine whether their proposed actions may affect listed species
and/or their designated critical habitat (critical habitat has been designated for some, but
not all listed species). Without authorization or exemption from Federal resource
agencies, it is unlawful for any person, whether government employee or private citizen,
to take listed animal species, or remove, damage, or destroy (among other actions) an
endangered plant species.129
To comply with section 7(a)(2) of the ESA, for every action that FEMA proposes
to carry out, fund, or authorize, FEMA must first determine if listed species and their
designated critical habitat are present in the action area. If species are present in the
action area, then FEMA must make one of the following determinations with respect to
the effect of the proposed action on listed species and critical habitat: (1) no effect (NE);
(2) may affect, but is not likely to adversely affect (NLAA); or (3) may affect and is
likely to adversely affect (LAA).
The proposed rule would revise the Public Assistance regulations to reflect
current statutory authority and make improvements to the administration of the Public
Assistance program. This rulemaking has been evaluated by FEMA, and due to its
administrative nature, FEMA has determined the rulemaking does not have the potential
to affect federally listed species or designated critical habitat. As such, FEMA has made
a No Effect determination for this activity. Per the ESA regulations, FEMA is not

16 U.S.C. 1538, 1539.

required to notify, and to consult with, the U.S. Fish and Wildlife Service and/or the
National Marine Fisheries Service for activities with a No Effect determination.130
When FEMA undertakes specific actions that may affect listed species and their
designated critical habitat, FEMA follows the procedures set forth in section 7(a)(2) to
ensure compliance with this law. These procedures include a process for determining the
effect of the proposed action on listed species and critical habitat. With few exceptions
(such as emergencies) and as set forth in applicable statutes or regulations, FEMA must
complete reviews for compliance before FEMA approves funding and starts work. The
proposed rule would not change this process.131
G. Paperwork Reduction Act of 1995
Under the Paperwork Reduction Act of 1995 (PRA), as amended, 44 U.S.C.
3501-3520, an agency may not conduct or sponsor, and a person is not required to
respond to, a collection of information unless agency obtains approval from the Office of
Management and Budget (OMB) for the collection and the collection displays a valid
OMB control number.
In this proposed rule, FEMA is seeking a revision to an existing collection of
information: OMB Control Number 1660-0017. This proposed rule serves as the 60-day
comment period for this collection pursuant to 5 CFR 1320.12. FEMA invites the
general public to comment on the proposed collection of information.
The proposed programmatic revisions to this collection of information are adding
a requirement for respondents to identify legal considerations; in the list of procedures
that must be included in a State/Tribal Administrative Plan, replacing management costs
procedures with timely closeout procedures; adding a requirement that recipients address
staffing plans when updating their Administrative Plans; and accounting for Tribal

130
See 50 CFR 402.13, 402.14.
50 CFR 402.13, 402.14.

respondents for the Administrative Plan. FEMA estimates that these revisions will
increase the annual cost to respondents by $23,572 and increase annual burden hours by
436 hours.
Collection of Information
Title: Public Assistance Program.
Type of Information Collection: Revision of a currently approved information
collection.
OMB Number: 1660-0017.
Form Titles and Numbers: FEMA Form FF-104-FY-21-131 (formerly 009-0-49),
Request for Public Assistance; FEMA Form FF-104-FY-21-132 (formerly 009-0-111),
Quarterly Progress Reports; FEMA Form FF-104-FY-21-137 (formerly 009-0-123),
Force Account Labor Summary Record; FEMA Form FF-104-FY-21-138 (formerly 0090-124), Materials Summary Record; FEMA Form FF-104-FY-21-139 (formerly 009-0125), Rented Equipment Summary; FEMA Form FF-104-FY-21-140 (formerly 009-0126), Contract Work Summary; FEMA Form FF-104-FY-21-141 (formerly 009-0-127),
Force Account Equipment Summary Record; FEMA Form FF-104-FY-21-135 (formerly
009-0-128), Applicant’s Benefits Calculation Worksheet; FEMA Form FF-104-FY-21145 (formerly FF 009-0-141), FAC-TRAX System; FEMA Template FT-104-FY-21-100,
Equitable COVID-19 Response and Recovery: Vaccine Administration Information;
FEMA Form FF-104-FY-22-233, Organization Profile; FEMA Form FF-104-FY-22-234,
Recipient Incident Information; FEMA Form FF-104-FY-22-235, Applicant Impact
Survey; FEMA Form FF-104-FY-22-238, Pre-Approval Request; FEMA Form FF-104FY-22-236, Impact List; FEMA Form FF-104-FY-22-239, Project Application for Debris
Removal; FEMA Form FF-104-FY-22-240, Project Application for Emergency
Protective Measures; FEMA Form FF-104-FY-22-242, Project Application for
Infrastructure Restoration; FEMA Form FF-104-FY-22-243, Project Application for

Building Code and Floodplain Administration and Enforcement; FEMA Form FF-104FY-22-244, Project Application for Management Costs; FEMA Form FF-104-FY-22245, Damage Information; FEMA Form FF-104-FY-22-246, Environmental and Historic
Preservation Addendum; FEMA Form FF-104-FY-22-247, Hazard Mitigation
Addendum; FEMA Form FF-104-FY-22-241, Project Application for COVID-19; FEMA
Form FF-104-FY-22-237, Donated Labor Sign-in; FEMA Form FF-104-FY-21-250,
Tribal Administrative Plan; FEMA Form FF-104-FY-22-248, Time Extension; and
FEMA Form FF-104-FY-22-249, State Administrative Plan.
Abstract: The information collected is utilized by FEMA to make determinations
for Public Assistance awards based on the information supplied by the respondents.
Affected Public: State, Local, or Tribal Government
Number of Respondents: 1,505
Number of Responses: 635,269
Estimated Total Annual Burden Hours: 341,635 hours.

Type of
Respondent
Applicant

Applicant

Applicant

Applicant

Form Name /
Form No.
Applicant Impact
Survey FEMA
Form FF-104-FY22-235
Applicant’s
Benefits
Calculation
Worksheet FEMA
Form FF-104-FY21-135 (formerly
009-0-128)
Contract
Information
FEMA Form FF104-FY-21140(formerly 0090-126)
Damage
Information
FEMA Form FF104-FY-22-245

Estimated Annualized Burden Hours and Costs
No. of
Avg.
Responses
Total No. Burden per
No. of
per
of
Response
Respondents Respondent Responses
(in hours)

Total
Annual
Burden (in
hours)

Avg.
Hourly
Wage
Rate

Total
Annual
Respondent
Cost

1,000

60,000

0.1167

7,002

$57.96

$405,836

32

1,920

0.5

$57.96

$55,642

100

6,000

0.1833

1,100

$57.96

$63,756

1,200

72,000

1.25

90,000

$57.96

$5,216,400

Type of
Respondent
Applicant

Form Name /
Form No.
Donated Labor
Sign-in FEMA
Form FF-104-FY22-237
Environmental
and Historic
Preservation
Information
Addendum*
FEMA Form FF104-FY-22-246
Equitable Vaccine
Administration
Information
Submission
Template FEMA
Template FT-104FY-21-100
FAC-TRAX
System FEMA
Form FF-104-FY21-145 (formerly
FF 009-0-141)
Force Account
Equipment
Summary FEMA
Form FF-104-FY21-141 (formerly
009-0-127)
Force Account
Labor Summary
Record FEMA
Form FF-104-FY21-137(formerly
009-0-127)

Estimated Annualized Burden Hours and Costs
No. of
Avg.
Responses
Total No. Burden per
No. of
per
of
Response
Respondents Respondent Responses
(in hours)

Total
Annual
Burden (in
hours)

Avg.
Hourly
Wage
Rate

Total
Annual
Respondent
Cost

10

0.0667

$57.96

$2,318

0

0

$0

$0

228

13,680

0.5

6,840

$57.96

$396,446

0

0

$0

$0

32

1,920

0.25

$57.96

$27,821

32

1,920

0.5

$57.96

$55,642

Applicant

Hazard Mitigation
Addendum*
FEMA Form FF104-FY-22-247

0

0

$0

$0

Applicant

Impact List
FEMA Form FF104-FY-22-236

1,000

60,000

0.5

30,000

$57.96

$1,738,800

Applicant

Materials and
Summary Record
FEMA Form FF104-FY-21138(formerly 0090-124)

32

1,920

0.25

$57.96

$27,821

Recipient/

Organization
Profile FEMA
Form FF-104-FY22-233

1,000

60,000

0.3

18,000

$57.96

$1,043,280

Applicant

Applicant

Recipient/

Applicant

Applicant

Type of
Respondent

Form Name /
Form No.

Applicant

Pre-Approval
Request FEMA
Form FF-104-FY22-238

Applicant

Applicant

Applicant

Applicant

Applicant

Applicant

Applicant

Recipient

Applicant

Project
Application for
Building Code
and Floodplain
Management and
Enforcement
FEMA Form FF104-FY-22-243
Project
Application for
COVID-19
FEMA Form FF104-FY-22-241
Project
Application for
Debris Removal
FEMA Form FF104-FY-22-239
Project
Application for
Emergency
Protective
Measures FEMA
Form FF-104-FY22-240
Project
Application for
Infrastructure
Restoration
FEMA Form FF104-FY-22-242
Project
Application for
Management
Costs FEMA
Form FF-104-FY22-244
Quarterly
Progress Report
FEMA Form FF104-FY-21132(formerly 0090-111)
Recipient Incident
Information
FEMA Form FF104-FY-22-234
Rented
Equipment
Summary Record
FEMA Form FF104-FY-21-139

Estimated Annualized Burden Hours and Costs
No. of
Avg.
Responses
Total No. Burden per
No. of
per
of
Response
Respondents Respondent Responses
(in hours)

Total
Annual
Burden (in
hours)

Avg.
Hourly
Wage
Rate

Total
Annual
Respondent
Cost

500

30,000

0.5

15,000

$57.96

$869,400

5

0.2333

$57.96

$4,057

50

3,000

0.3667

1,100

$57.96

$63,756

1,000

60,000

0.75

45,000

$57.96

$2,608,200

1,000

60,000

0.75

45,000

$57.96

$2,608,200

1,200

72,000

0.75

54,000

$57.96

$3,129,840

1,000

60,000

0.2167

13,002

$57.96

$753,596

4

0.6

$57.96

$8,346

1

0.0833

$57.96

$290

32

1,920

0.5

$57.96

$55,642

Type of
Respondent

Applicant

Form Name /
Form No.
(formerly 009-0125)
Request for
Appeals or
Arbitrations &
Recommendations
/ No Form
Request for
Appeals or
Arbitrations &
Recommendations
from Hurricanes
Katrina or Rita /
No Form
Request for Public
Assistance FEMA
Form FF-104-FY21-131 (formerly
009-0-49)
State/Territory
Administrative
Plan FEMA Form
FF-104-FY-22249

Estimated Annualized Burden Hours and Costs
No. of
Avg.
Responses
Total No. Burden per
No. of
per
of
Response
Respondents Respondent Responses
(in hours)

Total
Annual
Burden (in
hours)

Avg.
Hourly
Wage
Rate

Total
Annual
Respondent
Cost

9

3

1,512

$57.96

$87,636

5

3

$57.96

$3,478

1,000

60,000

0.1167

7,002

$57.96

$405,836

1

0.6

$57.96

$2,087

Applicant

Time Extension
Request FEMA
Form FF-104-FY22-248

120

7,200

0.4

2,880

$57.96

$166,925

Recipient

Tribe
Administrative
Plan FEMA Form
FF-104-FY-22250

1

0.4167

$57.96

$116

Applicant

Applicant

Recipient

Total

1,505

635,269

341,635

The term Recipient refers to States, Tribes, and Territories. The term Applicant refers to
States, Tribes, Territories, and local governments and certain private non-profit
organizations.
*FEMA Form FF-104-FY-22-246, Environmental and Historic Preservation Addendum
and FEMA Form FF-104-FY-22-247, Hazard Mitigation Addendum are addendums to
the Project Applications. Burden hours are for these addendums are included with the
estimated burden of the applicable project application.
Estimated Total Annual Respondent Cost: The estimated annual cost to
respondents for the hour burden is $19,801,167.

$19,801,167

Estimated Respondents’ Operations and Maintenance Costs: There are no annual
operations or maintenance costs associated with this information collection.
Estimated Respondents’ Capital and Start-Up Costs: There are no annual capital
or start-up costs associated with this information collection.
Estimated Total Annual Cost to the Federal Government: The estimated annual
cost to the Federal Government is $2,001,955.
Comments
The public may submit comments as indicated in the ADDRESSES caption
above. FEMA solicits comments to (a) evaluate whether the proposed data collection is
necessary for the proper performance of the agency, including whether the information
shall have practical utility; (b) evaluate the accuracy of the agency’s estimate of the
burden of the proposed collection of information, including the validity of the
methodology and assumptions used; (c) enhance the quality, utility, and clarity of the
information to be collected; and (d) minimize the burden of the collection of information
on those who are to respond, including through the use of appropriate automated,
electronic, mechanical, or other technological collection techniques or other forms of
information technology, e.g., permitting electronic submission of responses.
H. Privacy Act/E-Government Act
Under the Privacy Act of 1974, 5 U.S.C. 552a, an agency must determine whether
implementation of a proposed regulation will result in a system of records. A “record” is
any item, collection, or grouping of information about an individual that is maintained by
an agency, including, but not limited to, his/her education, financial transactions, medical
history, and criminal or employment history and that contains his/her name, or the
identifying number, symbol, or other identifying particular assigned to the individual,
such as a finger or voice print or a photograph.132 A “system of records” is a group of

See 5 U.S.C. 552a(a)(4).

records under the control of an agency from which information is retrieved by the name
of the individual or by some identifying number, symbol, or other identifying particular
assigned to the individual. An agency cannot disclose any record that is contained in a
system of records except by following specific procedures.
The E-Government Act of 2002, 44 U.S.C. 3501 note, also requires specific
procedures when an agency takes action to develop or procure information technology
that collects, maintains, or disseminates information that is in an identifiable form. This
Act also applies when an agency initiates a new collection of information that will be
collected, maintained, or disseminated using information technology if it includes any
information in an identifiable form permitting the physical or online contacting of a
specific individual.
In accordance with DHS policy, FEMA has completed a Privacy Threshold
Analysis for this rule. DHS has determined this rulemaking does not require the
development and publication of a new or modified System of Records Notice (SORN).
The information collected has coverage under an existing Privacy Impact Assessment
(PIA) and an existing SORN:
DHS/FEMA/PIA-013 Grant Management Programs; and
DHS/FEMA-009 Hazard Mitigation Assistance Grant Programs SORN.
The proposed rule does not impact the personally identifiable information (PII)
that FEMA currently collects, stores, maintains, or disseminates. The rulemaking has
adequate coverage under the above listed PIA and SORN.
I. Executive Order 13175, Consultation and Coordination with Indian Tribal
Governments
Executive Order 13175, 65 FR 67249 (Nov. 9, 2000), applies to agency
regulations that have Tribal implications, that is, regulations that have substantial direct
effects on one or more Indian tribes, on the relationship between the Federal Government
and Indian tribes, or on the distribution of power and responsibilities between the Federal

Government and Indian tribes. Under this Executive Order, to the extent practicable and
permitted by law, no agency may promulgate any regulation that has Tribal implications,
that imposes substantial direct compliance costs on Indian Tribal governments, and that is
not required by statute, unless funds necessary to pay the direct costs incurred by the
Indian Tribal government or the tribe in complying with the regulation are provided by
the Federal Government, or the agency consults with Tribal officials.
Although Indian Tribal governments are potentially eligible applicants under the
Public Assistance Program, FEMA has determined that this rule does not have a
substantial direct effect on one or more Indian tribes, on the relationship between the
Federal Government and Indian Tribes, or on the distribution of power and
responsibilities between the Federal Government and Indian Tribes. The proposed
revisions in this rule relating specifically to Indian Tribal governments are minor
clarifying changes to reflect current practice. There is no substantial direct compliance
cost associated with this proposed rule. The Public Assistance program is a voluntary
program available to eligible Tribal governments acting as a recipient, as well as State
and local governments and PNP organizations. The Public Assistance program provides
funding to applicants, including Tribal governments, in need of emergency and disaster
response assistance. Indian Tribal governments acting as recipients already comply with
certain conditions, including submitting an administrative plan and FEMA-Tribal
Agreement, in order to receive Public Assistance funding. FEMA does not expect the
regulatory changes in this proposed rule to disproportionately affect Indian Tribal
governments acting as recipients.
J. Executive Order 13132, Federalism
Executive Order 13132, 64 FR 43255 (Aug. 10, 1999), sets forth principles and
criteria that agencies must adhere to in formulating and implementing policies that have
federalism implications, that is, regulations that have “substantial direct effects on the

States, on the relationship between the national government and the States, or on the
distribution of power and responsibilities among the various levels of government.”
Federal agencies must closely examine the statutory authority supporting any action that
would limit the policymaking discretion of the States, and to the extent practicable, must
consult with State and local officials before implementing any such action.
FEMA has reviewed this proposed rule under Executive Order 13132 and has
concluded that it does not have substantial direct effects on the States, on the relationship
between the national government and the States, or on the distribution of power and
responsibilities among the various levels of government. Therefore, this proposed rule
does not have federalism implications as defined by the Executive Order. This
rulemaking would not significantly affect the rights, roles, and responsibilities of States,
and involves no preemption of State law. This rulemaking would amend a voluntary
grant program that State, local, and Tribal governments and eligible PNP organizations
may use to receive Federal grants to assist in the recovery from disasters. States are not
required to seek grant funding, and this rulemaking does not limit their policymaking
discretion.
K. Executive Order 11988, Floodplain Management
Executive Order 11988, 42 FR 26951 (May 25, 1977), as amended by Executive
Order 13690, “Establishing a Federal Flood Risk Management Standard (FFRMS) and a
Process for Further Soliciting and Considering Stakeholder Input,” (80 FR 6425, Feb. 4,
2015) and Executive Order 14030, “Climate-Related Financial Risk,” (86 FR 27967, May
25, 2021), requires each Federal agency to provide leadership and take action to reduce
the risk of flood loss, to minimize the impact of floods on human safety, health and
welfare, and to restore and preserve the natural and beneficial values served by
floodplains in carrying out its responsibilities for (1) acquiring, managing, and disposing
of Federal lands and facilities; (2) providing Federally undertaken, financed, or assisted

construction and improvements; and (3) conducting Federal activities and programs
affecting land use, including but not limited to water and related land resources planning,
regulating, and licensing activities. In carrying out these responsibilities, each agency
must evaluate the potential effects of any actions it may take in a floodplain; ensure that
its planning programs and budget requests reflect consideration of flood hazards and
floodplain management; and prescribe procedures to implement the policies and
requirements of the Executive Order.
Before promulgating any regulation, an agency must determine whether the
proposed regulations will affect a floodplain(s), and if so, the agency must consider
alternatives to avoid adverse effects and incompatible development in the floodplain(s).
If the head of the agency finds that the only practicable alternative consistent with the law
and with the policy set forth in Executive Order 11988 is to promulgate a regulation that
affects a floodplain(s), the agency must, prior to promulgating the regulation, design or
modify the regulation to minimize potential harm to or within the floodplain, consistent
with the agency’s floodplain management regulations and prepare and circulate a notice
containing an explanation of why the action is proposed to be located in the floodplain.
The requirements of Executive Order 11988 apply in the context of the provision
of Federal financial assistance relating to, among other things, construction and property
improvement activities. However, the changes proposed in this rule would not affect
floodplain management. The proposed rule would revise the Public Assistance
regulations to reflect current statutory authority and make improvements to the
administration of the Public Assistance program. When FEMA undertakes specific
actions that may affect floodplain management, FEMA follows the procedures set forth
in 44 CFR part 9 to ensure compliance with this Executive Order. These procedures
include a specific, 8-step process for conducting floodplain management and wetland
reviews. With few exceptions (such as emergencies) and as set forth in applicable

statutes or regulations, FEMA must complete reviews for compliance before FEMA
approves funding and starts work. The proposed rule would not change this process.
L. Executive Order 11990, Protection of Wetlands
Executive Order 11990, 42 FR 26961 (May 24, 1977), requires each Federal
agency to provide leadership and take action to minimize the destruction, loss or
degradation of wetlands, and to preserve and enhance the natural and beneficial values of
wetlands in carrying out the agency’s responsibilities for (1) acquiring, managing, and
disposing of Federal lands and facilities; and (2) providing Federally undertaken,
financed, or assisted construction and improvements; and (3) conducting Federal
activities and programs affecting land use, including but not limited to water and related
land resources planning, regulating, and licensing activities. Each agency, to the extent
permitted by law, must avoid undertaking or providing assistance for new construction
located in wetlands unless the head of the agency finds (1) that there is no practicable
alternative to such construction, and (2) that the proposed action includes all practicable
measures to minimize harm to wetlands which may result from such use. In making this
finding the head of the agency may take into account economic, environmental, and other
pertinent factors.
In carrying out the activities described in the Executive Order, each agency must
consider factors relevant to a proposal’s effect on the survival and quality of the
wetlands. Among these factors are: public health, safety, and welfare, including water
supply, quality, recharge and discharge; pollution; flood and storm hazards; and sediment
and erosion; maintenance of natural systems, including conservation and long term
productivity of existing flora and fauna, species and habitat diversity and stability,
hydrologic utility, fish, wildlife, timber, and food and fiber resources; and other uses of
wetlands in the public interest, including recreational, scientific, and cultural uses.

The requirements of Executive Order 11990 apply in the context of the provision
of Federal financial assistance relating to, among other things, construction and property
improvement activities. However, the changes proposed in this rule would not affect
land use or wetlands. The proposed rule would revise the Public Assistance regulations
to reflect current statutory authority and make improvements to the administration of the
Public Assistance program.
When FEMA undertakes specific actions that may affect wetlands, FEMA
follows the procedures set forth in 44 CFR part 9 to ensure compliance with this
Executive Order. These procedures include a specific, 8-step process for conducting
floodplain management and wetland reviews. With few exceptions (such as
emergencies) and as authorized in applicable statutes or regulations, FEMA must
complete reviews for compliance before FEMA approves funding and starts work. The
proposed rule would not change this process.
M. Executive Orders 12898 and 14096, Environmental Justice
Under Executive Orders 12898, “Federal Actions to Address Environmental
Justice in Minority Populations and Low-Income Populations,” and 14096, “Revitalizing
Our Nation’s Commitment to Environmental Justice for All” (which builds upon
Executive Order 12898133) agencies must, as appropriate and consistent with applicable
law, identify, analyze, and address the disproportionate and adverse human health and
environmental effects (including risks) and hazards of rulemaking actions and other
Federal activities on communities with environmental justice concerns.134
This rulemaking would not result in disproportionate and adverse effects on
human health or the environment. This rulemaking involves grant funding under the

Exec. Order No. 12898 of Feb. 11, 1994 (Federal Actions To Address Environmental Justice in Minority
Populations and Low-Income Populations), 59 FR 7629 (Feb. 16, 1994).
134 For further information, including the definition of environmental justice, see Exec. Order No. 14096 of
Apr. 21, 2023 (Revitalizing Our Nation's Commitment to Environmental Justice for All), 88 FR 25251
(Apr. 26, 2023).
Public Assistance program, a program that provides funding to States, local governments,
Tribal governments, and PNP organizations to assist them in their emergency response
and disaster response and recovery efforts. It would not have the effect of excluding
persons from participation in or denying persons the benefit of this program, nor will it
subject persons to discrimination because of race, color, or national origin. The Public
Assistance program is administered consistent with the nondiscrimination requirements
of 44 CFR 206.11 and section 308 of the Stafford Act, 42 U.S.C. 5151.
N. OMB Circular A-119, Voluntary Consensus Standards
“Voluntary consensus standards” are standards developed or adopted by voluntary
consensus standards bodies, both domestic and international. These standards include
provisions requiring that owners of relevant intellectual property have agreed to make
that intellectual property available on a non-discriminatory, royalty-free or reasonable
royalty basis to all interested parties. OMB Circular A-119, “Federal Participation in the
Development and Use of Voluntary Consensus Standards and in Conformity Assessment
Activities,” directs agencies to use voluntary consensus standards in their regulatory
actions in lieu of government-unique standards except where inconsistent with law or
otherwise impractical. The policies in the Circular are intended to reduce to a minimum
the reliance by agencies on government-unique standards.
Section 1235(b) of DRRA amended section 406(e) of the Stafford Act to require
FEMA fund repair, restoration, reconstruction, or replacement in conformity with
the latest published editions of relevant consensus-based codes,
specifications, and standards that incorporate the latest hazard-resistant
design and establish minimum acceptable criteria for the design,
construction, and maintenance of residential structures and facilities that
may be eligible for assistance under [the Stafford] Act for the purposes of
protecting the health, safety, and general welfare of a facility’s users against
disasters.
This rule proposes to codify this requirement in FEMA’s regulations at 44 CFR
206.226(c)(1). FEMA’s interim guidance on DRRA section 1235(b) provides more

information on which voluntary consensus codes fall within the scope of this
provision.135
O. Congressional Review of Agency Rulemaking
Under the Congressional Review of Agency Rulemaking Act (CRA), 5 U.S.C.
801-808, before a rule can take effect, the Federal agency promulgating the rule must
submit to Congress and to the Government Accountability Office (GAO) a copy of the
rule, a concise general statement relating to the rule, including whether it is a major rule,
the proposed effective date of the rule, a copy of any benefit-cost analysis, descriptions of
the agency’s actions under the Regulatory Flexibility Act and the Unfunded Mandates
Reform Act, and any other information or statements required by relevant executive
orders. FEMA will send this rule to the Congress and to GAO pursuant to the CRA if the
rule is finalized.
This rule is not a “major rule” within the meaning of the CRA. It would not have
an annual effect on the economy of $100,000,000 or more, it would not result in a major
increase in costs or prices for consumers, individual industries, Federal, State, or local
government agencies, or geographic regions, and it would not have significant adverse
effects on competition, employment, investment, productivity, innovation, or on the
ability of United States-based enterprises to compete with foreign-based enterprises in
domestic and export markets.
List of Subjects in 44 CFR Part 206
Administrative practice and procedure, Coastal zone, Community facilities,
Disaster assistance, Fire prevention, Grant programs-housing and community
development, Housing, Insurance, Intergovernmental relations, Loan programs-housing

Consensus-Based Codes, Specifications and Standards for Public Assistance, FEMA Recovery Interim
Policy FP-104-009-11 Ver. 2.1, Appendix A (Dec. 20, 2019), available at
https://www.fema.gov/sites/default/files/2020-07/fema_DRRA-1235b-public-assistance-codes-standardsinterim-policy.pdf.
and community development, Natural resources, Penalties, Reporting and recordkeeping
requirements.
For the reasons discussed in the preamble, the Federal Emergency Management
Agency proposes to amend 44 CFR part 206 as follows:
PART 206—FEDERAL DISASTER ASSISTANCE
1. The authority citation for part 206 continues to read as follows:
Authority: Robert T. Stafford Disaster Relief and Emergency Assistance Act, 42
U.S.C. 5121 through 5207; Homeland Security Act of 2002, 6 U.S.C. 101 et seq.;
Department of Homeland Security Delegation 9001.1; sec. 1105, Pub. L. 113-2, 127 Stat.
43 (42 U.S.C. 5189a note).
Subpart A—General
2. In § 206.2:
a. Revise paragraphs (a)(4), (a)(6), (a)(10), (a)(14), (a)(15), (a)(18),
(a)(19), (a)(20), and (a)(24);
b. Redesignate paragraphs (a)(26) and (a)(27) as (a)(28) and (a)(29),
respectively; and
c. Add new paragraphs (a)(26) and (a)(27).
The revisions and additions read as follows:
§ 206.2 Definitions.
(a) * * *
* * * * *
(4) Concurrent, multiple major disasters: In considering a request for an advance,
the term concurrent multiple major disasters means major disasters that occur within a
12-month period immediately preceding the major disaster for which an advance of the
non-Federal share is requested pursuant to section 319 of the Stafford Act.
* * * * *

(6) Designated area: Any emergency or major disaster-affected portion of a State
that has been determined eligible for Federal assistance.
* * * * *
(10) Federal agency: Any department, independent establishment, Government
corporation, or other agency of the executive branch of the Federal Government,
including the United States Postal Service, but will not include the American National
Red Cross.
* * * * *
(14) Hazard mitigation: Any cost-effective measure that will reduce the potential
for damage to a facility from future disaster impacts.
* * * * *
(15) Individual assistance: Supplementary Federal assistance provided under the
Stafford Act to individuals and families adversely affected by a major disaster or an
emergency. Such assistance may be provided directly by the Federal Government or
through State, local, or Indian Tribal governments, or disaster relief organizations. For
further information, see subparts D, E, and F of these regulations.
* * * * *
(18) Mission assignment: Work order issued by the Regional Administrator,
Associate Administrator for the Office of Response and Recovery, or Administrator, to a
Federal agency directing completion by that agency of a specified task and citing
funding, other managerial controls, and guidance.
* * * * *
(19) Private nonprofit organization: Any nongovernmental agency or entity that
currently has:

(i) An effective ruling letter from the U.S. Internal Revenue Service granting tax
exemption under section 501(c), (d), or (e) of the Internal Revenue Code of 1986, as
amended;
(ii) Satisfactory evidence from the State or Indian Tribal government that the
organization or entity is a nonprofit one organized or doing business under State or Tribal
law; or
(iii) If the organization is exempt from the requirement to apply for 501(c)(3)
status and is exempt from requirements to apply for tax exempt status under applicable
State or Tribal law, the organization must provide articles of association, bylaws, or other
organizing documents indicating that it is an organized entity and a certification that it is
compliant with Internal Revenue Code section 501(c)(3) and State or Tribal law
requirements.
(20) Public Assistance: Supplementary Federal assistance provided under the
Stafford Act to State, local, and Indian Tribal governments, and certain private, nonprofit
organizations other than assistance for the direct benefit of individuals and households.
For further information, see subparts G (Public Assistance Project Administration), H
(Public Assistance Eligibility), I (Public Assistance Insurance Requirements), J (Coastal
Barrier Resources Act), K (Community Disaster Loans), and M (Minimum Standards) of
this part. Fire Management Assistance Grants under section 420 of the Stafford Act are
also considered Public Assistance; see part 204 of this subchapter.
* * * * *
(24) State or Tribal emergency plan: As used in section 401 or section 501 of the
Stafford Act means the State or Tribal plan that is designated specifically for State or
Indian Tribal government level response to emergencies or major disasters and which sets
forth actions to be taken by the State, Indian Tribal government, and local governments,
including those for implementing Federal disaster assistance.

* * * * *
(26) Tribal Authorized Representative (TAR): The person empowered by the
Tribal Executive to execute, on behalf of the Indian Tribal government, all necessary
documents for disaster assistance.
(27) Tribal Coordinating Officer: The person appointed by the Tribal Executive
to act in cooperation with the Federal Coordinating Officer to administer disaster
recovery efforts.
* * * * *
§ 206.11 [Amended]
3. Amend § 206.11 as follows:
a. Remove the word “shall” wherever it appears, and add in its place the
word “will”.
b. In paragraph (b), before the words “or economic status” add “disability,
English proficiency,”.
§ 206.12 [Amended]
4. Amend § 206.12 as follows:
a. In paragraph (a), remove the words “and other voluntary organizations”
and add in their place the words “long-term recovery groups, domestic hunger
relief organizations, and other relief or voluntary organizations”.
b. In paragraph (b), remove the words “the American Red Cross” and add
in their place the words “the American National Red Cross”, and remove the
words “and other voluntary organizations” and add in their place the words “longterm recovery groups, domestic hunger relief organizations, and other relief or
voluntary organizations”.
c. Remove the word “shall” wherever it appears, and add in its place the
word “will”.

Subpart C—Emergency Assistance
5. In § 206.62, revise paragraphs (a), (b), (c), and (g) to read as follows:
§ 206.62 Available assistance.
* * ***
(a) Direct any Federal agency, with or without reimbursement, to utilize its
authorities and the resources granted to it under Federal law (including personnel,
equipment, supplies, facilities, and managerial, technical and advisory services) in
support of State, Indian Tribal government, and local emergency assistance efforts to
save lives, protect property and public health and safety, and lessen or avert the threat of
a catastrophe;
(b) Coordinate all disaster relief assistance (including voluntary assistance)
provided by Federal agencies, private organizations, and State, local, and Indian Tribal
governments;
(c) Provide technical and advisory assistance to affected State, local, and Indian
Tribal governments for:
(1) The performance of essential community services;
(2) Issuance of warnings of risks or hazards;
(3) Public health and safety information, including dissemination of such
information;
(4) Provision of health and safety measures; and
(5) Management, control, and reduction of immediate threats to public health and
safety;
* * * * *
(g) Assist State, local, and Indian Tribal governments in the distribution of
medicine, food, and other consumable supplies, and emergency assistance.

Subpart G—Public Assistance Project Administration
6. Revise § 206.200 to read as follows:
§ 206.200 General.
(a) This subpart establishes procedures for the administration of Public
Assistance awards approved under the provisions of the Stafford Act.
(b) The Stafford Act requires that FEMA deliver eligible assistance as quickly
and efficiently as possible consistent with Federal laws and regulations.
(c) The recipient and subrecipient must adhere to the requirements of the Stafford
Act and to these regulations when administering Public Assistance awards.
(d) 2 CFR part 200 applies to all Public Assistance awards and to all recipients
and subrecipients of Public Assistance awards except where its provisions are
inconsistent with the Stafford Act or these regulations.
7. Revise § 206.201 to read as follows:
§ 206.201 Definitions used in this subpart.
Applicant means a State agency, Indian Tribal government, local government, or a
private nonprofit organization or institution that owns or operates a private nonprofit
facility as defined in § 206.221, submitting an application to the recipient for assistance
under the Public Assistance program.
Award means the financial assistance that the recipient receives from FEMA. The
award is based on the total eligible Federal share of all approved projects.
Facility means building, structure, system, or equipment, built or manufactured,
or an improved and maintained natural feature. Land used for agricultural purposes is not
a facility.
Host-State. A State or Indian Tribal government that by agreement with FEMA
provides sheltering and/or evacuation support to evacuees from an impact-State. An
Indian Tribal government may also be referred to as a “Host-Tribe.”

Impact-State. The State for which the President has declared an emergency or
major disaster and that, due to a need to evacuate and/or shelter affected individuals
outside the State, requests such assistance from FEMA pursuant to § 206.209.
Indian Tribal government means any federally recognized governing body of an
Indian or Alaska Native Tribe, band, nation, pueblo, village, or community that the
Secretary of the Interior acknowledges to exist as an Indian Tribe under the Federally
Recognized Tribe List Act of 1994, 25 U.S.C. 479a. This does not include Alaska Native
corporations, the ownership of which is vested in private individuals.
Permanent work means work performed pursuant to section 406 of the Robert T.
Stafford Disaster Relief and Emergency Assistance Act, 42 U.S.C. 5172.
Predisaster design means the size or capacity of a facility as originally designed
and constructed or subsequently modified by changes or additions to the original design.
It does not mean the capacity at which the facility was being used at the time the major
disaster occurred if different from the most recent designed capacity.
Project is a logical grouping of work required as a result of the declared major
disaster or emergency. A project may include eligible work at several sites.
Project approval means the process in which the Regional Administrator, or
designee, reviews a proposed project and approves the work and costs on a Project
Application or related Project Applications.
Project Application is used to document the location, scope of work, cost or cost
estimate, terms and conditions, and information required for approval. For permanent
work, the form is also used to document damage description and dimensions.
Recipient means the government that receives an award directly from FEMA and
which is accountable for the use of the funds provided. The recipient is the entire legal
entity even if only a particular component of the entity is designated in the award
document. Except as provided in § 206.202(f), the State or Indian Tribal government for

which the emergency or major disaster is declared is the recipient. However, an Indian
Tribal government may choose under a declaration provided to the State to be either a
recipient of FEMA, or a subrecipient of the State. If an Indian Tribal government elects
to be a recipient of FEMA under a declaration provided to the State, it will assume the
responsibilities of the “recipient” or “State” as described in this part with respect to
administration of the Public Assistance program.
Resiliency means the ability to prepare for threats and hazards, adapt to changing
conditions, and withstand and recover rapidly from adverse conditions and disruptions.
Resilient means able to prepare for threats and hazards, adapt to changing
conditions, and withstand and recover rapidly from adverse conditions and disruptions.
Site means an individual building, structure, location, or system section.
Subaward means an award of financial assistance provided by the recipient to a
subrecipient.
Subrecipient means the government or other legal entity that receives a subaward
from the recipient and which is accountable to the recipient for the use of the funds
provided.
8. In § 206.202, revise paragraphs (a) through (e), (f)(1), and (f)(2) to read as
follows:
§ 206.202 Application procedures.
(a) General. This section describes the policies and procedures that FEMA uses
to process Public Assistance awards to a recipient. The recipient is responsible for
processing subawards to subrecipients pursuant to 44 CFR part 206, the recipient’s own
policies and procedures, and the applicable requirements of 2 CFR part 200.
(b) Recipient. The recipient is responsible for administering all funds provided
under the Public Assistance program. The recipient’s responsibilities include:

(1) Ensuring that all potential applicants are aware of available assistance under
the Public Assistance program;
(2) Providing support for project identification and development activities,
including site inspections and scope of work and cost development;
(3) Providing technical advice and assistance to eligible subrecipients;
(4) Informing subrecipients of the status of applications for Public Assistance
funding, including FEMA’s approval of the Project Application and the process for
disbursement of funds; and
(5) Submitting documents necessary for the approval of subawards.
(c) Request for Public Assistance (Request). The recipient must submit a
completed Request to the Regional Administrator, or designee, for each Public Assistance
applicant. The recipient must submit Requests to the Regional Administrator no later
than 30 calendar days after the area is designated in an emergency or major disaster
declaration.
(d) Project Applications.
(1) An applicant’s authorized local representative is responsible for representing
the applicant and for ensuring that the applicant has identified all eligible work and
submitted all costs or cost estimates for disaster-related damage. The applicant, assisted
by the recipient or FEMA as appropriate, must prepare a Project Application for each
project.
(2) Within 90 calendar days following FEMA’s approval of the Request for
Public Assistance, the applicant must identify and report all impacts the applicant
proposes be included on the Project Applications.
(3) For work not completed prior to or during the project development period, the
applicant must conduct any site inspections necessary to validate incident impacts and
obtain all information necessary to complete a detailed description of the impacts.

Within 30 calendar days following a site inspection or 120 calendar days following
FEMA’s approval of the Request for Public Assistance, whichever is later, the applicant
must also provide the recipient and FEMA all other documentation necessary to
determine eligible work and costs.
(4) When the estimated cost of work at a site is less than $3,900 that work is not
eligible and FEMA will not approve funding for the site. This minimum threshold
amount will be reviewed annually and may be adjusted to reflect changes in the
Consumer Price Index for All Urban Consumers published by the Department of Labor.
(e) Award notification.
(1) The recipient must complete and send to the Regional Administrator, or
designee, a Standard Form (SF) 424, Application for Federal Assistance, and a SF 424D,
Assurances for Construction Programs, before FEMA obligates any Public Assistance
funds to the recipient. Upon request and after receipt of the SF 424 and SF 424D, the
Regional Administrator, or designee, may obligate funds to the recipient based on the
approved Project Applications. The recipient will then pay claims in accordance with
§206.206 based on the Project Applications approved for each subrecipient.
(2) The recipient will notify the subrecipient of FEMA’s approval of a subaward.
(f) * * *
(1) Host-State/Tribe Evacuation and/or Sheltering.
(i) General. A host-State/Tribe is eligible for an award under sections 403 or 502
of the Stafford Act for sheltering and/or evacuation support when an impact-State/Tribe
requests direct Federal assistance for sheltering and/or evacuation support pursuant to
§206.209. To receive this award, a host-State/Tribe must enter into a FEMA-HostState/Tribe Agreement, amend its State/Tribal Administrative Plan pursuant to § 206.208,
and submit a Standard Form SF 424 Application for Federal Assistance directly to FEMA
to apply for reimbursement of eligible costs for evacuating and/or sheltering individuals

from an impact-State/Tribe. Upon award, the host-State/Tribe assumes the
responsibilities of the “recipient” under this part with respect to its award.
(ii) Force Account Labor Costs. For the performance of eligible evacuation and
sheltering support under sections 403 or 502 of the Stafford Act, the straight-time salaries
and benefits of a host-State/Tribe’s permanently employed personnel are eligible for
reimbursement. This is an exception to § 206.228(b).
(2) Time limitations. The Regional Administrator, or designee, may extend the
time limit shown in paragraphs (c) and (d) of this section when the recipient justifies and
makes a request in writing. The justification must be based on extenuating circumstances
beyond the recipient’s and subrecipient’s control.
9. Revise § 206.203 to read as follows:
§ 206.203 Federal funding for large and small projects.
(a) Cost sharing. All projects approved under FEMA Public Assistance awards
will be subject to the cost sharing provisions established in the FEMA-State/Tribe
Agreement and the Stafford Act.
(b) Large projects. When the approved estimate of eligible costs for an individual
project is $1,000,000 or greater, Federal funding will equal the Federal share of the actual
eligible costs documented by a recipient. This minimum threshold amount will be
reviewed annually and may be adjusted to reflect changes in the Consumer Price Index
for All Urban Consumers published by the Department of Labor.
(c) Small projects. When the approved estimate of costs for an individual project
is less than $1,000,000, Federal funding will equal the Federal share of the approved
estimate of eligible costs. This amount will be reviewed annually and may be adjusted as
indicated in paragraph (b) of this section.

(d) Applicability date. The dollar threshold provided in paragraphs (b) and (c) of
this section applies to project applications that have not been obligated as of August 3,
2022 for major disasters and emergencies declared on or after March 13, 2020.
§§ 206.204 through 206.209 [Redesignated as §§ 206.205 through 206.210]
10. Redesignate §§ 206.204 through 206.209 as §§ 206.205 through 206.210,
respectively.
11. Add new § 206.204 to read as follows:
§ 206.204 Funding options—improved projects and alternate projects.
(a) Improved projects—(1) Purpose. A subrecipient may request an improved
project when it desires to restore the predisaster function of a damaged facility and make
improvements. Improved projects may only be approved for permanent work.
(2) Approval. The subrecipient must obtain the recipient’s written approval prior
to the start of project construction. The recipient must notify the Regional Administrator,
or designee, of its approval in writing.
(3) Deadlines. Work completion deadlines, set forth in § 206.205, apply to the
completion of the improved project.
(4) Funding. Public Assistance funding for improved projects will be limited to
the Federal share of the approved estimate of eligible costs that would be associated with
repairing or replacing the damaged facility to its predisaster design, or to the actual costs
of completing the improved project, whichever is less.
(b) Alternate projects—(1) Purpose. An alternate project may be requested in
any case where a subrecipient determines that the public welfare would not be best served
by restoring the function of a disaster-damaged public or private nonprofit facility. An
alternate project may only be approved for permanent work.
(2) Approval. Prior to the start of construction on any alternate project, the
recipient must submit for approval by the Regional Administrator, or designee, the

following: a description of the project(s); schedule of work, including starting date and
targeted completion date; the projected cost of the project(s); and supporting
documentation identifying any environmental or historic preservation issues and any
other legal considerations. An applicant must receive approval from the Regional
Administrator prior to the start of construction on an alternate project.
(3) Deadlines. Work completion deadlines, set forth in § 206.205, apply to the
completion of alternate projects.
(4) Funding—(i) Amount. Public Assistance funding for alternate projects for
damaged public and private nonprofit facilities is limited to the Federal share of the
FEMA-approved estimate of the total eligible cost of repairing, restoring, reconstructing,
or replacing the original facility to its predisaster function, or to the actual costs of
completing the alternate project, whichever is less.
(ii) Use of funds—(A) Public facilities. Funds awarded for alternate projects may
be used to repair or expand public facilities, construct new public facilities, purchase
eligible capital equipment, fund hazard mitigation measures, and demolish the original
damaged facility when demolition is an associated expense of the alternate project.
Funds awarded for alternate projects may not be used to pay the non-Federal share of any
project, nor any operating expense. Alternate project funds awarded to a State, local, or
Indian Tribal government under this paragraph may not be used for any public facility
located in a regulatory floodway (as defined in section 59.1 of title 44, Code of Federal
Regulations (or a successor regulation)), or for any uninsured public facility located in a
special flood hazard area identified by the Administrator of FEMA under the National
Flood Insurance Act of 1968 (42 U.S.C. 4001 et seq.).
(B) Private Nonprofit Facilities. Funds awarded for alternate projects may be
used to repair or expand other eligible private nonprofit facilities owned or operated by
the subrecipient; construct new eligible facilities to be owned or operated by the

subrecipient; purchase equipment needed to repair, restore, expand, or construct an
eligible facility; to fund hazard mitigation measures that the subrecipient determines to be
necessary to meet a need for the subrecipient’s eligible services and functions in the area
affected by the major disaster; and demolish the original structure when demolition is an
associated expense of the alternate project. These funds may not be used to pay the nonFederal share of any project, nor any operating expense. Alternate project funds made
available to a subrecipient under this paragraph may not be used for any private nonprofit
facility located in a regulatory floodway (as defined in section 59.1 of title 44, Code of
Federal Regulations (or a successor regulation)), or any uninsured private nonprofit
facility located in a special flood hazard area identified by the Administrator of FEMA
under the National Flood Insurance Act of 1968 (42 U.S.C. 4001 et seq.).
12. Amend newly redesignated § 206.205 as follows:
a. Revise paragraph (c), the introductory text to paragraph (d), paragraph (d)(2),
the introductory text to paragraph (e)(1), paragraphs (e)(2), and (f); and
b. Add paragraph (e)(3).
The revisions and addition read as follows:
§ 206.205 Project performance.
* * * * *
(c) Time limitations for completion of work –
(1) Deadlines. The work completion deadlines shown below are set from the date
that a major disaster or emergency is declared and apply to all projects approved under
the award.
Completion Deadlines
Type of work
Debris removal and emergency protective measures

Months
Permanent work

(2) Exceptions –
(i) FEMA and the recipient may impose lesser deadlines for the completion of
work under paragraph (c)(1) of this section if considered appropriate.
(ii) Based on extenuating circumstances or unusual project requirements beyond
the control of the subrecipient, the recipient may extend the deadlines under paragraph
(c)(1) of this section for an additional 6 months for debris removal and emergency
protective measures, with the exception of extensions of temporary relocation deadlines,
which require prior FEMA approval. The recipient may extend the deadlines under
paragraph (c)(1) of this section for an additional 30 months, on a project-by-project basis,
for permanent work. However, all extensions of deadlines for temporary relocation
require prior FEMA approval.
(d) Requests for time extensions. A request for a time extension beyond the
recipient’s authority must be submitted by the recipient to the Regional Administrator, or
designee, prior to the expiration of the last approved time extension and must include the
following:
* * * * *
(2) A detailed written justification for the delay and a projected completion date.
The justification must be based on extenuating circumstances beyond the recipient’s and
subrecipient’s control. The Regional Administrator must review the request and make a
determination. The Regional Administrator will notify the recipient of his/her
determination in writing. If the Regional Administrator approves the request, the
approval notice will reflect the new completion date and any other requirements the
Regional Administrator may determine necessary to ensure that the new completion date
is met. If the Regional Administrator denies the time extension request, FEMA may

reimburse the recipient for eligible project costs incurred only up to the latest approved
completion date. If the work is not completed, no Federal funding will be provided for
that project unless the completed work is distinct from the uncompleted work.
(e) * * *
(1) Categories. During the execution of approved work, a subrecipient may find
that the actual project costs exceed the approved Project Application estimates. Such cost
overruns normally fall into the following three categories:
* * * * *
(2) Large projects. The subrecipient must evaluate each cost overrun and may,
when justified, submit a request to the recipient for additional funding. The request for
additional funding should be made as soon as practicable to allow FEMA or the recipient
the opportunity to inspect the uncompleted project to validate that the additional costs are
eligible. All requests for approval of additional funding must contain sufficient
documentation to support the eligibility of all claimed work and costs. The recipient will
make a written recommendation, and must provide it with the subrecipient’s request and
all supporting documentation, to the Regional Administrator, or designee. The Regional
Administrator will notify the recipient in writing of the final determination.
(3) Small projects. FEMA will not normally review an overrun for an individual
small project. When a subrecipient discovers a significant overrun related to the total
final cost for all of its small projects, the subrecipient may submit a request for additional
funding. The request must be made within 90 calendar days following the completion of
the last of a subrecipient’s small projects.
(f) Progress reports. The recipient must submit a quarterly progress report to the
Regional Administrator, or designee. The Regional Administrator and the recipient must
agree upon the date for submission of the first report. Progress reports must describe the
status of open large projects.

13. Revise newly redesignated § 206.206 to read as follows:
§ 206.206 Payment of claims.
(a) Small Projects. FEMA will make payment of the Federal share of small
projects to the recipient upon approval of the Project Application. The recipient will
make payment of the Federal share to the subrecipient, consistent with State or Tribal
laws, as soon as practicable after Federal approval of funding. The recipient must certify
that all small projects were completed in accordance with FEMA approvals and that the
recipient contribution to the non-Federal share, as specified in the FEMA-State
Agreement or FEMA-Tribal Agreement, has been made to each subrecipient, if
applicable. The recipient’s certification must be made within 90 calendar days of the last
approved small project completion date of record. The amount spent by a subrecipient on
small projects is not required to be specified in the recipient’s certification. The Federal
payment for small projects will not be reduced if all of the approved funds are not spent
to complete a project. However, failure to complete a project may require that the
Federal payment be refunded.
(b) Large projects—(1) The subrecipient must submit cost documentation for
each large project to the recipient for final payment within 90 calendar days of
completion of the approved scope of work for that Project Application. The recipient
must submit cost documentation for each large project to the Regional Administrator as
soon as practicable, but not later than 90 calendar days after the subrecipient has
submitted documentation for final payment. The recipient must make an accounting to
the Regional Administrator of eligible costs for each approved large project. In
submitting the accounting the recipient must certify that reported costs were incurred in
the performance of eligible work, that the approved work was completed, that the project
is in compliance with the provisions of the FEMA-State Agreement or FEMA-Tribal

Agreement, and that payments for that project have been made in accordance with 2 CFR
200.305.
(2) The Regional Administrator, or designee, will review the accounting to
determine the eligible amount of reimbursement for each large project and approve
eligible costs. If a discrepancy between reported costs and approved funding exists, the
Regional Administrator may conduct field reviews to gather additional information. If
discrepancies in the claim cannot be resolved through a field review, a Federal audit may
be conducted. If the Regional Administrator determines that eligible costs vary from the
approved estimate, the Regional Administrator will adjust the funding to reflect the actual
eligible costs as necessary.
(3) The recipient will make payment of the Federal share to the subrecipient as
soon as practicable after the Federal obligation of funding, consistent with State or Tribal
laws.
(4) The Regional Administrator, or designee, may extend the time limits shown in
paragraphs (1), (2) and (3) of this section when the recipient justifies and makes a request
in writing. The justification must be based on extenuating circumstances beyond the
recipient’s and subrecipient’s control.
§ 206.206 [Redesignated as § 206.207 and amended]
14. In newly redesignated § 206.207, amend paragraph (a) as follows:
a. Remove the words “Applicant has the same meaning as the definition at
§ 206.201(a)” and add in their place the words “Applicant has the same meaning
as the definition at § 206.201”; and
b. Remove the words “Recipient has the same meaning as the definition at
§ 206.201(m)” and add in their place the words “Recipient has the same meaning
as the definition at § 206.201”.

15. Amend newly redesignated § 206.208 by revising paragraph (a), the
introductory text to paragraph (b), and paragraphs (b)(1), (b)(1)(i), (b)(1)(iii)(G), (H), and
(K); (b)(3) and (4); and (c) to read as follows:
§ 206.208 Administrative and audit requirements.
(a) General. 2 CFR part 200 sets forth uniform administrative requirements for
Federal awards, including certain provisions that apply to all awards and subawards in
this part.
(b) State/Tribal administrative plan—(1) The recipient must develop a plan for
the administration of the Public Assistance program that includes at a minimum, the
items listed below:
(i) The designation of the recipient agency or agencies which will have the
responsibility for program administration.
* * * * *
(iii) * * *
(G) Compliance with the applicable administrative requirements of 2 CFR part
200 and 44 CFR part 206;
(H) Compliance with the applicable audit requirements of 2 CFR 200.500-521;
*****
(K) Ensuring the timely closing out of subawards, subrecipients, and awards.
* * * * *
(3) The recipient must submit, and receive approval from the Regional
Administrator, or designee, of an administrative plan before FEMA will approve awards
for an emergency or major disaster. The recipient must submit an updated plan to the
Regional Administrator annually. In each disaster for which Public Assistance is
available, the Regional Administrator will request the recipient to prepare any
amendments required to meet current policy guidance, or necessary to address the

recipient staffing plan for administering the Public Assistance program for the particular
disaster.
(4) The recipient must ensure that the approved administrative plan is
incorporated into the State or Tribal emergency plan.
(c) Audit—(1) Non-Federal audit. For recipients or subrecipients, requirements
for a non-Federal audit are contained in 2 CFR 200.500-521.
(2) Federal audit. In accordance with 2 CFR 200.500-521, FEMA may elect to
conduct a Federal audit of the award or any of the subawards.
16. Amend newly redesignated § 206.209 by revising paragraphs (a), (b)
introductory text, (b)(1) introductory text, (b)(1)(i) through (iii), (b)(2) and (3), and (c)
through (e) to read as follows:
§ 206.209 Direct Federal assistance.
(a) General. When a State or Indian Tribal government lacks the capability to
perform or to contract for eligible emergency protective measures or debris removal
under sections 402, 403, 407, 502(a)(1), (4) through (7), or 503 of the Stafford Act, it
may request that the work be accomplished by a Federal agency. In addition, assistance
is also available under section 418 of the Stafford Act for emergency communications,
and section 419 of the Stafford Act for emergency public transportation. Direct Federal
assistance is subject to the cost sharing provisions outlined in § 206.203(a) of this
subpart. Direct Federal assistance is also subject to the eligibility criteria contained in
Subpart H of these regulations. FEMA will reimburse other Federal agencies in
accordance with Subpart A of these regulations.
(b) Requests for assistance. All requests for direct Federal assistance must be
submitted by the recipient to the Regional Administrator and must include:
(1) A written agreement that the State or Indian Tribal government will:

(i) Provide without cost to the United States all lands, easements, and rights-ofways necessary to accomplish the approved work;
(ii) Hold and save the United States free from damages due to the requested work,
and must indemnify the Federal Government against any claims arising from such work;
(iii) Provide reimbursement to FEMA for the non-Federal share of the cost of
such work in accordance with the provisions of the FEMA-State Agreement or FEMATribal Agreement; and
* * * * *
(2) A certification and explanation from the State or Indian Tribal government
that the State, local, or Indian Tribal government cannot perform or contract for
performance of the requested work.
(3) A written agreement from an eligible applicant that such applicant will be
responsible for the items in paragraph (b)(1)(i) and (ii) of this section, in the event that a
State or Indian Tribal government is legally unable to provide the written agreement.
(c) Implementation—(1) If FEMA approves the request, FEMA may perform or
contract for the work itself, or will, as appropriate, issue a mission assignment to the
appropriate Federal agency. The mission assignment to the Federal agency will define
the scope of eligible work, the estimated cost of the eligible work and the billing period
frequency. The Federal agency must not exceed the approved funding limit without the
authorization of the Regional Administrator.
(2) The Regional Administrator will not approve FEMA funding for any part of
the requested work that falls within the more specific statutory authority of another
Federal agency. In such case, the unapproved portion of the request will be referred to
the appropriate agency for action.
(3) If an impact-State/Tribe requests assistance in providing evacuation and
sheltering support outside an impact-State/Tribe, FEMA may directly reimburse a host-

State/Tribe for such eligible costs through an award to a host-State/Tribe under an
impact-State/Tribe’s declaration, consistent with § 206.202(f)(1). FEMA may grant an
award to a host-State/Tribe when FEMA determines that a host-State/Tribe has sufficient
capability to meet some or all of the sheltering and/or evacuation needs of an impactState/Tribe, and a host-State/Tribe agrees in writing to provide such support to an impactState/Tribe.
(d) Time limitation. The time limitation for completion of work by a Federal
agency under a mission assignment is 60 calendar days after the President’s declaration.
Based on extenuating circumstances or unusual project requirements, the Regional
Administrator may extend this time limitation.
(e) Project management—(1) The performing Federal agency must ensure that the
work is completed in accordance with the Regional Administrator’s approved scope of
work, costs, and time limitations. The performing Federal agency must also keep the
Regional Administrator and recipient advised of work progress and other project
developments. It is the responsibility of the performing Federal agency to ensure
compliance with applicable Federal, State, Tribal, and local legal requirements. A final
inspection report will be completed upon termination of all direct Federal assistance
work. Final inspection reports will be signed by a representative of the performing
Federal agency and the State or Indian Tribal government. Once the final eligible cost is
determined (including agency overhead), FEMA will bill the State or Indian Tribal
government for the non-Federal share of the mission assignment in accordance with the
cost sharing provisions of the FEMA-State Agreement or FEMA-Tribal Agreement, as
applicable.
(2) Pursuant to the agreements provided in the request for assistance the recipient
will assist the performing Federal agency in all State, Indian Tribal government, and local

jurisdictional matters. These matters include securing local building permits and rights of
entry, control of traffic and pedestrians, and compliance with local building ordinances.
§ 206.209 [Redesignated as § 206.210 and amended]
17. Amend newly redesignated § 206.210 as follows:
a. In the paragraph (b) introductory text, remove the word “hereinafter”;
b. In paragraphs (b) and (d), remove “§ 206.206” wherever it appears and
add in its place “§ 206.207”;
c. In paragraph (e)(4), remove the words “Project Worksheet(s)” and add
in their place the words “Project Application(s)”; and
d. In paragraph (k)(3), remove the word “shall” and add in its place the
word “will”.
Subpart H—Public Assistance Eligibility
§ 206.220 [Amended]
18. Amend § 206.220 as follows:
a. In the first sentence, remove the words “public assistance” and add in
their place the words “Public Assistance”; and
b. In the second sentence, add the word “the” after the words “must also
conform to”.
19. Revise § 206.221 to read as follows:
§ 206.221 Definitions.
Assistance animal means an animal that works, provides assistance, or performs
tasks for the benefit of a person with a disability, or provides emotional support that
alleviates identified symptoms or effects of a person’s disability. Although dogs are the
most common type of assistance animal, other animals can also be assistance animals.
Educational institution means:

(1) Any elementary school as defined by the Elementary and Secondary
Education Act of 1965, as amended, at title 20 U.S.C. 7801(19); or
(2) Any secondary school as defined by the Elementary and Secondary Education
Act of 1965, as amended, at title 20 U.S.C. 7801(45); or
(3) Any institution of higher education as defined by the Higher Education Act of
1965, as amended, at title 20 U.S.C. 1001(a).
Force account means an applicant’s own labor forces and equipment.
Household pet means a domesticated animal that is traditionally kept in the home
for personal rather than for commercial purposes, can travel in commercial carriers, and
be housed in temporary facilities. Household pets do not include reptiles (except turtles),
amphibians, fish, insects/arachnids, farm animals (including horses), and animals kept for
racing purposes.
Immediate threat means:
(1) Imminent danger requiring an urgent response to address serious risks to lives
or public health and safety, or to avoid damage from an incident; or
(2) The threat to lives or public health and safety, or of damage from an incident
that can reasonably be expected to occur within 5 years of the declared incident – for
flood incidents specifically, the threat from a 5-year flood (a flood that has a 20 percent
chance of occurring in any given year).
Improved property means a facility or item of equipment that was built,
constructed, or manufactured, or an improved and maintained natural feature. Land used
for agricultural purposes such as for crops and livestock is not improved property.
Private nonprofit facility means any private nonprofit educational (without regard
to the religious character of the facility), center-based childcare, utility, irrigation,
emergency, medical, rehabilitational, or custodial care facility, including a facility for

older adults or people with disabilities, and other facility providing essential social
services to the general public.
(1) Educational facility means a private nonprofit facility consisting of classrooms
plus related buildings, supplies, equipment, and utilities of an educational institution
necessary or appropriate for instructional, administrative, and support purposes.
(2) Center-based childcare means a private nonprofit facility that the State or
Tribal Department of Children and Family Services, Department of Human Services, or
similar agency, recognizes as a licensed childcare facility.
(3) Utility means a private nonprofit facility consisting of buildings, structures, or
systems of energy, communication, water supply, sewage collection and treatment, or
other similar public service facilities. Private nonprofit irrigation facilities are not
“utilities” and are defined below.
(4) Irrigation facility means those facilities that provide water for essential
services of a governmental nature to the general public. Irrigation facilities include water
for fire suppression, generating and supplying electricity, and drinking water supply; they
do not include water for agricultural purposes.
(5) Emergency facility means those buildings, structures, equipment, or systems
used to provide emergency services, such as fire protection, ambulance, or rescue, to the
general public, including the administrative and support facilities essential to the
operation of such emergency facilities even if not contiguous.
(6) Medical facility means any hospital, outpatient facility, rehabilitation facility,
or facility for long term care as such terms are defined in section 645 of the Public Health
Service Act (42 U.S.C. 291o) and any similar facility offering diagnosis or treatment of
mental or physical injury or disease, including the administrative and support facilities
essential to the operation of such medical facilities even if not contiguous.

(7) Rehabilitational facility means a facility that provides alcohol and drug
treatment and other rehabilitational services.
(8) Custodial care facility means those buildings, structures, or systems including
those for essential administration and support, which are used to provide institutional care
for persons who require close supervision and some physical constraints on their daily
activities for their self-protection, but do not require day-to-day medical care.
(9) Essential social service facility means a private nonprofit facility that is a
museum, zoo, performing arts facility, community arts center, community center, library,
homeless shelter, senior citizen center, rehabilitation facility, shelter workshop, food
bank, broadcasting facility, house of worship, or a facility that provides health and safety
services of a governmental nature. Such a facility must provide essential social services
to the general public.
Private nonprofit organization means any nongovernmental agency or entity that
currently has:
(1) An effective ruling letter from the U.S. Internal Revenue Service, granting tax
exemption under sections 501(c), (d), or (e) of the Internal Revenue Code of 1986, as
amended;
(2) Satisfactory evidence from the State or Indian Tribal government that the
organization or entity is a nonprofit one organized or doing business under State or Tribal
law; or
(3) If the organization is exempt from the requirement to apply for 501(c)(3)
status and is exempt from requirements to apply for tax exempt status under applicable
State or Tribal law, the organization must provide articles of association, bylaws, or other
organizing documents indicating that it is an organized entity and a certification that it is
compliant with Internal Revenue Code section 501(c)(3) and State or Tribal law
requirements.

Public entity means an organization formed for a public purpose whose direction
and funding are provided by one or more political subdivisions of the State.
Public facility means the following facilities owned by a State, local, or Indian
Tribal government: any flood control, navigation, irrigation, reclamation, public power,
sewage treatment and collection, water supply and distribution, watershed development,
or airport facility; any non-Federal-aid street, road, or highway; and any other public
building, structure, or system, including those used for educational, recreational, or
cultural purposes; or any park.
Service animal means any dog that is individually trained to do work or perform
tasks for the benefit of an individual with a disability, including a physical, sensory,
psychiatric, intellectual, or other mental disability, as defined in the Americans with
Disabilities Act. Other species of animals, whether wild or domestic, trained or
untrained, are not service animals for the purposes of this definition.
Standards means codes, specifications or standards required for the construction
of facilities.
20. Amend § 206.222 by revising the introductory text, and paragraphs (b) and (c)
to read as follows:
§ 206.222 Applicant eligibility.
The following entities are eligible to apply for assistance under the State or Tribal
Public Assistance award:
*****
(b) Private nonprofit organizations or institutions which own or operate a private
nonprofit facility as defined in § 206.221.
(c) Indian Tribal governments or authorized tribal organizations and Alaska
Native villages or organizations, but not Alaska Native Corporations, the ownership of
which is vested in private individuals.

21. Amend § 206.223 as follows:
a. Revise paragraphs (a)(1) through (3), and (b) and (c);
b. Remove paragraph (d);
c. Redesignate paragraph (e) as paragraph (d); and
d. Add new paragraph (e).
The revisions and addition read as follows:
§ 206.223 General work eligibility.
(a) * * *
(1) Be required as the result of the emergency or major disaster incident;
(2) Be located within the designated area of an emergency or major disaster
declaration, except that sheltering, evacuation, and emergency operation center activities
may be located outside the designated area; and
(3) Be the legal responsibility of the eligible applicant.
(b) Private nonprofit. For work to be eligible, it must be performed on a private
nonprofit facility as defined in § 206.221 that is owned or operated by an organization
meeting the definition of a private nonprofit organization as defined in § 206.221.
(c) Rural community, unincorporated town or village, or other public entity
facilities. Work performed on these facilities may be eligible when an application is
submitted through the State or a political subdivision of the State.
* * * * *
(e) Duplication of Benefits. The subrecipient must notify the recipient of any
benefits anticipated from any source for the same purpose as FEMA funding. The
recipient has a continuing obligation to notify FEMA of any benefits available to the
subrecipient that address the same work. Recipients and subrecipients must pursue
recovery of all available benefits, including those from potential third-party liability.

FEMA will disallow or recoup from the recipient amounts that would constitute a
duplication of benefits.
22. Amend § 206.224 by revising the introductory text to paragraph (a) and
paragraphs (a)(4) and (b) to read as follows:
§ 206.224 Debris removal.
(a) Public interest. When FEMA determines that it is in the public interest to
remove debris and wreckage from publicly and privately owned lands and waters, the
Regional Administrator may provide assistance for the removal of such debris. Debris
removal is in the public interest when it is necessary to:
* * * * *
(4) Mitigate the risk to life and property by removing substantially damaged
structures and associated appurtenances as needed to convert property acquired through a
FEMA hazard mitigation program to uses compatible with open space, recreation, or
wetlands management practices. Such removal must be completed within two years of
the declaration date, unless the Regional Administrator extends this period.
(b) Debris removal from private property. When it is in the public interest for an
eligible applicant to remove debris from private property in urban, suburban, and rural
areas, debris removal is eligible. This may include large lots but does not include areas
used for crops and livestock or unused areas.
* * * * *
23. Amend § 206.225 as follows:
a. Revise the section heading;
b. Revise paragraphs (a)(2), (a)(3)(i) and (ii), and (c) and (d);
c. In paragraph (b), remove the word “events” and add in its place the
word “incidents”; and
d. Add paragraphs (e) and (f).

The revisions and addition read as follows:
§ 206.225 Emergency protective measures.
(a) * * *
* * * * *
(2) In determining whether emergency protective measures are required, the
Regional Administrator may require certification by local, State, Tribal, or Federal
officials that a threat exists, including identification and evaluation of the threat and a
recommendation of the emergency protective measures necessary to eliminate, lessen, or
avert the threat.
(3) * * *
(i) Eliminate, lessen, or avert immediate threats to life, public health, or safety; or
(ii) Eliminate, lessen, or avert immediate threats of significant damage to
improved public or private property through measures that are cost-effective.
*****
(c) Emergency communications. FEMA may provide direct Federal assistance in
accordance with § 206.209 for effective emergency communications necessary for the
purpose of carrying out disaster relief functions as deemed appropriate. This includes
furnishing appropriate auxiliary aids where necessary to afford an individual with a
disability an equal opportunity to participate in, and enjoy the benefits of, disaster relief
functions. Emergency communications are intended to supplement but not replace normal
communications that remain operable after a major disaster.
(d) Emergency public transportation. FEMA may provide direct Federal
assistance in accordance with § 206.209 for emergency public transportation to meet
emergency needs and to provide transportation, including but not limited to paratransit
services for individuals with disabilities, to public places and such other places as
necessary for the community to resume its normal pattern of life as soon as possible.

Such transportation is intended to supplement but not replace predisaster transportation
facilities that remain operable after a major disaster.
(e) Rescue, care, shelter, and essential needs of household pets and service and
assistance animals. The rescue, care, shelter, and provision of essential needs to
household pets and service and assistance animals is eligible. The work, tasks, or support
provided or performed by a service or assistance animal must be directly related to the
individual’s disability.
(f) Temporary relocation. Temporary relocation may be available for applicants
that own or operate a public or private nonprofit facility, including administrative,
support, and ancillary facilities essential to the operation of the facility, even if not
contiguous, that provides an eligible essential community service. Essential community
services are those services performed by governmental entities or private nonprofit
organizations that are necessary to save lives, protect and preserve property or public
health and safety, or preserve the proper function and health of the community at large.
Essential community services include, but are not limited to, emergency services (police,
fire protection, and rescue), emergency medical care, prisons, education, election and
polling, and utilities. This assistance may be eligible emergency protective measures if:
(1) the facility was damaged to the extent that it cannot be occupied safely, and
restoration cannot be completed without suspending operations of the facility for an
unacceptable period of time; or (2) the facility was not damaged but it lacks a critical
utility or operational item (such as potable water, electricity, or road access) and a
temporary facility would restore services to the community in less time than the
completed restoration of the disrupted critical utility or operational item at the current
facility.
24. Revise and republish § 206.226 as follows:

§ 206.226 Restoration of damaged facilities.
Work to restore (repair, reconstruct, or replace) eligible facilities on the basis of
the predisaster design, as defined in § 206.201, of such facilities as they existed
immediately prior to the disaster and in conformity with the following is eligible:
(a) Assistance under other Federal agency (OFA) programs. Assistance will not
be made available under the Stafford Act when another Federal agency has specific
authority to restore facilities damaged or destroyed by an incident which is declared a
major disaster.
(b) Beaches.
(1) Replacement of sand on an unimproved natural beach is not eligible.
(2) Improved beaches. Work on an improved beach may be eligible under the
following conditions:
(i) The beach was constructed by the placement of sand (of proper grain size) to a
designed elevation, width, and slope; and
(ii) A maintenance program involving periodic renourishment of sand must have
been established and adhered to by the applicant.
(c) Codes and standards.
(1) FEMA codes, specifications, and standards. Minimum codes, specifications,
and standards for repair and replacement of eligible facilities are the latest published
editions of relevant consensus-based codes, specifications, and standards that incorporate
the latest hazard-resistant designs and establish minimum acceptable criteria for the
design, construction, and maintenance of facilities for the purpose of protecting the
health, safety and general welfare of the facilities’ users against disasters.
(2) Other codes and standards. For the costs of Federal, State, Tribal, and local
repair or replacement codes and standards which change the predisaster construction of a

facility and are different, but not less stringent, than the applicable code, specification, or
standard established under paragraph (1) to be eligible, the codes and standards must:
(i) Apply to the type of restoration required;
(ii) Be appropriate to the predisaster use of the facility;
(iii) Be found reasonable, in writing, and formally adopted and implemented by
the State, local, or Indian Tribal government on or before the disaster declaration date or
be a legal Federal requirement applicable to the type of restoration;
(iv) Apply uniformly to all similar types of facilities within the jurisdiction of the
owner of the facility; and
(v) Be in effect and enforced at the time of a disaster.
(d) Disaster damage. Damage that is eligible for restoration under this section
must be a result of the major disaster. Deterioration, loss of useful life, or aging of a
facility are not disaster damage.
(e) Equipment and furnishings. If equipment and furnishings are damaged
beyond repair, comparable items are eligible as replacement items.
(f) Hazard mitigation. The Regional Administrator may approve or require costeffective hazard mitigation measures for restoration of facilities. The cost of any
approved hazard mitigation measures or requirements for hazard mitigation placed on
restoration projects by FEMA will be an eligible cost for FEMA assistance.
(g) Library books and publications. Replacement of library books and
publications is based on an inventory of the quantities of various categories of books or
publications damaged or destroyed. Cataloging and other work incidental to replacement
are eligible.
(h) Mitigation planning. In order to receive assistance under this section, the
State or Indian Tribal government applying to FEMA as a recipient must have in place a

FEMA approved State or Tribal Mitigation Plan, as applicable, in accordance with 44
CFR part 201.
(i) Private nonprofit facilities. Eligible private nonprofit facilities may receive
funding under the following conditions:
(1) The facility provides critical services, which include power, water (including
water provided by an irrigation organization or facility), sewer services, wastewater
treatment, communications (including broadcast and telecommunications), education,
emergency medical care, fire department services, emergency rescue, and nursing homes;
or
(2) The private nonprofit organization has applied for a disaster loan under section
7(b) of the Small Business Act (15 U.S.C. 636(b)) and
(i) The Small Business Administration has declined the organization's application;
or
(ii) Has eligible damages greater than the maximum amount of the loan for which
it is eligible, in which case the excess damages are eligible for FEMA assistance.
(j) Relocation.
(1) The Regional Administrator may approve funding for and require restoration
of a damaged facility that is not repairable, per paragraph (k)(1) of this section, at a new
location when:
(i) The facility is and will be subject to repetitive heavy damage;
(ii) The approval is not barred by applicable statutory or regulatory requirements;
and
(iii) The overall project is cost-effective.
(2) When relocation is required by the Regional Administrator, eligible work
includes land acquisition and the construction of ancillary facilities such as roads and

utilities, in addition to work normally eligible as part of a facility reconstruction.
Demolition and removal of the old facility is also an eligible cost.
(3) When relocation is required by the Regional Administrator, no future FEMA
funding for repair or replacement of a facility at the original site will be approved, except
those facilities that conform with an open space use in accordance with 44 CFR part 80.
(4) When relocation is required by the Regional Administrator, and, instead of
relocation, the applicant requests approval of an alternate project under § 206.204(b),
eligible costs will be limited to the estimate of restoration at the original location
excluding hazard mitigation measures, or actual project costs, whichever is less.
(5) If relocation of a facility is not feasible or cost-effective, the Regional
Administrator will disapprove Federal funding for the original location when he/she
determines in accordance with 44 CFR parts 9, 201, or subpart M of this part 206, that
restoration in the original location is not allowed. In such cases, the applicant may apply
for an alternate project.
(k) Repair vs. replacement.
(1) A facility is considered repairable when the estimated repair cost for disaster
damage does not exceed 50 percent of the cost of replacing the facility to its predisaster
design and function, and it is feasible to repair the facility so that it can perform the
function for which it was being used as well as it did immediately prior to the disaster.
(2) If a damaged facility is not repairable in accordance with paragraph (k)(1) of
this section, approved restorative work may include replacement of the facility. The
applicant may elect to perform repairs to the facility, in lieu of replacement, if such work
is in conformity with applicable standards. However, eligible costs must be limited to the
less expensive of repairs or replacement.
(3) An exception to the limitation in paragraph (c)(2)(ii) of this section may be
allowed for facilities eligible for or on the National Register of Historic Properties. If an

applicable standard requires repair in a certain manner, costs associated with that
standard will be eligible.
(l) Restrictions—(1) Converted facilities. If a facility was being used for
purposes other than those for which it was designed, the eligible cost of restoration will
be limited to the lesser cost of restoring the facility to its original design or to the design
for the purpose the facility was being used prior to the disaster.
(2) Inactive facilities. A facility that was not in active use at the time of the
disaster is not eligible except in those instances where the facility was only temporarily
inoperative for repairs or remodeling, or where active use by the applicant was firmly
established in an approved budget or the owner can demonstrate to FEMA’s satisfaction
an intent to begin use within a reasonable time.
§ 206.227 [Amended]
25. Amend § 206.227 as follows:
a. Remove the word “snowstorms” and add in its place the word
“snowfall”; and
b. Remove the word “event” and add in its place the word “incident”.
26. Revise and republish § 206.228 to read as follows:
§ 206.228 Allowable costs.
General policies for determining allowable costs are established in 2 CFR 200,
subpart E, subject to the more specific provisions set forth in this part and the Stafford
Act. Further exceptions to those policies as allowed in 2 CFR 200, subpart E and 2 CFR
200.102 are explained below.
(a) Eligible Force Account Equipment Costs. Reimbursement for ownership and
operation costs of applicant-owned equipment used to perform eligible work must be
provided in accordance with the following guidelines:

(1) Rates established under State or Tribal guidelines. In those cases where an
applicant uses reasonable rates which have been established or approved under State or
Tribal guidelines, in its normal daily operations, reimbursement for applicant-owned
equipment which has an hourly rate of $75 or less must be based on such rates.
Reimbursement for equipment which has an hourly rate in excess of $75 will be
determined on a case by case basis by FEMA.
(2) Rates established under local guidelines. Where local guidelines are used to
establish equipment rates, reimbursement will be based on those rates or rates in a
Schedule of Equipment Rates published by FEMA, whichever is lower. If an applicant
certifies that its locally established rates do not reflect actual costs, reimbursement may
be based on the FEMA Schedule of Equipment Rates, but the applicant will be expected
to provide documentation if requested. If an applicant wishes to claim an equipment rate
which exceeds the FEMA Schedule, it must document the basis for that rate and obtain
FEMA approval of an alternate rate.
(3) No established rates. The FEMA Schedule of Equipment Rates will be the
basis for reimbursement in all cases where an applicant does not have established
equipment rates.
(b) Force Account Labor Costs. The straight- or regular-time salaries and
benefits of a recipient's or subrecipient's permanently employed personnel are:
(1) Eligible in calculating the cost of eligible permanent repair, restoration, and
replacement of facilities under section 406 of the Stafford Act;
(2) Eligible in calculating the cost of eligible debris removal under sections 407
and 502(a)(5) of the Stafford Act; and
(3) Not eligible in calculating the cost of other eligible emergency protective
measures under sections 403 and 502 of the Stafford Act, except for those costs
associated with host state evacuation and sheltering, as established in § 206.202.

Subpart K—Community Disaster Loans
27. Amend § 206.361 as follows:
a. In paragraphs (a), (d), (e), and (g), remove the words “Disaster
Assistance Directorate” and add in their place the words “Recovery Directorate”
wherever they appear;
b. In paragraph (e), remove the word “extensions” and add in its place the
word “extension”;
c. In paragraph (f), remove the word “shall” and add in its place the word
“must” wherever it appears, and remove the word “nonFederal” and add in its
place the word “non-Federal”;
d. In paragraphs (g) and (h), remove the word “shall” and add in its place
the word “will” wherever it appears;
e. In paragraph (h), remove the word “grants” and add in its place the
word “awards”; and
f. Revise paragraph (b).
The revision reads as follows:
§ 206.361 Loan program.
* * * * *
(b) Amount of loan. The amount of the loan is based upon need, not to exceed 25
percent of the operating budget of the local government for the fiscal year in which the
disaster occurs, but must not exceed $5 million; or, if the loss of tax and other revenues
of the local government as a result of the major disaster is at least 75 percent of the
annual operating budget of that local government for the fiscal year in which the major
disaster occurs, the amount of the loan must not exceed 50 percent of the annual
operating budget of that local government for the fiscal year in which the major disaster

occurs, and must not exceed $5 million. The term fiscal year as used in this subpart
means the local government’s fiscal year.
* * * * *
§ 206.363 [Amended]
28. Amend § 206.363 as follows:
a. In paragraph (a)(1), remove the words “Disaster Assistance Directorate”
and add in their place the words “Recovery Directorate”; and
b. In paragraph (b)(1), remove the words “or emergency” from the first
sentence.
29. Amend § 206.364 as follows:
a. In paragraph (a)(1):
1. Remove the word “shall” and add in its place the word “must”
wherever it appears;
2. In the first sentence, remove the word “GAR” and add in its
place the words “Governor’s Authorized Representative (GAR) or Tribal
Authorized Representative (TAR)”; and
3. In the third sentence, remove the word “GAR” and add in its
place the words “GAR or TAR”.
b. In paragraph (a)(2), remove the words “Governor’s Authorized
Representative” and add in their place the words “GAR or TAR”;
c. In paragraphs (b)(1), (b)(3), and (b)(4), remove the word “shall” and
add in its place the word “must” wherever it appears;
d. In paragraphs (c)(1), (c)(2), (d)(2)(i) and (d)(2)(ii), remove the words
“Disaster Assistance Directorate” and add in their place the words “Recovery
Directorate” wherever they appear;

e. In paragraphs (c)(1) and (c)(2), remove the word “shall” and add in its
place the word “will” wherever it appears;
f. In paragraph (c)(2), after the word “sixty”, add the word “calendar”; and
g. Revise paragraph (d)(1)(ii).
The revision reads as follows:
§ 206.364 Loan application.
* * * * *
(d) * * *
(1) * * *
* * * * *
(ii) 25 percent of the operating budget of the local government for the fiscal year
in which the disaster occurs, but will not exceed $5 million; or if the loss of tax and other
revenues of the local government as a result of the major disaster is at least 75 percent of
the annual operating budget of that local government for the fiscal year in which the
major disaster occurs, 50 percent of the annual operating budget of that local government
for the fiscal year in which the major disaster occurs, and will not exceed $5 million. The
term fiscal year as used in this subpart means the local government’s fiscal year.
* * * * *

Deanne Criswell,
Administrator,
Federal Emergency Management Agency.